HomeMy WebLinkAbout820709_30 Day POA_20210219PLAN OFACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 82-709 County: Sampson
Facility Name: H & C Farm Jart Hudson
Certified Operator Name: Richard Clifton
Operator Number: 18368
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: 1
Spillway(Y or N): N
Level(inches): 17
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached, Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates for depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 2/20/21
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Richard Clifton Phone: 9109900263
Facility Owner/Manager (print)
Richard Clifton
Facility Owner/Manager (signature)
Date: 2/19/21
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1, Structure ID:
2. Structure ID:
3. Structure ID:
4, Structure ID:
5. Structure ID:
6. Structure ID:
Lagoon #1
n. lines 1 + 2 + 3 + 4 + 5 + 6 =
line m = 749.9 Ib PAN
line m = Ib PAN
Tine m = Ib PAN
line m = Ib PAN
line m = Ib PAN
line m = Ib PAN
749.9 Ib PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
O. tract #
p field #
q. crop
r acres
s. remaining IRR-2
PAN balance
(Ib/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. applicationwindow'
5
P8
sg
5.30
15.77
83.6
10/1-3/31
5
P9
sg
5,32
16.05
85.4
10/1-3/31
5
P10
sg
6.37
9.38
59.8
10/1-3/31
6
P11
sg
5.37
8.92
47.9
10/1-3/31
6
P12
sg
4.19
8.82
37.0
10/1-3/31
9
P18
sg
1.66
8.53
14.2
10/1-3/31
14
P27
sq
3.52
9.19
32.3
10/1-3/31
14
P28
sg
3.22
7.91
25.5
10/1-3/31
14
P29
sq
3.38
8.87
30.0
10/1-3/31
14
P30
sq
3.72
15.80
58.8
10/1-3/31
15
P31
sg
3.59
16.51
59.3
10/1-3/31
15
P34
sg
4.33
22.79
98.7
10/1-3/31
17
P37
sg
2.59
22.70
58.8
10/1-3/31
17
P38
sg
3.58
22.73
81.4
10/1-3/31
17
P39
sg
3.54
22.64
80.1
10/1-3/31
17
P40
sg
4.21
22.76
95.8
10/1-3/31
17
P41
sq
4.14
22.72
94.1
10/1-3/31
17
P42
sq
3.97
22.68
90.0
10/1-3/31
17
P43
sg
3.36
22 62
76.0
10/1-3/31
lState curren crop ending application date or next c op application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) =
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) =
x. Crop's remaining PAN balance (line v from section III) =
y. Overall PAN balance (w -x) =
1208.5 Ib. PAN
749.9 Ib. PAN
1208.5 Ib. PAN
-459 Ib. PAN
Line y must show as a deficit. If line y does not showas a deficit, list course of action here including pump and haul,
depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN basedon new
information. If newfields are to be included as an option forlowering lagoon level, add thesefields to the PAN balance
PoA (30 Day) 2/21/00
table and recalculate the overall VAN balance. It animal waste is to De hauled to another permittedtacolty, provide
information regarding the herd population and lagoon freeboard levels at the receiving facility.
NARRATIVE:
Irrigation onto existing spray fields will continue as weather and field conditions permit.
PoA (30 Day)2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
Lagoon #1
2. Current liquid volume in 25 yr./24 hr. storm sto age & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard &ovation)
e, line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. current herd # 6140 certified herd #
17.0
19.0
inches
inches
2.0 inches
171000
ft2
213180 gallons
180
232658
7040
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
J. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated
m. ((lines e + k)/1000) x line I =
2/8/21
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
days
ft3
202915 ft3
0
99750
ft3
ft3
377322 gallons
1.271
Ibs/1000 gal.
749.9 Ibs. PAN