Loading...
HomeMy WebLinkAboutNCC200429_Notice of Termination_20210226Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 2/26/2021 1:20:20 PM (NOT Submittal) Approve by Morman, Alaina 2/28/2021 8:45:48 PM (NOT Request Review- NCC200429) • The task was assigned to Morman, Alaina. The due date is: March 3, 2021 5:00 PM 2/26/2021 1:20 PM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC200429 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status 2021 Annual Fee Status PAID Nby be blank (if not yet billed). Information associated with this permit: Project Name PNG Line 326 Phase 2 DOT Relocation Address John M Gold Freeway, Stanleyville, NC County Forsyth Latitude 36.2078 Longitude -80.3041 Permittee Listed Piedmaont Natural Gas Legally Responsible Aaron Weldon Individual NC Reference No. NCG01-2020-0429 E&SC Plan ID FORSY-2020-023 Original NOI 21455 Tracking No. Date COC Issued 2/5/2020 Prior Rescission Cate populates only if COCwas already rescinded at time of submittal. Date Reason for Rescission/Termination Request: Reason for r Project Closed -Out Termination of r Sale (Another Owner/Operator will apply for a new COC) Coverage * r Mistake or Invalid Coverage r Other Addional IVbre information about the basis of this request, if needed. Explanation Supporting upload Supporting Documentation if applicable. Documentation Mist beRYforrrat Project Close-out Information: Final Close-out 2/16/2021 Inspection Approval Project Close-out 02-16-2021 Closure Inspection Report (FORSY- Approval 244.56KB 2020-023).pdf Documentation Mast be FDFforrrat North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules ofthe Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). rJ I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Aaron Weldon Title * Senior Project Manager Organization* Piedmont Natural Gas Date * 02/26/2021 Email for aaron.weldon@duke-energy.com Confirmation * Contact Telephone* 704 731-4153 NOT Certification NOT Certification Form.pdf Form Mast be PDF Fornat Is this COC Already Ensure this CCChas not been rescinded since subrrittal! Rescinded? Additional Email CCd on Notification Errails (Optional) alicia.depalma@duke-energy.com Original Permittee CCdonNotificationErrails Email Aaron.Weldon@duke-energy.com Original Site Contact 0Cd on Notificaiton Errails Email Aaron.Weldon@duke-energy.com 34.25KB