Loading...
HomeMy WebLinkAbout20201854 Ver 1_More Info Received_20210301From:Burdette, Jennifer To:Trone, Rick V Cc:Norton, April R CIV USARMY CESAW (USA) Subject:[External] RE: Glenn Crossing DWR # 20201854 Request for Additional Information Date:Monday, March 1, 2021 1:21:58 PM Attachments:image002.png image003.png MulchTrailDetail.pdf 35-AWH18010 C5.09 Plan And Profile - SS A.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Rick, Thank you for your review of the application. Each item requested is provided below with our response. Please provide detailed information for the proposed greenway including engineering plans. Please explain if the proposed greenway meets the definition of “built-upon area” [15A NCAC 02B .0610(5)] as defined in G.S. 143-214.7(b2). Attached is a detail of the proposed trail construction. The greenway surface will be mulch and will receive only pedestrian and bicycle traffic. Therefore, it does not meet the definition of built-upon area, is categorized as deemed allowable and does not require an authorization. Please provide detailed engineering plans, profile views, and cross-sections of all proposed culverts for impact W1. These drawings must include details regarding pipe slope, pipe burial, etc. as applicable [15A NCAC 02H .0502(a) and (c) ] .0502(a)(9). Construction Drawing sheet C5.09 is attached showing the plan and profile of the greenway, sanitary sewer and force main co-located crossing of Wetland 1. The pipe slope of these culverts is between 1 and 2%. Please provide cross section details showing the provisions for aquatic life passage at the proposed culverts for impact W1 [15A NCAC 02H .0506(b)(1)]. Sheet C5.09 mentioned above shows that the culvert inverts are set at the wetland surface to allow aquatic life passage and are not buried to avoid draining the wetland. Please provide more details regarding avoidance and minimization of wetland impacts for this project at impact W1. [15A NCAC 02H .0506(b)(1)] 1. This should include alternative designs and layouts of the greenway trail where it crosses Wetland W1 a. Because the stream/riparian buffer/wetland bisects the property, the greenway trail crossing is unavoidable. It is provided to connect the portion of the community on the west side of the stream/riparian buffer/wetland to the east side by linking the common areas of each side including the recreational amenities. Moving the crossing downstream to avoid the wetland impact would impact additional riparian buffer and constitute a second crossing since the sanitary sewer easement is required in its location to provide service to all areas of the development. This would also route the greenway trail between houses instead of along common areas. The impact is minimized by co-locating the trail along the sanitary sewer easement. 2. You have indicated the proposed sewer easement at impact W2 precludes the use of a boardwalk for the greenway in this location. Please explain, in greater detail, why a boardwalk over Wetland W1 is not feasible at this location. a. The City of Durham Reference Guide for Development (2020-07-31) requires that sanitary sewer easements are drivable with no structures, trees or obstructions permitted within the easement. See Section 7: Sanitary Sewer System and Section 11.1: Engineering Section Notes. This is a link to the guidance: Reference-Guide-for-Development- (durhamnc.gov). Please let me know if you have any questions about the additional information provided or need any other information. Thanks, Jennifer Jennifer Burdette | Sr. Environmental Consultant, Water Resources McAdams 2905 Meridian Parkway, Durham, NC 27713 office 919. 361. 