Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
820242_30 Day POA_20210219
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility plumber: 8 2_ - a ra County: Sal'ri V . •acility Name: €.r= r e.V4 l liuctAke a ar r / ri i e_ INA 5 Certified Operator Name: 5 A ey 'Q. q t\d Operator # '\ 5 Zi 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Hucl�le.berry htve 1-I��1 P6tn�s Lagoon Name/Identifier (ID): D Spillway (Yes or No): Level (inches): 2. Check all applicable items 15 Liquid level is within the -designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section 111 tables. included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 2- 24 Z021 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. �. Sjche.� Q\etr�c Phone: c\ 0- `e5- 622 Fa ility Owner/[tttlanager (print) Fa Owner/lMManager (signature) Date: 2 V - 20 21 PoA Cover Page 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Deer ie.0 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 1 inches b. designed 25 yr./24 hr. storm & structural freeboard inches c. line b - line a (inches in red zone) = 1'' inches d. top of dike surface area according to design 2.'* (X© ft2 (area at below structural freeboard elevation) e. line c x line d x 7.48 gallons = 5c1 S gallons 12 ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design eo days g. volume of waste produced according to structural design 1910E ft3 h. actual waste produced = current herd # x line g = j Cc#B ft3 certified herd # ' i. volume of wash water according to structural design j. excess rainfall over evaporation according to design 1 CO L ft3 k. (lines h + i ±1) x 7.48 x 30 days = line f 4. Total PAN to be land applied during draw down period 1. current waste analysis dated 2.- 2- 2621 m. (lines e + k) x line I = 1000 ft3 41.) 200 gallons 2e5 lb/1000 gal. lb PAN ?EPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE tI. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1 Structure Name/Identifier (ID): Vk vc \eAaerrt µ k‘ 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 16 inches b. designed 25 yr./24 hr. storm & structural freeboard ir'‘ inches c. line b - line a (inches in red zone) = S inches d. top of dike surface area according to design OGC (area at below structural freeboard elevation) e. line c x line d x 7.48 gallons = '-}�F3� 0 gallons 12 ft2 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 1 BC days g. volume of waste produced according to structural design I IJO 4B ft3 h. actual waste produced = current herd # x line g = 19.)Oure ft3 certified herd # i. volume of wash water according to structural design Ci ft3 j. excess rainfall over evaporation according to design \it 000 ft3 k. (lines h + i +i) x 7.48 x 30 days - 14l12.60 gallons line f 4. Total PAN to be land applied during draw down period 1. current waste analysis dated 2 2- 2.©Zl 3. I b lb/1000 gal. m. (lines e + k) x line I = 1000 2.0 lb PAN 2EPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): F i v 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker j b inches b. designed 25 yr./24 hr. storm & structural freeboard inches c. line b - line a (inches in red zone) = 3 inches d. top of dike surface area according to design 2 3 15 ft2 (area at below structural freeboard elevation) e. line c x line d x 7.48 gallons = 41-\- E533 gallons 12 ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design (eL days g. volume of waste produced according to structural design iq., a46 ft3 h. actual waste produced = current herd # x line g = V\ Olie ft3 certified herd # i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design l C CC ft3 k. (lines h + i +i) x 7.48 x 30 days = IAA 52.00 gallons line f 4. Total PAN to be land applied during draw down period 1. current waste analysis dated Z- 2- 2e�.\ Z (j tb11000 gal. m. (lines e + k) x line I = lb PAN 1000 ?EPEAT SECTION l FOR EACH WASTE STRUCTURE ON SITE a. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA (30 Day) 2/21 /00 . structure ID: D eac 2. structure lD: H .kN;0 3. structure ID: F hk . Pc� �� 5 4_ structure ID; 5. structure ID: 6. structure ID: n. lines' + 2 + 3 + 4 + 5 + 6 = line m = '261 lb PAN line m = 2&1 IbPAN line m = VT7 lb PAN linem= IbPAN line m= IbPAN line m = lb PAN '16 5 lb PAN 111. TOTAL. PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIES DURING o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (lb/acre) THIS 30 t. TOTAL PAN BALANCE FOR Fsl•L D (Ibs.) column_, DAY ramiuu. u. application window' CI \N\\ea\ 2.G2. S 11 u 1 ai - seo- IN, . C C z vlhecck 2,/‘ ?Z, 61 2.60. a1 C C.3 W heq\ 2;1E (c4. 52- C C 1 v4 he k 2= 82_ 145, 50 \ 2.B:3 ‘ Y a 1/4 heed 7` 39, 23 t v a ,=� Y C 3 1r�1 h�:.1 2. �� 13..55 . 35.64 7 71 VI heL 2. 4-1 -to.,s7 il..S. OE H H 1 - Celer Crop 2,el 6 3O.c :- SS. SO ' 't-1a Cover 0-9, 3,25 4.0(1 t3.2_9 a a 1 Cbuei_ Cnri 2.,E 12.©i3 `2S.'3B S S. 2. Cover Cr 2. SS 2O-1 SI.4 i 1 1. 3 Coger Crof 1, 82 14, 69 25, O,A- a a 4 Circe, CIE ta 1,S2. at.-13 3 t.55 3 3. 5 C^v er CrGp `e S2- 21, 73 v 15.5 1f 1State Current C(O d I° p en ing app cation date or next crop application beginning date for available receiving crops - during 30 day drawn down period v. Total PAN available for all fields (sum of column t) = I 'Z.1(. f 1b. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE PoA (30 Day) 2/21/00 w. Total PAN to be land applied (line n from section II) = '70 5 Ib. PAN x. Crop's remaining PAN balance (line v from section III) _ t 216 Ib. PAN y. Overall PAN balance (w - x) = - 7 t k Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Ih d ; i c:›v. A' he c v c,aY er e, ro fl IN oUti Cc lA fvI RoA (30 Day) 2/21100