HomeMy WebLinkAbout20210194 Ver 1_Pre-Filing Meeting Request_20210129 tie
fr
DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
Environmental Qunfuy
ID#* 20210194 Version* 1
Regional Office* Mooresville Regional Office-(704)663-1699
Reviewer List* Donna Hood
Pre-Filing Meeting Request submitted 1/29/2021
........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Michael lagnocco, PWS
Contact Email Address* michael.iagnocco@stvinc.corn
Project Name* McCullough Drive Streetscape
Project Owner* City of Charlotte-Sharon Buchanan
Project County* Mecklenburg
Owner Address: Street Address
600 E Fourth Street
Address Line 2
City State/Bovine/Region
Charlotte NC
Ibstal/Zip Code Country
28202 USA
Is this a transportation project?* r Yes r No
Type(s)of approval sought from the DWR:
i7 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
Individual Permit I— Modification
1 Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Alan Johnson
Please give a brief project description below.*
The City of Charlotte Office of Engineering and Property
Management proposes to make street improvements including adding
sidewalks and bike lanes to the existing McCullough Drive from NC 24
(WT Harris Blvd)to the east of US 29(N Tryon Street). In addition,
the city is proposing to create a new alignment on the east side of N
Tryon Street that will connect McCullough Drive with E McCullough
Drive. STV is providing design and Section 404.401 services on
behalf of the City of Charlotte.A Preliminary Jurisdictional
Determination package was issued by the USACE on April 18, 2016
(SAW-2016-00053). Its anticipated that the proposed design will
require a new culvert as well as a culvert extension.
Please give a couple of dates you are available for a meeting.
2/1/2021
2/2/2021
2/3/2021
2/4/2021
2/5/2021
Please attach the documentation you would like to have the meeting about.
SAW-2016-00053 JD Tearsheet(4-18-
1.5MB
2016).pdf
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
. crfre allrocxv
Submittal Date 1/29/2021