HomeMy WebLinkAbout830022_30 Day POA_20210216PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 83-22 County: Scotland
Facility Name: Farm 76881 (formerly 7705)
Certified Operator Name: Eric Ferrell
Operator Number: 17634
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: 7705
Spillway(Y or N): N
Level(inches): 19
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: As soon as conditions permit
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Murphy Brown, LLC
Facility Owner/Manager (print)
Phone: 910-293-3434
Date: 2/16/2021
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: was 7705) 76881 Lagoon line m = 1035.4 Ib PAN
2. Structure ID: line m = Ib PAN
3. Structure ID: line m = Ib PAN
4. Structure ID: line m = Ib PAN
5. Structure ID: line m = Ib PAN
6. Structure ID: line m = Ib PAN
n. lines 1 + 2 + 3 + 4 + 5 + 6 =
1035.4 Ib PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR-
2 PAN balance
(Ib/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
76881
3
Small Grain
3.22
48.35
155.7
Sept -April
76881
1
Small Grain
2.44
50.00
122.0
Sept -April
76881
2
Small Grain
2.72
50.00
136.0
Sept -April
76881
4
Small Grain
4.19
50.00
209.5
Sept -April
76881
5
Small Grain
4.53
50.00
226.5
Sept -April
76881
7
Small Grain
3.28
50.00
164.0
Sept -April
76881
8
Small Grain
2.62
50.00
131.0
Sept -April
76881
9
Small Grain
2.21
50.00
110.5
Sept -April
State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) =
IV. FACILITY'S PoA OVERALL PAN BALANCE
1255.2 Ib. PAN
w. Total PAN to be land applied (line n from section II) = 1035.4 Ib. PAN
PoA (30 Day) 2/21/00
x. Crop's remaining PAN balance (line v from section III) =
y. Overall PAN balance (w - x) =
1255.2 Ib. PAN
-220 Ib. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is
available for pumping if needed.
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
(was 7705) 76881 Lagoon
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. current herd #
2400
certified herd #
19.0
19.3
inches
inches
0.3 inches
201000
ft2
40093 gallons
180
253780
2400
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated
m. ((lines e + k)/1000) x line I =
2/3/2021
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
days
ft3
253780 ft3
0
117250
ft3
ft3
462551 gallons
2.06
Ibs/1000 gal.
1035.4 Ibs. PAN
PoA (30 Day) 2/21/00