Loading...
HomeMy WebLinkAbout820537_30 Day POA_20210217PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82 537 County: SAMPSON Facility Name: POPE'S PIG PALACE Certified Operator Name: KEVIN POPE Operator # 19105 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): POPE Spillway (Yes or No): Level (inches): 2 Check all applicable items NO 18.5 Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. XX_ Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact •and• secure approval from •the Division of Water Resources prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: FEBRUARY 24TH I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Phone: Facility Owner/Man er (print) Date: Facility Owner/Manager (signature) PoA Cover Page 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID)u POPE 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e line c x line d x 7.48 gallons = 12 ft3 18.5 19 0.5 inches inches inches 300, 583 ft2 93,682_ gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 90 days g. volume of waste produced according to structural design 31,712 _ ft3 h. actual waste produced = current herd # x line g = 0 certified herd # i. volume of wash water according to structural design j excess rainfall over evaporation according to design k. (lines h + i +i) x 7.48 x 30 days = line f 4. Total PAN to be land applied during draw down period I. current waste analysis dated 2-8-21 1.34 lb/1000 gal. ft3 0 ft3 24610 ft3 61,361 gallons m. (lines e + k) x line I = 207.76_ lb PAN 1000 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA (30 Day) 2/21/00 1 1. structure ID• POPE 2. structure ID 3. structure IDs 4. structure ID• 5. structure IDs 6. structure ID• n. lines 1 + 2 + 3 + 4 + 5 + 6 PAN line m = 207.76 Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN 207.76 lb III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIES DURING THIS 30 DAY PERIOD. o. tract # field # q. crop u application t. TOTAL PAN r. acres s. remaining p. BALANCE IRR-2 PAN window' balance FOR (Ibs.) column FIELD r x s (Ib/acre) 11328 5 1.1 50 55.00 Rye OS OCT - MAR 11328 1AA 206.25 185.63 BERMUDA MAR-SEP .9 11328 1A 1.08 206.25 222.75 MAR-SEP BERMUDA 11328 2A 206.25 134.06 BERMUDA MAR-SEP .65 11328 3 536.25 2.20 243.75 MAR-SEP BERMUDA 11328 4A 1.10 206.25 226.875 BERMUDA MAR-SEP 11328 2.60 243.75 633.75 4B BERMUDA MAR-SEP 11328 5 1.1 206.25 226.875 BERMUDA MAR-SEP State current crop ending application date or next crop application beginning date for available receiving crops .during 30 day drawn down period v. Total PAN available for all fields (sum of column t) _ 2221.19 lb. PAN PoA (30 Day) 2/21 /00 2 IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) _ x. Crop's remaining PAN balance (line v from section III) _ y. Overall PAN balance (w - x) 207.76 2221.19 -2013.43 Ib. PAN Ib. PAN lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Currently, there are no animals on the farm. Animals will return first week of March. We only have 1 field that has any remaining PAN for the overseeded rye crop Our Bermuda season begins March 1st. If we can get a weather widow and some dry, sunny days, we should be able to get back to 19"+ before March 1st but with the pending weather forecast as of this report (2-17-21) that may not be achievable. Fields are extremely saturated at this time. PoA (30 Day) 2/21/00 3