HomeMy WebLinkAbout820537_30 Day POA_20210217PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 82
537
County: SAMPSON
Facility Name: POPE'S PIG PALACE
Certified Operator Name: KEVIN POPE Operator # 19105
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (ID): POPE
Spillway (Yes or No):
Level (inches):
2 Check all applicable items
NO
18.5
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
XX_ Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact •and• secure approval from •the Division of Water Resources prior to transfer of
waste to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: FEBRUARY 24TH
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
Phone:
Facility Owner/Man
er (print)
Date:
Facility Owner/Manager (signature)
PoA Cover Page 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID)u POPE
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e line c x line d x 7.48 gallons =
12 ft3
18.5
19
0.5
inches
inches
inches
300, 583 ft2
93,682_ gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 90 days
g. volume of waste produced according to structural design 31,712 _ ft3
h. actual waste produced = current herd # x line g = 0
certified herd #
i. volume of wash water according to structural design
j excess rainfall over evaporation according to design
k. (lines h + i +i) x 7.48 x 30 days =
line f
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 2-8-21 1.34 lb/1000 gal.
ft3
0 ft3
24610 ft3
61,361 gallons
m. (lines e + k) x line I = 207.76_ lb PAN
1000
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
PoA (30 Day) 2/21/00 1
1. structure ID• POPE
2. structure ID
3. structure IDs
4. structure ID•
5. structure IDs
6. structure ID•
n. lines 1 + 2 + 3 + 4 + 5 + 6
PAN
line m = 207.76 Ib PAN
line m = Ib PAN
line m = Ib PAN
line m = Ib PAN
line m = Ib PAN
line m = Ib PAN
207.76 lb
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIES DURING THIS 30 DAY PERIOD.
o.
tract
#
field
#
q.
crop
u
application
t. TOTAL
PAN
r. acres
s.
remaining
p.
BALANCE
IRR-2
PAN
window'
balance
FOR
(Ibs.)
column
FIELD
r x s
(Ib/acre)
11328
5
1.1
50
55.00
Rye
OS
OCT
-
MAR
11328
1AA
206.25
185.63
BERMUDA
MAR-SEP
.9
11328
1A
1.08
206.25
222.75
MAR-SEP
BERMUDA
11328
2A
206.25
134.06
BERMUDA
MAR-SEP
.65
11328
3
536.25
2.20
243.75
MAR-SEP
BERMUDA
11328
4A
1.10
206.25
226.875
BERMUDA
MAR-SEP
11328
2.60
243.75
633.75
4B
BERMUDA
MAR-SEP
11328
5
1.1
206.25
226.875
BERMUDA
MAR-SEP
State current crop ending application date or next crop application beginning date for available receiving
crops .during 30 day drawn down period
v. Total PAN available for all fields (sum of column t) _
2221.19 lb. PAN
PoA (30 Day) 2/21 /00
2
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) _
x. Crop's remaining PAN balance (line v from section III) _
y. Overall PAN balance (w - x)
207.76
2221.19
-2013.43
Ib. PAN
Ib. PAN
lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here
including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd
reduction options, recalculate new PAN based on new information. If new fields are to be
included as an option for lowering lagoon level, add these fields to the PAN balance table and
recalculate the overall PAN balance. If animal waste is to be hauled to another permitted
facility provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
Currently, there are no animals on the farm. Animals will return first week of March. We only
have 1 field that has any remaining PAN for the overseeded rye crop Our Bermuda season
begins March 1st. If we can get a weather widow and some dry, sunny days, we should be
able to get back to 19"+ before March 1st but with the pending weather forecast as of this
report (2-17-21) that may not be achievable. Fields are extremely saturated at this time.