Loading...
HomeMy WebLinkAbout20091009 Ver 1_DCM Permit_20120514r t ur„ er r z tF A d N� I-'1e (t r -I lc w � )'1 .t P 11 tt>> k ii IS 1 Fx-a,ati 1 ind f 11 i` pit, rant to i�CGS 11- ?� Ls zed to Vtiilliam and Katherine league, 320 Buncombe Street, Raleagi , NC 2760 uthorizing development in Carteret County at adi Calico Creek, 1103 Oglesby Road, Crab Point Bay S/D as requested in the permittee s application dated 4/8109, including the attached workplan drawings (3), all dated revised 7/27/09 This permit issued on Mai 14, 2012 iv subject to compliance with the application (where consistent N ith the pen-nit) all applicable regulations special conditions and notes set forth below Any violation of these terms may be subject to fines imprisonment or civil action or may cause the permit to be null and void r f 1) Unless specifically altered herein this permit authorizes the addition of a boat lift and uses located in or over the water that are expressly and specifically set forth in the permit application No other structure whether floating or stationary shall become a permanent part of this docking facility without permit modification No non water dependent uses of structures shall be conducted on in or over public trust waters without permit modification (See attached sheets for Additional Conditions) 7 his permit action may be appealed by the permittee or other qualified pei ons within twenty (20) days of the issuing date An appeal requires resolution prior to woik initiation of continuance as the case may be y This permit must be accessible on site to Department } eisonnel when the project is inspected for compliance Any maintenance cork or project modification not covered litieunder requires further Division approval All work must cease when the permit expires on December 31, 2015 In issuing this permit the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program Signed by the authority of the Secretary of DENR and tl e Chairman of the Coastal Resour-es Commission _iraat i C D ,N i. D rectoi "D vis, )n of Coastal Man,-ement This permit and its conditions are hereby accepted Signature of Permittee I Y All i S i 1 t. 1L L�i�L 1�£ 2 Ft1 t t ' ed '> t T ( It-1J ^� (i ' _ t t C At at i x at ( '"'"apt s i r^ ie L ti the t -,rri tee ) 1 1 f 8 � 11�° 1 i '�Jti i� ' u (� � i1� � l` le S z er- -it c a(aj a e t to t %c a, Hi 011z ( w orK t Pie be mittee shall maintain the authorized ,N oik in good condition and i- , onfolmartce with the terms and conditions of this permit The permittee is not relieved of this requi ement if he abaneons the x pennitted activity without having it transferred to a third party a 5) This permit does not authorize the interference with any existing or proposed Federal pioject and the permittee shall not be entitled to compensation for damage to the authorized structure or work or injury which may be caused from existing or future operations undertaken by the United States in the public interest 6) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U S Coast Guard through regulation or otherwise on the authorized facilities At a minimum permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or x inclement weather 7) The authorized project is located within a primary nursery area (PNA) Therefore in accordance with T15A 07H 0208 of the Rules of the Coastal Resources Commission no new dredging or excavation k within the PNA shall be permitted New dredging in any manner including 'kic king' with boat propellers is not authorized This prohibition shall be applied and enforced throughout the entire existence of the permitted structure 8) This permit authorizes one new formalized boatslip in association with this docking facility General 9) The permittee understands and agrees that if future operations by the United States requires the removal relocation or other alteration of the structure or work authorized by this permit or if in the opinion of the Secretary of the Army or his authorized representative said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters the permittee will be required upon due notice from the Corps of Engineers to remove relocate or alter the work or obstructions caused ¢ thereby, without expense to the United States or the state of North Carolina No claim shall be made against the United States or the state of North Ca olina on account of an) such removal or alteration 5 10) This permit shall not be assigned, transferred sold or otherwise disposed of to a third party without the written approval of the Division of Coastal Management 11) The permittee and /or his or her contractor shall meet with a representative of the Division prior to project initiation i 1 3a 7I 7 t An I L L iva Y a� f -i I s x x, f s 4 z f r1 { J cet i or r a + 1 J+ i it n i i 1 C, Y F�lti 1P i� e Cj n) i Ot t f pry T 3 1 , t i P ( til 5 e titt z ( -ontut igie en vc Of 1 D a7 dL (03 of to tl ' nt ! -�-'1t of any ,zucll activi , tv tf, a detelrt nit oi, I pe "nl Lt °I IS fa, 4 ad K (Iai ma1j no bvater dependent act vlt,cs ale not autho Ized vlthln h ft%.' of t j>r nc,rm J hl), witel Jevel i