HomeMy WebLinkAbout260063_30 Day POA_20210208PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 26-63 County: Cumberland Facility Name: Rodney Hall Farm Certified Operator Name: Rodney Hall Operator Number: 19321 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 1 2 Spillway(Y or N): N N Level(inches): 17 27 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 2/10/2021 Weather permiting. I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Rodney Hall Phone: 910-531-4320 Facility Owner/Manager (print) Facility Owner/Manager (signature) Date: 2/8/2021 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: 1 2 n. lines 1 + 2 + 3 + 4 + 5 + 6 = line m = 57.1 Ib PAN line m = 134.1 Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN 191.3 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR- 2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 4063 1 SG 3.27 30.00 98.1 OCT-MAR 4063 2 SG 3.25 50.00 162.5 OCT-MAR v. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = x. Crop's remaining PAN balance (line v from section III) = y. Overall PAN balance (w - x) = 260.6 Ib. PAN 191.3 Ib. PAN 260.6 Ib. PAN -69.3 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE. Self reported to DWR on 2/5/21. 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ top of dike surface area according to design d. (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 6080 certified herd # 17.0 19.0 inches inches 2.0 inches 26136 ft2 32583 gallons 180 22272 6080 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 1/25/2021 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 22272 ft3 0 15246 ft3 ft3 46772 gallons 0.72 Ibs/1000 gal. 57 Ibs. PAN 1. AVERAGE LIVE WEIGHT (ALW) 0 sows (farrow to finish) x 1417 = 0 0 sows (farrow to feeder) x 522 = 0 0 head (finishing only) x 135 = 0 0 sows (farrow to wean) x 433 = 0 0 head (wean to feeder) x 30 = 0 Describe other : Total Average Live Weight = 0 Volume of waste produced: 0 lbs ALW/135 x 1.37 gal/day 180 days 0 gal or 0 cu. ft 180 days excess rainfall = 7.0 inches Volume = 7.0 inches * DA/12 inches per foot Volume = 15246 cu ft lbs lbs lbs lbs lbs lbs PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft' 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 3040 certified herd # 27.0 29.0 2.0 33176 41359 180 22271.7 3040 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 1/25/2021 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 22272 0 24250 57997 1.35 134.1 PoA (30 Day) 2/21/00 inches inches inches ft2 gallons days ft3 ft' ft3 ft3 gallons Ibs/1000 gal. Ibs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft' 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # certified herd # actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 PoA (30 Day) 2/21/00 inches inches inches ft2 gallons days ft3 ft' ft3 ft3 gallons Ibs/1000 gal. Ibs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft' 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # certified herd # actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 PoA (30 Day) 2/21/00 inches inches inches ft2 gallons days ft3 ft' ft3 ft3 gallons Ibs/1000 gal. Ibs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft' 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # certified herd # actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 PoA (30 Day) 2/21/00 inches inches inches ft2 gallons days ft3 ft' ft3 ft3 gallons Ibs/1000 gal. Ibs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft' 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # certified herd # actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 PoA (30 Day) 2/21/00 inches inches inches ft2 gallons days ft3 ft' ft3 ft3 gallons Ibs/1000 gal. Ibs. PAN PoA (30 Day) 2/21/00