HomeMy WebLinkAbout20170269 Ver 1_Handouts_20120614U.S. 70 and Slocum Road Improvements
Proposed Improvements
1. U.S. 70 and Slocum Road Intersection: An off- ramp /bridge over U.S. 70 would be
added to serve the current left -turn traffic from U.S. 70 to Slocum Road. The remaining
signal would be revised.
2. U.S. 70 and MacDonald Boulevard Intersection: This intersection would be removed
(due to the proximity to Slocum Road). A new connector road would link the neighborhood
to Pine Grove Road.
3. U.S. 70 and Pine Grove Road: This intersection would be revised for improved left turn-
ing movements (dual left turn lanes) from Pine Grove Road and Hickman Hill Loop Road
onto US 70.
4. Slocum Road: This road would be widened to four lanes to the existing MCAS entry
gate.
These improvement concepts are preliminary and may change as planning, environmental
and design studies develop, and input received at the upcoming public meeting is consid-
ered.
Intersection of U.S. 70 and Slocum Road
Example of an off -ramp /bridge over highway
(1 -295 in Richmond, VA)
Intersection of U.S. 70 and Pine Grove Road
Wal -Mart on U.S. 70
June 2012
What is next?
This meeting is the first step in a multi -step process used to continually refine the proposed project
and to minimize anticipated impacts to the natural and human environments. After comments re-
ceived at the Citizens Informational Workshop are considered and used to prepare a best -fit align-
ment, the following actions are anticipated:
Preliminary design;
• Agency coordination and Design Public Meeting; and
Publication of an environmental planning document that will present project impacts.
Page 2 Page 3
0 tAORTff U.S. 70 and Slocum Road Improvements
9
y 9 North Carolina Department of Transportation
a Z Project Development and Environmental Analysis Unit
Attn: Matthew Potter, P.E.
99 Q�Q 1548 Mail Service Center �^
F�OFTRAN Raleigh, NC 27699 -1548
C/N r 9 201 A
hr�S OS ��A�try
VtRh
* * * * * * * * * * * * * * * ** *AUT0" *3 -DIGIT 276 4 4
David Wainwright, Nc Dwq
1650 Mail Service Center
Raleigh, NC 27699 -1600
PRSRT STD
U.S. Postage
PAID
AlphaGraphics
27518
Written comments and questions are welcomed and may be mailed or emailed to:
North Carolina Department of Transportation
Project Development and Environmental Analysis Unit
Attn: Matthew Potter, P.E.
1548 Mail Service Center
Raleigh, NC 27699 -1548
Contact By Phone: (919) 707 -6036
Email: mwpotter @ncdot.gov
OR
Lou Raymond P.E., AICP
6201 Fairview Road, Suite 400
Charlotte, NC 28210
Contact By Phone: (704) 556 -5047
Email: lou.raymond @aecom.com
Craven County
Information Workshop —June
North Carolina Department of Transportation is hosting a Public
Ling on Thursday June 26, 2012 to discuss proposed improve -
ts to the intersection of U.S. 70 and Slocum Road in Havelock. 7
Ling will be held from 4 to 7 p.m. at the Havelock Tourist and
it Center. located at 201 Tourist Center Drive in Havelock.
zens may stop by at their convenience and there will not be a
nal presentation. However, NCDOT representatives will be available
iscuss the project on a one -on -one basis throughout the meeting.
a maps will be displayed and citizens will receive handouts and com-
it sheets.
meeting will provide the public an opportunity to participate in the
fining process. Comments and information received at the meeting
be used in conjunction with comments provided by environmental re-
✓ and regulatory agencies to help shape the project.
>ject Overview
proposed project consists of improvements to the intersection of U.S.
find Slocum Road in Havelock, NC. This intersection is projected to
e significant traffic congestion in the future as increased traffic is ex-
ted to and from the Marine Corps Air Station Cherry Point via the
;um Road Gate. The proposed project will improve the function of this
rsection and enhance access to Marine Corps Air Station Cherry
Connecting people and places safely and efficiently, with accountability and environmental sensitivity to enhance the economy,
health and well -being of North Carolina.