Loading...
HomeMy WebLinkAboutWQ0042293_Application (FTSE)_20201222DWR Division of Water Resources 9r4-f-tvi 04-4 a -(° d �m• I4 toTyza - �' d 1, State of North Carolina Department of Environmental Quality Division of Water Resources 1 SA NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-I6 & SUPPORTING DOCUMENTATION Application Number: L/tiq20 0 1 CM13 (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: I. Applicant's name: Eli Lilly and Company (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ❑ MunicipaI ❑ Other 3. Signature authority's name: Daniel Lee VonDielingen per 15A NCAC 02T .0106(b) Title: Owner Representation 4. Applicant's mailing address: 893 Delaware Street City: Indianapolis State: IN Zip:46225- 5. Applicant's contact information: Phone number: (317) 276-2000 Email Address: vondielingen daniel 1@lilly.com I1. PROJECT INFORMATION: I. Project name: Project Blue Jay 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Durham 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.9355' Longitude:-78.8714' 5. Parcel ID (if applicable): 228347 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Wyatt Bone License Number: 040241 Firm: Bohler Engineering Mailing address: 4130 Parklake Ave, Suite 130 City: Raleigh State: NC Zip: 27615- Phone number: (91 1) 578-9000 Email Address: wbone@bohlereng.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: I. Facility Name: Triange WWTP Permit Number: NC002605 1 Owner Name: Durham County V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): I. Permit Number(s): WOUnknown Downstream (Receiving) Sewer Size: 21 inch System Wide Collection 5zeslegn Permit Numl►er(s) (if applicable is WQCS00038 Owner Name(s): Durham County NC Dept of Environmental Quaiitn Raleigh Regional Office FORM: FTA 04-16 Page I of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No EN,'A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No ®N/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Aereement (FORM: HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Residential Leased ❑ School / preschool / day care ❑ Food and drink facilities ® Businesses / offices / factories ❑ Retail (stores, centers, malls) ❑ Retail with food preparation/service ❑ Medical / dental / veterinary facilities ❑ Church ❑ Nursing Home 5. Nature of wastewater : % Domestic/Commercial ❑ Car Wash ❑ Hotel and/or Motels ❑ Swimming Pool /Clubhouse ❑ Swimming Pool/Filter Backwash ❑ Other (Explain in Attachment) % Commercial 100 % Industrial (See 15A NCAC 021 _0103(20)) �Is there a Pretreatment Program in effect? ® Yes 6. Has a flow reduction been approved under I5A NCAC 02T .0114( fl? ❑ Yes ® No > lives. provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: ❑ No Establishment Type (see CZT.0114(f1) Daily Design Flow ..e No. of Units Flow Non -Residential Development 105,236 gal:day 1 day 105,236 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total I05,236 GPD a See 15A NCAC 02T .0114(b). (d), (e)( I) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property Iocated south or east of the Atlantic Intracoastal Waterway 10 be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table ISA NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 105.236 GPD (per I5A NC'.. C 02I .0114) > Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VI1. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewer*: 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8" 2,035 PVC 8" 1,868 DIP 3 ciO3 ➢ Section II & I11 of the MDC for Permitting of Gravity Sewers contains information related to design criteria • Section III contains information related to minimum slopes for gravity sewer(s) > Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. OperationaI point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T ,0305(h)i I); ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)( I)(B)_ > Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day > Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - I SA NCAC 02T .0305(h)(1)(C): > It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. D If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(I)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (e) • 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer ssyste ® Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) I8 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches > 15A NCAC 02T.0305(g1 contains alternatives where separations in 02T.0305(f) cannot be achieved. • **Stream classifications can be identified using the Division's NC Surface Water Classifications webpagc t If noncompliance with 02T.0305(f1 or (g). see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ❑ NA ): See the Division's draft separation requirements for situations where separation cannot be meet • No variance is required if the alternative design criteria specified is utilized in design and construction S- As built documents should reference the Iocation of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑ No ❑ NIA D This would include Trout Buffered Streams per I5A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or individual permits or 401 Water Quality Certifications? • Information can be obtained from the 401 &Buffer Permitting Branch ❑ Yes ®No 5. Does project comply with 15A NCAC 02T.0I0c6) (additional permits/certifications)? ® Yes ❑ No Per I5A NCAC 02T.0105(c)(6) directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ NIA • If yes, include an attachment with details for each line, including type (aerial line, size, material, and Iocation). