Loading...
HomeMy WebLinkAboutWQ0042260_Application (FTSE)_20210115DN 3a /! ❑ Federal ❑ State/County ® Municipal 3. Signature authority's name: Jay T. Meyers. PE per 15A NCAC 02T ,0106(b) Title: Public Utilities Director 4. Applicant's mailing address: 134 N. Main Street City: Fuquav-Varina State: NC Zip: 27526- 5. Applicant's contact information; Phone number (919) 567-3911 Email Address: imeyers rr,fuquav-varina.org II. PROJECT INFORMATION: I. Project name: South and Main 2. Application/Project status: DWR Division of Water Resources p-N a Is d f State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300— FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: W U v 0 LIZU6O (la be completed by DWR All items must be completed or the application will be returned I. APPLICANT INFORMATION: 0 1 1. Applicant's name: Town of Fuquav-Varina. NC (company, municipality, HOA, utility, etc.) 11 i rx, 2, Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Pu ❑ Other NC Dept of Environmental Quality JAN 15 2021 Raleigh Regional Office ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Wake 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.5678Q Longitude:-78.7968' 5. Parcel ID (if applicable): 066601 1773 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: I. Professional Engineer: Jim Chandler. PE License Number 026466 Finn: Timmons Group Mailing address: 5410 Trinity Road, Suite 102 City: Raleigh State: NC Zip: 27607- Phone number: (919) 866-4507 Email Address: jim.chandler{cptimmons.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1, Facility Name: North Harnett Regional WWTP Permit Number: NC002 1636 Owner Name: laarnett County V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): I. Permit Number(s): WQUnknown Downstream (Receiving) Sewer Size: 12 inch System Wide Collection System Permit Number(s) WQCS00193 Owner Name(s): Town of Fuquav-Varina FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®NIA 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? 0 Yes ❑No ®N/A 3. If the Applicant is a Home:Property Owners' Association, has an Operational Agreement (FORM: 1.1OA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply); X Residential Owned ❑ Residential Leased 0 School / preschool / day care ❑ Food and drink facilities ❑ Businesses / offices / factories ❑ Retail (stores, centers, malls) 0 Retail with food preparation/service ❑ Medical / dental / veterinary facilities ❑ Church ❑ Nursing Home ❑ Car Wash ❑ Hotel and/or Motels O Swimming Pool /Clubhouse ❑ Swimming Pool/Filter Backwash ❑ Other (Explain in Attachment) 5. Nature of wastewater : 100 °% Domestic/Commercial % Commercial % industrial (See 15A NCAC 02T .0103(20)) �Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Has a flow reduction been approved under I5A NCAC 02T.0I 140)? ® Yes ❑ No > If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f) J Daily Design Flow lo No. of Units Flow Residential - 4 bedroom 300 gal/day 153 45,900 GPD I a l 5 F aEJ - 1 t ' Lv `I gall GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD rota/ 45,900 GPD a See I5A NCAC 02T .01 I4(b). (d). (e)(I) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01 l4j shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 45.900 GPD (per 15A NCAC 02T .0114) > Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line El Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-I6 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T.0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 3,900 PVC 8 0 DIP 11f D Section I1 & 111 of the MDC for Permitting of Gravity Sewers contains information related to design criteria D Section I11 contains information related to minimum slopes for gravity sewer(s) D Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) - 02T.0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees); Latitude: " Longitude: - ° 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(I)(H)_ D Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day D Must be permanent to facility Or if the pump station has an average daily flaw less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T.0305(h)(I)(C): D It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. D If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(1)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & Le.) ➢ I SA NCAC 02T_0305t n contains minimum separations that shall be provided for sewer systems: ® Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class 1 or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-1 or WS-V), 9, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches > I SA NCAC 02T.0305(_u) contains alternatives where separations in 02T.0305(t) cannot be achieved. > **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage > If noncompliance with 02T.0305(fl or (t ). see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ❑ NIA > See the Division's draft separation requirements for situations where separation cannot be meet > No variance is required if the alternative design criteria specified is utilized in design and construction D As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per I 5A NCAC 02B .0200? ® Yes 0 No ❑ N/A D This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or individual permits or 401 Water Quality Certifications? • Information can be obtained from the 401 & Buffer Pcrmitting Branch 0 Yes ❑ No 5. Does project comply with ISA NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per I5A NCAC 02T.0 I 05(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ N/A • If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04- I6 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional gineer's Certi ication: jp 4 64 G .fir (Professional Engineer's name from Application Item III.I.) attest that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. 1 further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shalt be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: .. Sg! • (r - /0_-'� f�0 A -zr¢ 207 Ei7413C= 3. Applicant's Certification per 15A NCAC 02T .0106(b): C- Ti'i*('CGiOf_S attest that this application for (SiiiaturedAuthority's name & title from Application Item 1.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE - In accordance with General Statutes 143-2I5.