Loading...
HomeMy WebLinkAbout20110060 Ver 1_Inspection_20120627NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild P E Dee Freeman Governor Director Secretary June 27 2012 Mr J J Swain Jr P E Division 13 Engineer N C Department of Transportation Post Office Box 3279 Asheville North Carolina 28802 Subject Inspection DWQ Project 11 0060 TIP No B 4183 NCSR 1526 Crooked Creek Road Madison County Dear Mr Swain On June 25 2012 I inspected the construction work on TIP Project No B 4183 NCSR 1526 Crooked Creek Road in Madison County Construction has been completed on the first culvert and work has started on the other culvert Sediment and erosion control measures appear to be working properly Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are performed as required to protect State surface waters Also please refer to the attached inspection report for any specific items noted during the inspection If you have questions please call me at 828 296 4500 Sincerely Michael R Parker Environmental Senior Specialist Attachment cc Randy McKinney PE Roger Bryan Division 13 DEO Ed Ingle Roadside Environmental Transportation Permitting Unit Mike Parker Asheville Regional Office B 4183 NCSR 1526 June 2012 Inspection Letter SURFACE WATER PROTECTION SECTION — Asheville Regional Office 2090 U S 70 Highway Swannanoa NC 28778 8211 Phone 828 29645001 FAX 828 299 7043 One Internet www ncwaterauallty org NorthCarollna An Equal Opportunity Affirmative Action Employer Naturally Wetland Inspection Report Project Num 20110060 Version 1 Status Issued Project Name NCDOT Bridge No 28 and 29 on SR 1526 (B 4183) Project Type Replace bridge with bridge County Madison Region Asheville Location NCDOT Bridge No 28 and 29 on SR 1526 (B 4183) Latitude +35 51 00 Longitude 82 28 48 SW Plan Location Site Owner Name NC DOT PDEA Inspection Date 06/25/2012 Reason for Inspection Routine Inspection Type Site Inspection (DOT) Inspection Contact Person On Site Representative(s) Primary Inspector Michael R Parker Secondary Inspector(s) Facility compliance Status E Compliant Program Area 401 (includes isolated /non 404) Question Areas 0 Permit (401 WQC) Title n Not Compliant Phone Phone 828 296 4500 Inspection Summary Reviewed project with DOT inspector The first culvert (Crooked Creek) has been completed and the stream relocated in the new channel Work has started on the second culvert at Middle Fork Creek Sediment and erosion control measures appear to be working properly Permit (401 WQC) Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and /or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment ■nnn ■nnn ■nnn Page 1 Beverly Eaves Perdue Governor rvA NCDENR North Carolina Department of Environment and Natura ' ` Division of Water Quality Charles Wakild, P.E. Director Mr. J. J. Swain, Jr., P.E. Division 13 Engineer N.C. Department of Transportation Post Office Box 3279 Asheville, North Carolina 28802 Dear Mr. Swain: October 16, 2012 oct aces /Z y00g14�p ''00 ?4'4R? Dee Freeman bcti Secretary ~ 0060 Mcia1 !'.I Subject: Inspection TIP No. B-4183 Bridge Nos. 28 and 29 NCSR 1526 Crooked Creek Road Madison County On October 10, 2012, I inspected the construction work on TIP Project No. B-4183, on NCSR 1526 (Crooked Creek Road), in Madison County. The inspection included a review of the construction and compliance with the 401 Water Quality Certification. Please ensure that all sediment and erosion control structures are maintained until grass is well established at the site. Also, please refer to the attached inspection report for any specific items noted during the inspection. If you have questions, please call me at 828-296-4500. Sincerely, 71,Cehd-v Michael R. Parker Environmental Senior Specialist Attachment cc: Randy McKinney, P.E. Roger Bryan, Division 13, DEO Ed Ingle, Roadside Environmental Transportation Permitting Unit Mike Parker, Asheville Regional Office B-4183 NCSR 1526 October 2012 Inspection Letter SURFACE WATER PROTECTION SECTION —Asheville Regional Office 2090 U.S. 70 Highway, Swannanoa, NC 28778-8211 Phone: 828-296-45001 FAX : 828-299-7043 Internet www.ncwaterquality.orq NortthCarolina Naturally An Equal Opportunity \ Affirmative Action Employer Wetland Inspection Report Project Num: 20110060 Project Name: County: Location: Latitude: NCDOT- Bridge No. Madison NCDOT- Bridge No. +35°51'00" SW Plan Location: Site Owner Name: NC DOT PDEA Inspection Date: 10/10/2012 Reason for Inspection: Routine Inspection Type: Site Inspection (DOT) Version: 1 28 and 29 on SR 1526 (B-4183) 28 and 29 on SR 1526 (B-4183) Status: Project Type: Region: Issued Replace bridge with bridge Asheville Longitude:-82°28'48" Inspection Contact Person: Title: Phone: On -Site Representative(s): Primary Inspector: Michael R Parker Secondary Inspector(s): Facility compliance Status: Compliant n Not Compliant Program Area: 401 (includes isolated/non-404) Phone: 828-296-4500 Question Areas: Permit (401 WQC) Inspection Summary: Inspected site with NCDOT inspector. Work on the project had been completed except for final seeding and mulching, guard rail and final paving. Seeding was to be completed on the day of inspection. " Continue to maintain sediment and erosion control devices until grass has been well established. Permit (401 WQC) Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: Yes No NA NE ■ nnn ■ nnn ■ nnn Page: 1