Loading...
HomeMy WebLinkAbout820709_30 Day POA_20210219PLAN OFACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82-709 County: Sampson Facility Name: H & C Farm Jart Hudson Certified Operator Name: Richard Clifton Operator Number: 18368 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 1 Spillway(Y or N): N Level(inches): 17 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached, Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates for depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 2/20/21 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Richard Clifton Phone: 9109900263 Facility Owner/Manager (print) Richard Clifton Facility Owner/Manager (signature) Date: 2/19/21 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1, Structure ID: 2. Structure ID: 3. Structure ID: 4, Structure ID: 5. Structure ID: 6. Structure ID: Lagoon #1 n. lines 1 + 2 + 3 + 4 + 5 + 6 = line m = 749.9 Ib PAN line m = Ib PAN Tine m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN 749.9 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. O. tract # p field # q. crop r acres s. remaining IRR-2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. applicationwindow' 5 P8 sg 5.30 15.77 83.6 10/1-3/31 5 P9 sg 5,32 16.05 85.4 10/1-3/31 5 P10 sg 6.37 9.38 59.8 10/1-3/31 6 P11 sg 5.37 8.92 47.9 10/1-3/31 6 P12 sg 4.19 8.82 37.0 10/1-3/31 9 P18 sg 1.66 8.53 14.2 10/1-3/31 14 P27 sq 3.52 9.19 32.3 10/1-3/31 14 P28 sg 3.22 7.91 25.5 10/1-3/31 14 P29 sq 3.38 8.87 30.0 10/1-3/31 14 P30 sq 3.72 15.80 58.8 10/1-3/31 15 P31 sg 3.59 16.51 59.3 10/1-3/31 15 P34 sg 4.33 22.79 98.7 10/1-3/31 17 P37 sg 2.59 22.70 58.8 10/1-3/31 17 P38 sg 3.58 22.73 81.4 10/1-3/31 17 P39 sg 3.54 22.64 80.1 10/1-3/31 17 P40 sg 4.21 22.76 95.8 10/1-3/31 17 P41 sq 4.14 22.72 94.1 10/1-3/31 17 P42 sq 3.97 22.68 90.0 10/1-3/31 17 P43 sg 3.36 22 62 76.0 10/1-3/31 lState curren crop ending application date or next c op application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = x. Crop's remaining PAN balance (line v from section III) = y. Overall PAN balance (w -x) = 1208.5 Ib. PAN 749.9 Ib. PAN 1208.5 Ib. PAN -459 Ib. PAN Line y must show as a deficit. If line y does not showas a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN basedon new information. If newfields are to be included as an option forlowering lagoon level, add thesefields to the PAN balance PoA (30 Day) 2/21/00 table and recalculate the overall VAN balance. It animal waste is to De hauled to another permittedtacolty, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Irrigation onto existing spray fields will continue as weather and field conditions permit. PoA (30 Day)2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Lagoon #1 2. Current liquid volume in 25 yr./24 hr. storm sto age & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard &ovation) e, line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 6140 certified herd # 17.0 19.0 inches inches 2.0 inches 171000 ft2 213180 gallons 180 232658 7040 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design J. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 2/8/21 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 202915 ft3 0 99750 ft3 ft3 377322 gallons 1.271 Ibs/1000 gal. 749.9 Ibs. PAN PoA (30 Day) 2/21/00