Loading...
HomeMy WebLinkAbout20210455 Ver 1_4_17014_DWR OK_202102261 McHenry, David G From:Mitchell, Robert K Sent:Tuesday, January 5, 2021 8:14 AM To:McHenry, David G; Amschler, Crystal C CIV USARMY CESAW (USA); Chambers, Marla J Cc:Barnett, Kevin H; Breedlove, Patrick J Subject:RE: [External] RE: Tropical Storm Zeta storm repairs in Division 14 Okay. That makes sense to me. Thanks for the coordination. I don’t see any other issues other than what you and Crystal pointed out. No comments on any of the other projects. Kevin Mitchell Environmental Specialist II Division of Water Resources 401 & Buffer Transportation Permitting NC Department of Environmental Quality 828-296-4650 Office 828-231-1580 Mobile Email Kevin.mitchell@ncdenr.gov NC DEQ Asheville Regional Office 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 From: McHenry, David G <dgmchenry@ncdot.gov> Sent: Tuesday, January 5, 2021 8:10 AM To: Mitchell, Robert K <kevin.mitchell@ncdenr.gov>; Amschler, Crystal C CIV USARMY CESAW (USA) <Crystal.C.Amschler@usace.army.mil>; Chambers, Marla J <marla.chambers@ncwildlife.org> Cc: Barnett, Kevin H <khbarnett@ncdot.gov>; Breedlove, Patrick J <pjbreedlove@ncdot.gov> Subject: RE: [External] RE: Tropical Storm Zeta storm repairs in Division 14 It does not look real steep, but I would wildly guess in the 3-5% neighborhood. My gut tells me that resetting it with outlet lower would not help as much as trying to shore-up the outlet scour hole though. From: Mitchell, Robert K <kevin.mitchell@ncdenr.gov> Sent: Tuesday, January 5, 2021 8:06 AM To: McHenry, David G <dgmchenry@ncdot.gov>; Amschler, Crystal C CIV USARMY CESAW (USA) <Crystal.C.Amschler@usace.army.mil>; Chambers, Marla J <marla.chambers@ncwildlife.org> Cc: Barnett, Kevin H <khbarnett@ncdot.gov>; Breedlove, Patrick J <pjbreedlove@ncdot.gov> Subject: RE: [External] RE: Tropical Storm Zeta storm repairs in Division 14 2 Dave, Thank you for all of the detail and photos. That’s a big help. Do you know what the approximate slope of the culvert is at Cedar Creek Farm Road? Kevin Mitchell Environmental Specialist II Division of Water Resources 401 & Buffer Transportation Permitting NC Department of Environmental Quality 828-296-4650 Office 828-231-1580 Mobile Email Kevin.mitchell@ncdenr.gov NC DEQ Asheville Regional Office 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 From: McHenry, David G <dgmchenry@ncdot.gov> Sent: Monday, January 4, 2021 4:05 PM To: Amschler, Crystal C CIV USARMY CESAW (USA) <Crystal.C.Amschler@usace.army.mil>; Mitchell, Robert K <kevin.mitchell@ncdenr.gov>; Chambers, Marla J <marla.chambers@ncwildlife.org> Cc: Barnett, Kevin H <khbarnett@ncdot.gov>; Breedlove, Patrick J <pjbreedlove@ncdot.gov> Subject: RE: [External] RE: Tropical Storm Zeta storm repairs in Division 14 You are correct it is much wider at outlet of Cedar Creek Farm Road culvert. We will try to narrow it up as you mention to deepen the water in the pipe. Bridal Veil will likely need FWS coordination (due to tree cutting) and Patrick is going to submit that soon with a couple other slide repair projects from that storm that do not have stream impacts. After I sent this update I met with the USFS Ranger and our project engineer out there and it looks like we may be able to do the work all from disturbed areas. Still evaluating though, but otherwise I will submit this for NCDOT cultural resources to review and then coordinate with tribes as needed per the protocol. BTW, this pipe outlet will be perched as it was before but it has no implications for fish passage because of the waterfall immediately upstream, and because it is likely too small for fish anyway. Marla, would you be okay with us proceeding on Bridal Veil work during moratorium? As noted, there should be no fish in this stream and the slide is continuing to lose dirt, so I think it would probably be better to proceed when we can. Thanks DAve 3 From: Amschler, Crystal C CIV USARMY CESAW (USA) <Crystal.C.Amschler@usace.army.mil> Sent: Monday, January 4, 2021 2:16 PM To: McHenry, David G <dgmchenry@ncdot.gov>; Mitchell, Robert K <kevin.mitchell@ncdenr.gov>; Chambers, Marla J <marla.chambers@ncwildlife.org> Cc: Barnett, Kevin H <khbarnett@ncdot.gov>; Breedlove, Patrick J <pjbreedlove@ncdot.gov> Subject: [External] RE: Tropical Storm Zeta storm repairs in Division 14 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Dave, Thanks for this email and keeping us in the loop. Below are my comments. Cedar Creek Farm Road: I’m a little confused looking at the picture. This stream seems much wider at the outlet than the pipe. I’m assuming this was existing scour at the outlet and the creek is more narrow upstream and downstream? If that’s the case, then I think adding rock is fine but it would also be helpful to build up the banks to narrow the stream and increase depth at the outlet, which would hopefully further promote