Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
820242_30 Day POA_20210106
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: e 2. - 2. County: 504in © i 1 .'acility Name: ��f i C-�1c��) F I v'e o i r s Certified Operator Name: ..,_,) to t+te, B\ r\c4 Operator # �ick 5 2j4- 1 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Fi V e. Lagoon Name/identifier (ID): Po'i AtS Spillway (Yes or No): Ro Asa Level (inches): t G 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section 111 tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 1-1- Zd2i I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Facilityy OwnerlManager (print) Facilit OwneriManer (signature) Phone: `l(C: - 385- ( &, 2..2- Date: ) (o - 20 21 PoA Cover Page 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): ) e. e r i e 1 d, 2. Current liquid volume in 25 yrJ24 hr. storm storage & structural freeboard a. current liquid level according to marker i inches b. designed 25 yr./24 hr. storm & structural freeboard 1 `t inches c. line b - line a (inches in red zone) = 3 inches d. top of dike surface area according to design 2.t 000 ft' (area at below structural freeboard elevation) e. line c x line d x 7.48 gallons = 14-L 8 8'0 gallons 12 ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design le) 0 days g. volume of waste produced according to structural design 1'0 4.8 ft3 1 h. actual waste produced = current herd # x line g = ict O + ft3 2(' ' i3 s certified herd # i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design 1p 60 ft3 k. (lines h + i +i) x 7.48 x 30 days = line f 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 2.-1- ao2sD m. (lines e + k) x line 1 = aoe) lb PAN 1000 200 gallons uck lb/1000 gal. ?EPEAT SECTION / FOR EACH WASTE STRUCTURE ON SITE II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): i \l e ?o 1 n` s 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 1 inches b. designed 25 yr./24 hr. storm & structural freeboard inches c. line b - line a (inches in red zone) _ ` inches d. top of dike surface area according to design 2 3`l-I 5 ft2 (area at below structural freeboard elevation) e. line c x line d x 7.48 gallons = P* 960 gallons 12 ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 1 BO days g. volume of waste produced according to structural design 19 048 ft3 h. actual waste produced = current herd # x line g = 16 '-}8 ft3 z o 's certified herd # i. volume of wash water according to structural design 0 ft3 J. excess rainfall over evaporation according to design 1.'4 000 ft3 k. (lines h + i +i) x 7.48 x 30 days = 41, ZOO gallons line f 4. Total PAN to be land applied during draw down period t2�t- 2.026 1. current waste analysis dated .90 lb/1000 gal. m. (lines e + k) x line I = 10'1 lb PAN 1000 ?EPr=AT SECTION I FOR EACH WASTE STRUCTURE ON SITE I. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA (30 Day) 2/21/00 1. structure ID: 2. structure ID: Five O' r s 3. structure ID: 4. structure ID: 5. structure ID: 6. structure ID: n. lines' +2+3+4+5+6 = line m = 2-:0 lb PAN line m = k 1 Ib PAN linem- lb PAN line m = lb PAN linem= Ib PAN line m = lb PAN \5 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN T UST FIELDS TO WHICH PAN CAN NOT BE APPLIES DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (lb/acre] t. TOTAL PAN BALANCE FOR FIELD Albs.) column r x s u. application window1 C i ii‘C'hec,Z.t ado 2_. -11,1b 2_O2L0e C2 WheA 2,7b ioo, '7 216. 1i`Z C3 t head e.i(o 1b2;9,1 234,o3 G 1 1A1\TN.A 2,82 31,S3 22.5,12_ G a \NhesZt ? ,62- 7O.51 1dleiPat Cr3 1h2ct 2, (03 (c)it%56 9639-1g J1 Whems_A 2. -1 165, 54 2k0,ios H i cone- Cro 2,95 30,00 g. s.o T 1 co+(e,Cro • 314 30.00 70,Lb 1 2 Co4er c 2 , 55 20a 1(o 51. 41 J 3 Cover crop 1 ,S2 2.1,"13 Yt,55 1'-1' C04 C) i ,SZ 2.5.e1 41. i.5e) 15 Cover Croe l .e2. "o.ut 5'r,aG State current crop ending application date or next crop application beginning date for available receiving crops during 30 day drawn down period v. Total PAN available for all fields (sum of column t) = a 0 \ Ib. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE PoA (30 Day) 2/21 /00 w. Total PAN to be land applied (line n from section II) = x. Crop's remaining PAN balance (line v from section III) y. Overall PAN balance (w - x) = 1i 1(0 lb. PAN Ib. PAN lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. if new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: PoA (30 Day) 2/21100