Loading...
HomeMy WebLinkAbout820445_30 Day POA_20210105PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 97524 and 97523 County: Sampson Facility Name: Norshan Farms Certified Operator Name: Shannon Naylor Operator Number: 1. Current liquid levels) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 82-316 #2 82=445 SOW 82-316 #1 Spillway(Y or N): N N N Level (inches): 15 14 17 2. Check all applicable items 22403 Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop nformation. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates for depopulation if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 1 /5l20 1 hereby certify that 1 have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Shannon Naylor Phone: 9109902547 Facility Owner/Manager (print) Shannon Naylor Date: #ff######## Facility Owner/Manager (signature) II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 82-316 #2 line m = 392.6 lb PAN 2. Structure ID: 82-445 SOW line m = 413.6 lb PAN 3, Structure ID: 82-316 #1 line m = 213.9 lb PAN 4. Structure ID: line m = lb PAN 5, Structure ID: line m = lb PAN 6, Structure ID: line m = lb PAN n.lines1+2+3+4+5+6= 1020.1 IbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD, DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q, crop r. acres s. remaining RR-2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application windolb 82-445 SOW PI -Sow Small Grain 4.21 25.00 105.3 Sep --March 82-445 SOW P2-Sow Small Grain 2.15 25.00 53.8 Sep --March 82-445 SOW P3-Sow Small Grain 2.00 25.00 50.0 Sep --March 82-445 SOW P4-Sow Small Grain 3.92 25.00 98.0 Sep --March 82-445 SOW P5-Sow Small Grain 4.021 25.00 100.5 Sep -March 82-445 SOW P6-Sow Small Grain 4.38 25.00 109.5 Sep -March 82-445 SOW P7-Sow Small Grain 4.90 25.00 122.5 Sep --March 82-445 SOW P8-Sow Small Grain 4.90 25.00 122.5 Sep --March 82-445 SOW P9-Sow Small Grain 3.81 25.00 95.3 Sep --March 82-445 SOW P10-Sow Small Grain 3.38 50.00 169.0 Sep --March 82-445 SOW P12-Sow Small Grain 1.59 50.00 79.5 Sep --March 82-445 SOW P11-Sow Small Grain 0.93 50.00 46.5 Sep --March 82-316 P1 Small Grain 4.64 20.00 92.8 Sep --March 82-316 P2- small Grain 4.41 20.00 88.2 Sep --March 82-316 P3- small Grain 2.64 15.00 39.6 Sep --March 82-316 P4-- Small Grain 2.00 30.00 60.0 Sep --March 82-316 P5-- Small Grain 2.46 10.00 24.6 Sep --March 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1457.5 lb. PAN IV. FACILITY'S PDA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = 1020A lb. PAN x. Crop's remaining PAN balance (line v from section 111) = 1457.5 Ib. PAN y. Overall PAN balance (w - x) _ 437 lb. PAN PoA (30 Day) 2/21/00 Line y must show as a deficit. If line y does not show as ad eficit, list course of action herein cluding pump and haul, depopulation, herd red ucbon, etc, For pump& haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option forlowering lagoon level, add thesefields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as PoA (30 Day) 2/21 /00 PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 82-316 #2 2. Current liquid volume in 25 yr.(24 hr. storm storage &structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft 3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 15.0 inches 19.0 inches 4.0 inches 37896 ft2 94487 gallons 180 days g. volume of waste produced according to structural design 85000 ft3 h. current herd # 1220 certified herd # 1220 actual waste produced = current herd # x line g = i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 10/20/20 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 3 Oft3 38500 ft3 153963 gallons 1.58 Ibs/1000 gal. 392.6 lbs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 82-445 SOW 2. Current liquid volume in 25 yr./24 hr. storm storage &structural freeboard aI current liquid level according to marker b. designed 25 yr.l24 hr. storm &structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft 3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 14.0 inches 19.0 inches 5.0 inches 97960 ft2 305309 gallons 180 days g. volume of waste produced according to structural design 85264 ft3 h. current herd # 1350 certified herd # 1350 actual waste produced = current herd # x line g = i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 dayslline f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 12/1/20 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 3 ft3 38500 It 154292 gallons 0.90 Ibs/1000 gal. 413.E lbs. PAN PoA (30 Day) 2/21(00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 82-316 #1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 17.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 2.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 23887 ft 2 e. line c/12 x line d x 7.48 gallons/ft 3 29779 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 8500 ft3 h. current herd # 1220 certified herd # 1220 actual waste produced = current herd # x line g = i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 10/20/20 m. ((lines e + k)l1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 3 0 ft3 38500 ft3 58593 gallons 2.42 Ibs/1000 gal. 213.9 lbs. PAN PoA (30 Day) 2/21/00