Loading...
HomeMy WebLinkAbout090203_30 Day POA_20210204PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 9-203 County: Bladen Facility Name: Mr. Holmes Complex Certified Operator Name: Victor Sutton Operator Number: AWA26076 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon 6 More on Lagoon Name/ID: 2042 3082 3084 3086 3081 4205 Next Page Spillway(Y or N): N N N N N N Level(inches): 20 24 13 15 20 21 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Murphy Brown, LLC Phone: 910-293-3434 Facility Owner/Manager (print) Facility Owner/Manager (signature) Date: 2/4/2021 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 9-203 County: Bladen Facility Name: Mr. Holmes Complex Certified Operator Name: Victor Sutton Operator Number: AWA26076 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 7 Lagoon 8 Lagoon 9 Lagoon 10 Lagoon 11 Lagoon 12 Lagoon 13 Lagoon Name/ID: 2106 3088 3090 3096 2004 3092 3093 Spillway(Y or N): N N N N N N N Level(inches): 27 20 22 22 29 23 23 2_ Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Murphy Brown, LLC Phone: 910-293-3434 Facility Owner/Manager (print) Facility Owner/Manager (signature) Date: 2/4/2021 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1- Structure ID: 2. Structure ID: 3. Structure 1D: 4. Structure ID: 5. Structure ID: 6. Structure ID: 7. Structure ID: 8. Structure ID: 9. Structure ID: 10. Structure ID: 2.84.2 3 Oct 3 3082 3084 3086 mei 3cPt 4205 2496 acx q 3088 3090 3096 line m = a,-11 D, ,CI Ib PAN line m = 2245.6 lb PAN line m = 3405.0 lb PAN line m = 2171.0 Ib PAN line m = 3 a,"t5,a1 lb PAN line m = 2690.9 lb PAN line m = Li , r'D Ib PAN line m = 3297.1 Ib PAN line m = 3103.1 Ib PAN line m = 1893.3 Ib PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 + 7 + 8 + 9 + 10 = 113506.0 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR-t. 2 PAN balance (Ib/acrej TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window H43 Wheat 120.01 40.45 4854.4 Sept -April A1-12 Wheat 92.55 48.43 4482.2 Sept -April A54-1 Small Grain 18.85 80.70 1521.2 Sept -April A54-2 Small Grain 49.79 80.70 4018.1 Sept -April H63 Wheat 61.54 94.59 5821.1 Sept -April H64 Wheat 102.58 80.39 8246.4 Sept -April PoA (30 Day) 2/21/00 State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 28943.3 Ib. PAN IV_ FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = x. Crop's remaining PAN balance (line v from section III) = y. Overall PAN balance (w - x) = 1.4 1Qt9 'i'3'61':0 lb. PAN 28943.3 Ib. PAN 40447 Ib. PAN y, , 43.01 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 3093 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 7344 certified herd # 23.0 27.7 inches inches 4.7 inches 268136 ft2 788892 gallons 180 247418 7344 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e } k)11000) x line I = 12/16/2020 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 247418 ft3 159055 156413 ft3 ft3 701731 gallons 1.82 Ibs/1000 gal. 2712.9 lbs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1_ Structure Name/Identifier (ID): 2. Current liquid volume in 25 yr./24 hr. s arm storage & structural freeboard a. current liquid level acco ing to marker 24.0 inches 3082 b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area (area at below structural according to design freeboard elevation) e. line c/12 x line d x 7.48 allons/lt 3. Projected volume of waste liquid prod ced during draw down period f. temporary storage perio according to structural design g. volume of waste produced according to structural design h. current herd # 7344 certified herd # 27.7 inches 3.7 inches 270481 ft2 627191 gallons 168 230924 7344 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over eval k. (lines h + i + j) x 7.48 x 4. Total PAN to be land applied during dr 1. current waste analysis d ted m. ((lines e + k)I1000) x line oration according to design 30 days/line f= w down period 12/16/2020 days ft3 230924 ft3 148451 157781 ft3 ft3 717487 gallons 1.67 Ibs/1000 gal. I = 2245.6 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRU6TURE ON SITE. (Click on the next Structure tab shown below) IPio (( 11 j) 2'21V PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD !. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 3084 2. Current liquid volume in 25 yr.24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr.I24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e_ line c/12 x line d x 7.48 gallons/ft-3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h_ current herd # 7344 certified herd # 13.0 19.8 inches inches 6.8 inches 282058 ft2 1195550 gallons 180 242116 7344 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 12/16/2020 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 242116 ft 0 164534, ft3 ft3 506957 gallons 2.00 Ibs/1000 gal. 3405.0 lbs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 3086 2. Current liquid volume in 25 yr_124 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/it 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 7344 certified herd # 15.0 19.8 inches inches 4.8 inches 246785 ft2 738381 gallons 180 242116 7344 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)11000) x line I = 12/16/2020 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 242116 ftj 0 143958 ft3 f3 481306 gallons 1.78 Ibs/1000 gal. 2171.0 Ibs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/ldentifier (ID): 3092 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 7344 certified herd # 23.0 L 31.6, inches inches 8.6 inches 267737 ft2 1435249 gallons 180 247418 7344 actual waste produced = current herd # x line g = certified herd # 1. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period 1. current waste analysis dated m. ((lines e + k)/1000) x line 1= 12/16/2020 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days f13 247418 ft3 156180 ft3 f3 503152 gallons 1.69 lbs/1000 gal. 3275.9 lbs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 4205 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr_/24 hr. storm & structural freeboard c_ line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallonse 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 10295 certified herd # 21.0 27.6 inches inches 6.6 inches 262630 ft2 1080460 gallons 180 289113 10295 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period !. current waste analysis dated m. ((lines e + k)/1000) x line l = 12/16/2020 REPEAT SECTION l FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 289113 fC 189943 153201 ft3 788214 gallons 1.44 Ibs/1000 gal. 2690.9 lbs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2004 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b_ designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e_ line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g_ volume of waste produced according to structural design h. current herd # 0 certified herd # 29.0 29.0 inches inches 0.0 inches 30625 ft2 764 gallons 180 18792 2603 days ft3 actual waste produced = current herd # x line g = ft' certified herd # I. volume of wash water according to structural design j_ excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 12/16/2020 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 12528 17865 ft3 ft3 37890 gallons 0.12 Ibs/1000 gal. 4.6 lbs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 3088 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/if' 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g_ volume of waste produced according to structural design h. current herd # 7344 certified herd # 20.0 27.6 inches inches 7.6 inches 266415 ft2 1262097 gallons 180 247418 7344 actual waste produced = current herd # x line g = certified herd # i_ volume of wash water according to structural design j. excess rainfall over evaporation according to design k_ (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 12/16/2020 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 247418 fe 159055 155409 ft3 ft3 700480 gallons 1.68] Ibs/1000 gal. 3297.1 Ibs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 3090 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallonse 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h_ current herd # 7344 certified herd # 22.0 31.4 inches inches 9.4 inches 264457 ft2 1549542 gallons 180 247418 7344 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 12/16/2020 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 247418 ft6 159055 154267 ft3 ft3 699056 gallons 1.38 lbs/1000 gal. 3103.1 lbs. PAN PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 3096 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft-3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 3672 certified herd # 22.0 30.7 inches inches 8.7 inches 149702 ft2 813700 gallons 180 123709 3672 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 12/16/2020 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 123709 ft' 79527 87326 ft3 ft3 362234 gallons 1.61 Ibs/1000 gal. 1893.3 lbs. PAN PoA (30 Day) 2/21 /00