fish passage. Let me know your thoughts on this. Bridal Veil Falls: US 64, UT Cullasaja River, Macon. – So if I’m following this one may need coordination with FWS for Indiana bat (if tree removal required), requires coordination for 106 and needs a trout moratorium waiver correct? Also sounds like this one is pretty urgent since you indicate it’s still getting worse. Its always best to get the permit in advance, but if the work needs to be completed before the necessary paperwork can get done to get a permit verification, I don’t have a problem with the work proceeding and DOT applying for the authorization after-the-fact as long as coordination with FWS, WRC, SHPO and the tribes (if necessary) is complete prior to any work starting. Since this is federally funded I assume that FHWA would take the lead on this coordination. I don’t have comments on any of the other projects. Sincerely, Crystal C. Amschler Project Manager Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28403 (828)-271-7980 Ext 4231 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at: http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 From: McHenry, David G <dgmchenry@ncdot.gov> Sent: Friday, December 18, 2020 9:55 PM To: Amschler, Crystal C CIV USARMY CESAW (USA) <Crystal.C.Amschler@usace.army.mil>; Mitchell, Robert K <kevin.mitchell@ncdenr.gov>; Chambers, Marla J <marla.chambers@ncwildlife.org> Cc: Barnett, Kevin H <khbarnett@ncdot.gov>; Breedlove, Patrick J <pjbreedlove@ncdot.gov> Subject: [Non-DoD Source] Tropical Storm Zeta storm repairs in Division 14 Folks, 4 I wanted to give you an update and seek guidance on federally funded storm repairs (with WOUS effects) in Division 14 following the last tropical storm (Oct 28?). The attached word document includes maps and pictures for the major damage sites that the environmental office has to some extent been involved with. The exception is the Cascade Lake Road slide repair that Kevin has coordinated with you all on. Here’s summaries and points where we request your guidance please (in bold): · All projects except the Bridal Veil falls and Cascade Lake failures are no effect for T&E. We may have tree cutting on Bridal Veil and Patrick is going to seek Indiana bat concurrence from Holland on that. BTW, we surveyed for rock gnome due to limited habitat that is present at Bridal Veil - negative. Cascade Lake is MANLAA from elktoe. · There should be no 106 issues on these (all work is essentially within disturbed roadways or slide zones and nothing is nearby per HPO data) with possible exception of Bridal Veil project. We anticipate seeking 106 review due to Bridal Veil being within the Cullasaja River Buffer and due to an eligible powerhouse nearby, though the powerhouse is not even visible from the work area. We coordinated with SHPO on Cascade Lake and Renee indicated no effect on the powerhouse that is near that slide. · No Wild and Scenic River sites. · Sediment impacts on trout from any of the projects were likely avoided or are not anticipated, aside from sedimentation that may likely occurred during the actual storm and the wash-outs. We have to do the work at Bridal Veil and US 64 near the Macon/Jackson line and would like to know if the trout moratorium could be waived for those due to the urgent nature, particularly at Bridal Veil which is getting progressively worse. It should be no problem to dewater these construction areas and trout are not present in the streams at or near the sites. Please advise Marla. Note, we were not initially anticipating impacts to water on a few of the completed projects, which is why we did not consult regarding trout implications. However, all completed projects should have had no effect on trout spawning. · With possible exception of Cedar Creek Farm Road, none of the projects are likely to affect fish passage. On that one we can probably add some large rock to the outlet to help backwater the culvert and promote fish passage. I think that would be better than resetting the pipe outlet further below grade because that would make the pipe steeper and have higher velocities. Please provide thoughts on this. · All projects did or will replace only existing permanent fills and in terms of scope would meet non-notify thresholds. Also, I think they would not need written 401s. As noted, bridal veil and Cascade lake need written permits due to MANLAA calls for T&E. Regarding other projects, please advise if you need additional permitting action or have any other guidance. Hope this information is helpful and we appreciate your guidance. Sorry for the delay in coordinating further. We are still working on efficient ways to review, track and coordinate on storm damage repairs, so any thoughts on this too would be appreciated. Dave McHenry NCDOT Division 14 DEO 828/586-2141 office 828/246-7078 cell Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.