Loading...
HomeMy WebLinkAbout20090451 Ver 1_Inspection_20120627�� ©� NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild Dee Freeman Governor Director Secretary June 27 2012 Mr J B Setzer P E Division 14 Engineer N C Department of Transportation 253 Webster Road Sylva North Carolina 28779 Subject Inspection NC Highway 28 DWQ Project 09 0451 TIP No R 2408B Macon County Dear Mr Setzer On June 21 2012 I inspected the construction work on NC Highway 28 in Macon County Construction continues along most of the project with gradmg culvert and pipe installation underway Please ensure that all sediment and erosion control structures are maintained and that seeding and mulching are performed as needed to protect downstream waters A copy of the inspection report is attached to this letter If you have questions please call me at 828 296 4500 Sincerely Michael R Parker Environmental Senior Specialist Attachment cc W Trent Anderson Mark Davis Division 14 DEO Ed Ingle Roadside Environmental Transportation Permitting Unit Mike Parker Asheville Regional Office (Setzer) NC Highway 28 Inspection Letter June 2012 SURFACE WATER PROTECTION SECTION — Asheville Regional Office 2090 U S 70 Highway Swannanoa NC 28778 8211 Phone 828 296-45001 FAX 828 299 7043 Internet www ncwatermuallty org An Equal Opportunity Affirmative Action Employer One NorthCarolina Naturallrl Wetland Inspection report Project Num 20090451 Version 1 Project Name NCDOT NC 28 on SR 1323 (R 2408) County Macon Location NCDOT NC 28 on SR 1323 (R 2408) Latitude +35 1326 SW Plan Location Site Owner Name NC DOT PDEA Inspection Date 06/21/2012 Reason for Inspection Routine Inspection Type Site Inspection (DOT) Inspection Contact Person Title On Site Representative(s) Primary Inspector Michael R Parker Secondary Inspector(s) Status Issued Project Type Road /Highway Widening Region Central Longitude 83 2354 Facility compliance Status E Compliant n Not Compliant Program Area 401 (includes isolated /non -404) Phone Phone 828 296 4500 Question Areas 0 Permit (401 WQC) Inspection Summary Reviewed project with DOT staff Culvert over Rocky Branch nearly complete Construction is underway from airport road to beginning of project Sediment and erosion conrol structures appear to be working properly Seed and mulch areas as required Permit (401 WQC) Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and /or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment ■nnn ■nnn ■nnn Page 1