HomeMy WebLinkAbout20210451 Ver 1_Meeting Request Review_20210225 tie R�.'.
fr
DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
Environmental Qunfuy
ID#* 20210451 Version* 1
Regional Office* Winston-Salem Regional Office-(336)776-9800
Reviewer List* Dave Wanucha
Pre-Filing Meeting Request submitted 2/25/2021
........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Jerry Parker
Contact Email Address* japarker3@ncdot.gov
Project Name* Gatewood Rd Bridge Removal
Project Owner* NCDOT
Project County* Caswell
Owner Address: Street Address
1584 Yanceyville Street
Address Line 2
P.O. Box 14996
City State/Rovince/Region
Greensboro NC
Fbstal/Zip Cade Country
27415-4996 USA
Is this a transportation project?* Yes r No
Type(s)of approval sought from the DWR:
17 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
I— Individual Permit I— Modification
I— Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Please list all existing project ID's associated with this projects.*
17BP.7.R.130
Do you know the name of the staff member you would like to request a meeting with?
Dave Wanucha
Please give a brief project description below.*
NCDOT is proposing to remove Bridge#117 over Country Line Creek in
Caswell County. In order to do so,a temporary causeway will need to be
utilized which will result in stream impacts. NCDOT does not plan to
replace the bridge once removed.
Please give a couple of dates you are available for a meeting.
3/4/2021
3/10/2021
Please attach the documentation you would like to have the meeting about.
Gatewood Rd Permit Drawings.pdf 1.34MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
. I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
. I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature c
vttto
Submittal Date 2/25/2021
Reviewer Meeting Request Decision
.....................................................................................................................................................................................................................................................................................................................................................................................................................................................
Has a meeting been scheduled?* C Yes a No