Loading...
HomeMy WebLinkAboutNCC211133_ESC Approval Submitted (2)_20210301ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality December 23, 2020 LETTER OF APPROVAL WITH MODIFICATIONS Primax Properties, LLC Attn: William Seymour 1100 E Morehead Street Charlotte, North Carolina 28204 RE: Project Name: Tractor Supply Company Acres Approved: 3.95 Project ID: GRANV-2021-004 County: Granville City: Butner Address: E. Lyon Station Road River Basin: Neuse Stream Classification: Falls Lake Watershed Submitted By: Triangle Site Design, PLLC Date Received by LQS: December 11, 2020 Plan Type: Revised Dear Mr. Seymour: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGOI. Please direct questions about the eNOI form to Annette Lucas at Annette.Lucas(2ncdenr.gov or Paul Clark at Paul.Clark(a�ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. DEQ ,_ North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources 4��R'��/� Raleigh Regional Office 11628 Mail Service Center 13800 Barrett Drive I Raleigh, North Carolina 27609 NOR%H GAROLINA � 919.791.4200 Letter of Approval with Modifications Primax Properties, LLC Attn: William Seymour December 23, 2020 Page 2 of 4 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Dylan Reinhardt Assistant Regional Engineer Land Quality Section Rev. 05222020 Letter of Approval with Modifications Primax Properties, LLC Attn: William Seymour December 23, 2020 Page 3 of 4 Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCGO1 Fact Sheet cc: Regional Office file Triangle Site Design, Attn: Matt Lowder, PE (mlowderktrianglesitedesign.com) Rev. 05222020 Letter of Approval with Modifications Primax Properties, LLC Attn: William Seymour December 23, 2020 Page 4 of 4 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Tractor Supply Company Project ID: GRANV-2021-004 County: Granville REQUIRED: 1. Provide copies of access/encroachment agreements from NCDOT and for Duke Energy for the overhead power lines. (GS I I3A-54. I (a)) 2. Provide stockpile areas and dedicated areas for demolition, construction, and other wastes. These areas are to be within the limits of disturbance and should be located at least 50 feet away from storm drain inlets, temporary diversions, channels, and surface water bodies. Identify the location of these areas and structures on the plan sheets. Provide detail showing adequate E&SC measures around the stockpile areas. Silt fencing should be at least 5 feet from the toe of slopes to provide a broad, shallow sediment pool. (GS113A-57(3), 15A NCAC 04B .0105, 15A NCAC 04B .0106(5), GS113A-57(4), NCGO1 Section II.F) 3. Revise the filter bag detail 11 to include that pumps are to be located in the basin cell containing the skimmer device and dewater from the surface by use of a floating intake or acceptable alternative.. (GS 113A-57(3), 15A NCAC 04B .0113) 4. Revise the baffle configuration. The percent of surface area for each section divided by the baffle should be as follows: inlet zone 25%, first cell 25%, second cell 25%, outlet zone 25%. (GS 113A-57(3), 15A NCAC 04B .0113, 15A NCAC 04B.0106(4)) 5. Provide one half-size (I I"x17") copy of the plan set, showing the modifications required for approval. Provide a cover letter referencing the project name, project ID, and purpose for submittal. (G.S. 113A-57(4)) RECOMMENDATIONS: 1. Specify the areas and include in the construction sequence to: Seed, mulch and tack any bare soils between the perimeter measures and the base of the basin berm and diversions. Recommend this is done immediately upon installation. Per the NPDES Permit, ground stabilization will be applied within 14 calendar days from last land disturbing activity. For steep slopes, that area must be stabilized within 7 calendar days. 2. To prevent scouring and head cutting, extend the rip rap of the diversion to the bottom of the basin slope. 3. To prevent scour and head cutting, extend the rip rap of Apron #Ito the toe of the slope. Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities Rev. 05222020