HomeMy WebLinkAboutNCC200429_NOT Closeout Documents_20210226North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336)
776-9800
County: Forsyth Project: PNG Line 326 Phase 2 DOT Relocation River basin: Yadkin-PeeDee
Person financially responsible: PIEDMONT NATURAL GAS COMPANY Project #: FORSY-2020-023
INC - Aaron Weldon, Project Manager
Address: 4720 PIEDMONT ROW DR, Charlotte, NC 28210
1. Project Location: John M Gold Freeway, Stanleyville
Pictures: Yes - Digital
2. Weather and soil conditions: Cloudy, Wet Soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Eric Mercer Title: Environmental Compliance
Inspection report: Sent Report Date given/sent: February 18, 2021
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is released. Termination of
coverage under the NPDES General Stormwater Permit for Construction Activities should be
requested by the permittee via Notice of Termination.
Reported by: Tyler Pearson Others present:
Date of inspection: February 16, 2021 Time arriving on site: 8:45 AM Time leaving site: 10:30 AM
cc: