DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnWircnmenred Quaffry
ID#* 20210192 Version* 1
Regional Office* Mooresville Regional Office-(704)663-1699
Reviewer List* Donna Hood
Pre-Filing Meeting Request submitted 1/27/2021
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Larry Thompson
Contact Email Address* Ihompson@ncdot.gov
Project Name* Bridge No. 101 on SR 2453(S Lentz Harness Shop Road)over Little Bear
Creek; 17BP.10.R020.1
Project Owner* NCDOT Highway Division 10
Project County* Cabarrus
Owner Address: Street Address
716 W Main Street
Address Line 2
City State/Bovine/Region
Albemarle NC
Fbstal/Zip Code Country
28001 USA
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
I� 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
I— Individual Permit I— Modification
I— Shoreline Stabilization
Does this project have an existing project ID#?*
c Yes No
Do you know the name of the staff member you would like to request a meeting with?
Donna Hood
Please give a brief project description below.*
NCDOT proposes to replace the existing functionally deficient bridge
on SR 2453(S Lentz Harness Shop Road)over Little Bear Creek with
a new bridge. STV Engineers is providing planning, design, and
Section 404/401 services on behalf of Division 10;a modified NRTR
in support of MCDC has been prepared;a delineation of waters of
the U.S. has been completed-jurisdictional waters of the U.S. in the
project area include Little Bear Creek, no wetlands were identified
within the study area.An off-site detour of approximately 9-miles is
required for the full duration of construction.The project has a Let
date of August 4, 2021.
Please give a couple of dates you are available for a meeting.
2/1/2021
2/2/2021
2/3/2021
2/4/2021
2/5/2021
Please attach the documentation you would like to have the meeting about.
R_159_Pipe_Cabarrus101_Figurel_WatersM... 2.64MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
. I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
. I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
(-20fre rrri&r,firrq kOal*?,,nr
Submittal Date 1/27/2021