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shalt be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: `--�j�v � Date: IZ 4 ZOil FORM: FTA 04-16 Page 5 of 5 OFF,9 State of North Carolina PG Department of Environment and Natural Resources Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE 06-13) Project Applicant Name: Town of Fuquay-Varina Project Name for which flow is being requested: South and Main More than one FTSE may be required for a single project tithe owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: North Harnett Regional WWTP b. WWTP Facility Permit #: NC0021636 All flows are in MGD c. WWTP facility's permitted flow 2.60 d. Estimated obligated flow not yet tributary to the WWTP 0.703 e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 1.204 0.046 I.953 75.12% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations Iocated between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity,* (Firm i pf), Daily FIaw, Daily Flow, Obligated Available Number) MGD MGD MOD MGD Flow Capacity*** * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pt) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Page 1 of 6 FTSF 06-1 l Certification Statement: I Jay T. Meyers, PE, Public Utilities certify to the best of my knowledge that the addition of Director the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. g official. ignature Z4 2OZ Date Page 2 of 6 r'rnr nr i -1 Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Town of Fuquay-Varina Project Name for which flow is being requested: South and Main a More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: North Harnett Regional WWTP b. WWTP Facility Permit #: NC0021636 c. WWTP facility's permitted flow Fuquay-Varina Allocated Flow Lillington Allocated Flow Angier Allocated Flow d. Estimated obligated flow not yet tributary to the WWTP FV Obligated Flow NYT Lillington Obligated Flow NYT HC Obligated Flow NYT Angier Obligated Flow NYT e. WWTP facility's actual avg. flow FV Actual Flow Lillington Actual Flow HC Actual Flow Angier Actual Flow f. Total flow for this specific request g. Total actual and obligated flows to the facility FV Actual Avg. + Obligated Flow Lillington Actual Avg. + Obligated Flow HC Actual Avg. + Obligated Flow Angier Actual + Obligated Flow h. Percent of permitted flow used Alilaws are in MGD 7.5 MGD 2.60 MGD 1.20 MGD 1.008 MGD 1.607 MGD 0.703 MGD 0.113 MGD 0.401 MGD 0.390 MGD 5.037 MGD 1.288 MGD 0.787 MGD 2.320 MGD 0.642 MGD 0.046 6.690MGD 2.037+ MGD 0.900 MGD 2.721 MGD 1.032 MGD 89.2% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: Page 1 of 4 FTSE 06-13 (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm / pt), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** SLS 120 14.4 5.76 3.021 1.412 4.433 1.327 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pl) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): North Harnett Regional WWTP Downstream Permit Number: NC0021636 III. Certification Statement I Steve Ward certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addend r or which I am the responsible party. Signature of this form indicates acceptance of this was ter flow. Signing Official Signature Date Page 2 of 4 FTSE 06-13 tate of North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross Jr., Secretary Gregory J. Thorpe, Ph.D., Acting Director November 7, 2001 Mr. Michael A. Allway, Assistant Town Manager Town of Fuquay-Varina 401 Old Honeycutt Road Fuquay-Varina, North Carolina 27526 Dear Mr. Allway_ NCDENR NORTH CAROLINA DEPARTMENT OR ENvIRDNMENT AND NATURAL RESOURCES NOV 0 8 2001 To m sd Mustwarina Subject: Town of Fuquay-Varina FIow Reduction Approval Wake County On September 10. 2001, the Division of Water Quality Non Discharge Permitting Unit received your flow reduction request for future and present, but not yet tributary, single-family dwellings in the Town of Fuquay-Varina, The letter requests approval of a residential flow value of 220 GPD/residence for these dwellings. The information provided water use information for 2000 and actual daily waste water flow recordings for their peak month of May. Other supporting data was provided. The evaluation covered 90 homes that are representative of the subdivisions in Fuquay-Varina in accordance with I5A NCAC 2H .0219(1)(3). Based on the information submitted, the Division hereby approves the use of 75 GPD per bedroom per dwelling for residential units (225 GPD per three bedroom home) in all applicable non -discharge permit applications for future sewer line extensions and present, but not yet tributary projects for the Town of Fuquay- Varina. The Division did note that the average flow per residence in February 2000 was 271 GPD. Regardless of the adjusted design daily wastewater flow rate. at no time shall the wastewater flows exceed the effluent limits defined in the Town's NPDES permit for the' treatment facility or exceed the c pacity of the sewers downstream of any new sewer extension. Please submit a separate letter to the Raleigh Regional Office that requests flow reductions for specific previously permitted projects (indicate permit number, project name,permitted flow, new flow under reduction and the difference_ between, them), If you have any questions or comments regarding this matter, please contact Marie Doklovic at (919)733-5083 ext. 371. cc: Raleigh Regional Office Flow Reduction File 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 An Equal Opportunity Affirmative Action Employer Gregory J. Thorpe, Ph.D. Telephone 919-733-5083 Fax 919-715-6048 50% recycled/10% post -consumer paper TIMMONS GROUP Project Engineers' Report Project Name. Location: PIN: Owners - Developer: Consultant: South and Main Fuquay Varina, Wake County, NC 0666-01-4713 Meritage Homes 3300 Paramount Parkway, Suite 120 Morrisville, NC 27560 Meritage Homes 3300 Paramount Parkway. Suite 120 Morrisville, NC 27560 Timmons Group Jim Chandler, PE 5410 Trinity Road, Suite 102 Raleigh, NC 27607 Phone: 919-866-4507 Project Description and Narrative: The proposed development is located at 1105 S Main St in Fuquay Varina, NC. The project proposes the construction of 24 single-family lots and 129 townhome lots. The project is anticipated to generate the following wastewater flows. 153 (4-BEDROOM) UNITS AT 300 GPD = 45,900 GPD TOTAL = 45,900 GPD The proposed gravity sanitary sewer system will consist of approximately 3,900 LF of 8" PVC. The new gravity sanitary sewer system will be owned, operated, and maintained by the Town of Fuquay Varina, 5410 TRINITY ROAD SUITE 102 • RALEIGH, NC 27607 • PHONE 919,866,4951 • FAX 919.859,5663 • WWW.TIMMONS.COM