5000 x137 | direct 919.287.0743 | cell 919.422.3605 | burdette@mcadamsco.com www.mcadamsco.com | linkedin | twitter | instagram | join our team creating experiences through experience From: Trone, Rick V <rick.trone@ncdenr.gov> Sent: Wednesday, February 10, 2021 8:30 AM To: Burdette, Jennifer <burdette@mcadamsco.com> Cc: Norton, April R CIV USARMY CESAW (USA) <April.R.Norton@usace.army.mil> Subject: Glenn Crossing DWR # 20201854 Request for Additional Information Jennifer, On December 1, 2020, the Division of Water Resources (Division) received your application requesting a 401 Water Quality Certification and Buffer Authorization from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on-hold until all of the following information is received: Please provide detailed information for the proposed greenway including engineering plans. Please explain if the proposed greenway meets the definition of “built-upon area” [15A NCAC 02B .0610(5)] as defined in G.S. 143-214.7(b2). Please provide detailed engineering plans, profile views, and cross-sections of all proposed culverts for impact W1. These drawings must include details regarding pipe slope, pipe burial, etc. as applicable [15A NCAC 02H .0502(a) and (c) ] .0502(a)(9). Please provide cross section details showing the provisions for aquatic life passage at the proposed culverts for impact W1 [15A NCAC 02H .0506(b)(1)]. Please provide more details regarding avoidance and minimization of wetland impacts for this project at impact W1. [15A NCAC 02H .0506(b)(1)] 1. This should include alternative designs and layouts of the greenway trail where it crosses Wetland W1 2. You have indicated the proposed sewer easement at impact W2 precludes the use of a boardwalk for the greenway in this location. Please explain, in greater detail, why a boardwalk over Wetland W1 is not feasible at this location. Pursuant to Title 15A NCAC 02H .0502(e) / [isolated ] Title 15A NCAC 02H .1304(d) / 15A NCAC 02B .0714, the applicant shall furnish all of the above requested information for the proper consideration of the application. Please respond in writing within 30 calendar days of receipt of this letter by sending one (1) copy of all of the above requested information as a reply to this email or by submitting all of the above requested information through this link: https://edocs.deq.nc.gov/Forms/Supplemental-Information-Form (note the DWR# requested on the link is referenced above). If all of the requested information is not received within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be denied as incomplete. The denial of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Please be aware that you have no authorization under the Section 401 of the Clean Water Act or the Neuse Buffer Rules for this activity and any work done within waters of the state may be a violation of North Carolina General Statutes and Administrative Code. Thank you, Rick Trone 401 & Buffer Permitting Branch NCDEQ – Division of Water Resources (919) 707-3631 office 512 N. Salisbury Street, Suite 942-F, Raleigh, NC 27604 1617 Mail Service Center, Raleigh, NC 27699-1617 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties NOTE: THERE IS NO 100 YEAR BASE FLOOD ELEVATION ON THIS SITE C5.09 SS O/F "A", STA. 9+50 THRU STA. 22+50 SANITARY SEWER OUTFALL "A" AWH18010-CD-P2X:\Projects\AWH\AWH-18010\Land\Site Plan-Construction Drawings\Current Drawings\AWH18010-CD-P2.dwg, 2/12/2021 10:43:45 AM, Williams, SherrillPLAN AND PROFILECLIENTREVISIONS N0.DATE PROJECT NO.AWH-18010 FILENAME CHECKED BY WTO DRAWN BY SRW SCALE 1"=40'/1"=4' DATE 02. 09. 2021 GLENN CROSSING CONSTRUCTION DRAWINGS 3516 GLENN ROAD DURHAM, NORTH CAROLINA The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com PLAN INFORMATION FINAL DRAWING - RELEASED FOR CONSTRUCTION STARLIGHT HOMES NORTH CAROLINA L.L.C. 5711 SIX FORKS ROAD, SUITE 300 RALEIGH, NORTH CAROLINA 27609 PHONE: 919. 422. 7663 GRAPHIC SCALE 0 20 40 80 1 inch = 40 ft. MATCH L I N E - S E E T H I S S H E E T MATCH LINE - SEE THIS SHEETPUMP STATION (PUBLIC) RECREATIONAL OPEN SPACE AREA "6" (ALL-WEATHER GREENWAY TRAIL) RECREATIONAL OPEN SPACE AREA "6" (ALL-WEATHER GREENWAY TRAIL) DOG PARK RECREATIONAL OPEN SPACE AREA "3" (SOCCER FIELD/DOG PARK)STREET "E"(40' PUBLIC R/W) SUITABLE BACKFILL MATERIAL (TYP.) 1:1 SLOPE APPROX. 8.5' TRIPLE SHREDDED HARDWOOD MULCH. COMPACTED AND LAID UNIFORM GEOTEXTILE FABRIC (TYP.). NOTES: 1. PROVIDE MIN. 2% CROSS -SLOPE 2. INSTALL MULCH IN TWO 2" LIFTS 3. REFER TO GEOTEXTILE ENGINEER AND COMPACTED SUBGRADE AND SCARIFIED AND RECOMPACTED SUB -GRADE FOR ADEQUATE DRAINAGE. AND COMPACT AS REQUIRED. FOR GEOTEXTILE SPECIFICATION BACKFILL SUITABILITY. MULCH TRAIL N.T.S. EXISTING GRADE 1:1 SLOPE