HomeMy WebLinkAbout090048_30 Day POA_20210216PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 09-048 County: Bladen Facility Name: Lisbon Certified Operator Name: Tonya Branson Operator Number: 1007345 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lisbon 1 no 9 2. Check all applicable items XXXX Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. 2/8/2021 Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 2/22/2021 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. MR Whaley AJ Linton Tech Spec. Facility Owner/Manager (print) Facility Owner/Manager (signature) Phone: 910-290-1042 Date: 2/16/2021 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2. Current liquid volume in structural freeboard a. current liquid level according to marker Lisbon 1 b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 3400 certified herd # 9.0 12.0 inches inches 3.0 inches 269561 ft2 504079 gallons 180 395420 3400 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = days ft3 395420 ft3 0 157244 ft3 ft3 114831 gallons 618910 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2. Current liquid volume in structural freeboard a. current liquid level according to marker inches b. designed structural freeboard zone inches (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) = inches d. top of dike surface area according to design (area at below structural freeboard elevation) ft2 e. line c/12 x line d x 7.48 gallons/ft3 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design days g. volume of waste produced according to structural design ft3 h. current herd # certified herd # actual waste produced = current herd # x line g = ft3 certified herd # i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design ft3 k. (lines h + i + j) x 7.48 x 5 days/line f = gallons 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = 0 0 0 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2. Current liquid volume in structural freeboard a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # certified herd # actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = inches inches inches ft2 gallons days ft3 ft3 ft3 ft3 gallons 0 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2. Current liquid volume in structural freeboard a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # certified herd # actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = inches inches inches ft2 gallons days ft3 ft3 ft3 ft3 gallons 0 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2. Current liquid volume in structural freeboard a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # certified herd # actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = inches inches inches ft2 gallons days ft3 ft3 ft3 ft3 gallons 0 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2. Current liquid volume in structural freeboard a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # certified herd # actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = inches inches inches ft2 gallons days ft3 ft3 ft3 ft3 gallons 0 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00 II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: 2. structure ID: 3. structure ID: 4. structure ID: 5. structure ID: 6. structure ID: Lisbon 1 line I = 618910 gallons line I = line I = line I = line I = line I = **Pump and haul** gallons 678850 n. lines 1 +2+3+4+5+6= o. line n / 27154 = gallons gallons gallons gallons gallons -59940 gallons -2 acre -inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD" While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. tract # q. field # r. soil type s. crop t. acres u. remaining IRR-2 PAN balance (lb/acre) v. maximum application rate (in/hr) w. maximum application amount (inches) P1 Exa Corn 25.00 0.4 1 4-6 GH Corn 15.00 0.4 1 7-8 Exa Corn 11.00 0.4 1 9-10 Exa Corn 10.00 0.4 1 11-12 Exa Corn 16.00 0.4 1 13-14 Dua Wheat 7.00 0.4 1 15-16 NoB Wheat 7.00 0.4 1 x. total acres available during 5 day draw down (sum of column t) = 91.00 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE PoA (5 Day) 2/21/00 y. line o = line x -0 inches per acre to be applied within 5 days If unable to land apply hydraulic load listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new hydraulic load based on new information. We plan to begin land application as soon as the weather clears but no later than 2/22/20. Plan to land apply hydraulic load: 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation equipment mar down in field; "trafficability" across soils; will soils absorb application without runoff, etc.) The fields remain wet and equipment cannot stand in the field. The farm is planning on hauling 678,850 gallons of water to an off site lagoon. Transfer records will be completed when this occurs. 2. Date and amount of last rainfall event? DATE: 3. Dates of last waste application event per field: 02/15/21 AMOUNT: 2.00 inches P 15-16 11/4/20 4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in line "n" at appropriate seasonal (i.e. winter) application rates within 5 days? Yes the farm has the available equipment to apply the water. 5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and amounts per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to meet proposed changes in application rates and amounts; and any other information for consideration. The farm will apply the required water at or below the .4 acre inch/hour. We plan to begin application as soon as the weather clears and the fileds can hold water. PoA (5 Day) 2/21/00 PoA (5 Day) 2/21/00 PoA (5 Day) 2/21/00