Loading...
HomeMy WebLinkAbout20210194 Ver 1_Pre-Filing Meeting Request_20210129 tie fr DWR Pre-Filing Meeting Request Form NORTH CAROLINA Environmental Qunfuy ID#* 20210194 Version* 1 Regional Office* Mooresville Regional Office-(704)663-1699 Reviewer List* Donna Hood Pre-Filing Meeting Request submitted 1/29/2021 ........................................................................................................................................................................................................................................................................................................................................................................................................................................................ Contact Name* Michael lagnocco, PWS Contact Email Address* michael.iagnocco@stvinc.corn Project Name* McCullough Drive Streetscape Project Owner* City of Charlotte-Sharon Buchanan Project County* Mecklenburg Owner Address: Street Address 600 E Fourth Street Address Line 2 City State/Bovine/Region Charlotte NC Ibstal/Zip Code Country 28202 USA Is this a transportation project?* r Yes r No Type(s)of approval sought from the DWR: i7 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express Individual Permit I— Modification 1 Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Alan Johnson Please give a brief project description below.* The City of Charlotte Office of Engineering and Property Management proposes to make street improvements including adding sidewalks and bike lanes to the existing McCullough Drive from NC 24 (WT Harris Blvd)to the east of US 29(N Tryon Street). In addition, the city is proposing to create a new alignment on the east side of N Tryon Street that will connect McCullough Drive with E McCullough Drive. STV is providing design and Section 404.401 services on behalf of the City of Charlotte.A Preliminary Jurisdictional Determination package was issued by the USACE on April 18, 2016 (SAW-2016-00053). Its anticipated that the proposed design will require a new culvert as well as a culvert extension. Please give a couple of dates you are available for a meeting. 2/1/2021 2/2/2021 2/3/2021 2/4/2021 2/5/2021 Please attach the documentation you would like to have the meeting about. SAW-2016-00053 JD Tearsheet(4-18- 1.5MB 2016).pdf pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature . crfre allrocxv Submittal Date 1/29/2021