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per I5A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 ti CERIIFIC IIONti: 1 Ikrs the submitted yucin comply with J + L N.l .1LII1I the titturi n I ksirrir sir:; o frir itc .rmrnrn cif r!T1p SoaPsmb Pd I in (layo tt (1,741,11, and thct.rastr. motoriA.tralnisrntlil, )t:rtQuiasapplicable' 05[s ❑Nu If No. complete and submit the h'anarut. Ahermitn c Ikugn Request application 11 IIX Ir)-I 1I and roppanrri d.xvmtms for rn iCs. tnnrus al of ihr region. H mtalrrsI prior to %ohmItral of the Fist leach tpplirstioo and xupportfne document+, 2 Promo:analLnguseeriCrntt rirtan i, Wyatt Bone, PE IPrulcsuurul hnl user's lurnc limn Application Item III auras that du+ app'rcatwo fur his been resins ed by me and 1: accurate. nnrtpletc and cumrtt tit with the mf trrnatwn suppled m the pLuu spertfunr..-rs. engrncerurg suletlationc. oral all other supporting Jucumtcnutl.rn to the hew of n) lnuwlcdye 1 further wilt that fit the best of cry taboo ledge the unmixed des,fm his born prrparctil in acnsd.utce malt the apptinhk regulations. (,nsa) Sewer 1lrmmu'n lk-ugn t ntena for t irasuy Sewers aunt tcniani. and the htuurnu n 13cstg t 4 nitro for the Fast -Track Pant tong of Pump Stations and Fame Muni 'Lux, ,anoint Although other pmfcnianals Ituy tuts Jcsclopcd ccruin ptxunns of dill submittal package.,n:Iuumi of these maieruh under my signature and seal signifies that I fuse mimed Ilses material aril 'use polgrJ it to he cerisrstent %ail the prop.s.nd design NOTE — In a:a,rtixkc nulh (icnmi Statutes 1411-2I5 hA rind 141= 15 nIT any person uhn L ws%m .) nukes any false statement rrprewta_sttun. ar cerufi:auon man) application package thrill tic guilty of a Coatis 2 mndentcanar, w hsch nuy .mood: s fine ntu to e.cred CIO OM. at well as [n d perutues up to S25 IIU(1 per' iol tr,on. r+'sa, 7 North Carolina Professional I:ncinccr'+seal, signature. and date: ` ,,.o,t' C�Slpr._ .1,-:'---_, . , - oft 4'L�.:I• „ e4131140' .C• i'1?. L `sa, 3 Applicant's Ccrtrftcatton per I5A \CAL' 02T IiIOt01- I. Datsie Lte Vie"..-11e r.'+A/s , e�r,r+r� •f-ear•+,•:y ancrdui this application for (Signature Authnntl •+ ate & title m ,Ipphcalrnn Item 13 1 e. Js re, /44 C-s�. i.et�.,, „.e•6h+JC� lus bait rsstoic-4 by me un1 is act me and complete to the boa of my Imam ledge. I undrnlanJ that if all requrr:'parts or it is application air nut completed and that Ball required suppurtmg ducumcntauon and atueluncnts air nut insluJnl. this appirtaiurn package is suhlcct I,t bong returned as incomplete I nos:rstand that ant discharge of wast_watcr from ihts nan- 1i .chsryrc system to surface waicrs or the land will result in an immediate enforcement action that nu) Include en it penalticr_ misutctne relief. anst or cnmtrul prnsccuuon. I will make no claim against the Donlon of W,'ter Resources +lipoid a cnndtttnn of this permit be I IQIaiCJ I aim understand that tail required part: of this appIrcatran ,package arc not completed and ih:a if Ell required mipponmg mfornration and anachmcnls are lint included. this application package mull he ictumed to me as rn:an•plcic \OTF — In occurdarce with General Sululrs tam--'ill±t and I 0-71 s r 11. any person who hnuwmils snakes arts take statement Iepresenuimn, as scmftcatiun in any application package shall be gushy of a Cla.% 2 nu.demeanor• which male in::ude a tune nal to exceed S!UJKS' as w ell as cis tl peuuII.cc up to 525.000 per s uotat:on Signature 2),4014. Dat: - ZdZ.o a8-J4M- Zoe 1 FORM I -TA 0-1-14 Pagc 5 of 5 Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Eli Lilly and Company Project Name for which flow is being requested: Project Blue Jay More than one FTSE may be required for a single project Yale owner of the WIVTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Triangle Wastewater Treatment Plant b. WWTP Facility Permit #: NC0026051 All flaws are in MGD c. WWTP facility's permitted flow 12 d. Estimated obligated flow not yet tributary to the WWTP 2.032 e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 3.503 0.105236 5.640 47.0 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pl), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** N/A * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Durham County Sewer Downstream Permit Number: WQCS00038 Page 1 of 6 FTSF 10-1R III. Certification Statement: I 53c i.pi-)a1►Q Ori MAI certify to the best of my knowledge that the addition of the volume bf wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. t I �`U�li �Nl I a I 18 I aD Signing Offal Signature Date MktLtdriK- Title of Sign jg Official Page 2 of ti PTSV I fl-I R NORTH CAROLINA Department of the Secretary of State CERTIFICATE OF AUTHORIZATION I, Elaine F. Marshall, Secretary of State of the State of North Carolina, do hereby certify that ELI LILLY AND COMPANY a corporation organized under the laws of Indiana was authorized to transact business in the State of North Carolina by issuance of a certificate of authority on the 21 st day of July, 1965. I FURTHER certify that the said corporation's certificate of authority is not suspended for failure to comply with the Revenue Act of the State of North Carolina; that the said corporation's certificate of authority is not revoked for failure to comply with the provisions of the North Carolina Business Corporation Act; that its most recent annual report required by G.S. 55-16-22 has been delivered to the Secretary of State; and that a certificate of withdrawal has not been issued in the name of the said corporation as of the date of this certificate. Scan to verify online. Certification## 107012541-1 Reference# 16092188- Page I of 1 Verify this certificate online at http:l/www_sosnc.gov/verification IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal at the City of Raleigh, this 9th day of April, 2020. Row,.� wee Secretary of State E USGS U.S. DEPARTMENT OF THE INTERIOR U.S. GEOLOGICAL SURVEY science farachanging world 1 0.5 1000 500 1 0.5 0 0 %�. [I i KILOMETERS 1 METERS 1000 0 SOUTHEAST DURHAM QUADRANGLE NORTH CAROLINA 7.5-MINUTE SERIES 2 2000 1 MILES 1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 FEET CONTOUR INTERVAL 10 FEET NORTH AMERICAN VERTICAL DATUM OF 198a This map was produced to conform with the NC Dept of Environmental Quality DEC 2 7 2020 RR7)h Regional Office 4130 ParkLako Avenue, Suite 130 Raleigh, NC 27612 PHONE 919.578.6000 BOHLER ENGINEERING NC, PLLC BOHLER NCDEQ Water Quality 1628 Mail Service Cent Raleigh. NC 27(99 Re Project Blue Jay 59 Moore Drive Durham, NC 27703 Durham County BE # NCK 192094 NCDEQ Water Quality. Dale. 12. 02/2020 1 he included package is a submittal for the Project Blue Jay for review and approval, The subject snc is located at 59 Moore Drive in Durham, NC. Currently the site is undeveloped woodlands and the project is a Lit Lilly Research and Development Industrial Campus kk th accompanied parking, utilities. and stormwater system Specifically, the pmject has 2.035' of 8" PVC & 1.868' of 8" DIP sewer line running across the site and connecting to an existing tnanholc. The total calculated wastewater amount flowing through the system will be 105,236 GPD which includes all proposed buildings and facilities on site. There arc no downstream pump stations and the system flous directly to the lVWTP via gravity line Included in this package is the following. • Fast track Sewer System Extension Application • Flow Tracking fur Sewer Extension Application • Aerial Map of Site • USGS Topo Map • Utility Plans • Check in the amount of S480.00 Should you have any questions regarding ihis project or require additional information please do not hesitate to contact me at (919) 578-9000. Sincerely, Gary Turawski, P I l3uhlcr 1'ngm1:cring NI. PLI C CIVIL AND CONSULTING ENGINEERS d PROJECT MANAGERS • SURVEYORS + ENVIRONMENTAL CON5u>~TANTS • LANDSCAPE ARCHITECTS MfW W.eOHLERENG1NEERING.COM 2/8/2021 Mail - Cashion. Ted - Outlook «) Reply all ' ® Delete ® Junk Block RE: [External] FW: Action Needed - Lilly Executive Officer in NC - Project Blue Jay fast track sewer extension application 0 You replied on Mon 2/8/2021 10:32 AM c Chirichella II, Vincent J. <vchirichella@dconc.gov> Mon 2/8/2021 9:40 AM To: Cashion, Ted; Robinson, Jason; Deck, Erin M Cc: Brixey, Stephanie; Darner, Elyssa #edarner@dconc.g❑v> +2 others CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good morning Ted, I am following up from your email below regarding the calculation of flow for Project Bluejay. The flows listed below were provided by an Eli Lilly and Company Engineering Advisor based on their anticipated flows for this facility. Process Water 75,492gpd Domestic 10,000gpd Boiler/Cooling Tower 18,600gpd Laboratory 1,000gpd Other: Compressed Air 144gpd Total 105,236gpd Let me know if there are any additional questions. Thank you. Vincent Chirichella, PE SR. PROJECT MANAGER BEODURHAM COUNTY �a 5926 Highway 55 East Durham, North Carolina 27713 Office: (919) 560-9039 I Fax: (919) 544-8590 Email: vchirichella@dconc gov From: Brixey, Stephanie <sbrixey@dconc.gov> Sent: Sunday, February 7, 2021 4:46 PM To: Chirichella II, Vincent J. <vchirichella@dconc.gov>; Darner, Elyssa <edarner@dconc.gov> Subject: FW: [External] FW: Action Needed - Lilly Executive Officer in NC - Project Blue Jay fast track sewer extension application https:lloutlook.office365.com/mail/deeplink?version=20210201003.10&popoutv2=1 1/1