HomeMy WebLinkAbout20020991 Ver 1_Year 3 Monitoring Report_20110310h AP irk Monitoring Firm A, I` i oEQUINOX.� ENVIRONMENTAL CONSULTATION & DESIGN 37 Haywood Street, Suite 100 Asheville, North Carolina 28801 828 253 6856 Protect Contact Win Taylor Email win @ equinoxenvironmental com 10 20 30 Kings Creek Stream Restoration 2011 Monitoring Report (MY 3) Table of Contents Executive Summary / Project Abstract Methodology References Page 1 Page 2 Page 3 Appendices it � J Appendix A Project Vicinity Map and Background Tables Figure 1 Vicinity Map and Directions Table la Project Components Table lb Component Summations Table 2 Project Activity and Reporting History Table 3 Project Contacts f Table 4 Project Attributes �I Appendix B Visual Assessment Data Figure 2 Integrated Current Condition Plan View Table 5 Visual Stream Morphology Stability Assessment r i Table 6 Vegetation Condition Assessment F] r L� I �I I� L Appendix C Vegetation Plot Data Table 7 Vegetation Plot Criteria Attainment Vegetation Monitoring Plot Photos Table 8 CVS Vegetation Plot Metadata Table 9 Planted and Total Stem Counts (Species by Plot with Annual Means) Appendix D Stream Survey Data Cross Sections with Annual Overlays Longitudinal Profiles with Annual Overlays Pebble Count Plots with Annual Overlays Table 10a Baseline Stream Data Summary Table IOb Baseline Stream Data Summary (Substrate Bed Bank and Hydrologic Containment Parameter Distributions) Table l la Monitoring Data — Dimensional Morphology Summary (Dimensional Parameters — Cross Sections) Table l lb Monitoring Data — Stream Reach Data Summary Appendix E Hydrologic Data Table 12 Verification of Bankfull Events m r 10 EXECUTIVE SUMMARY / PROJECT ABSTRACT r U The goals and objectives stated in the Kings Creek Mitigation Report (NCEEP 2006) are as follows U I • Restore 2 119 linear feet of channel dimension pattern and profile to the extent possible • Improve floodplain functionality by matching floodplain elevation with bankfull stage thereby increasing watershed attenuation and reducing peak flows • Establish native floodplain vegetation which will allow treatment of diffuse storm flow and nutrient uptake while establishing part of a wildlife corridor in the watershed �II �J i J 0 FJ U P) • Remove invasive exotic vegetation species from the stream corridor • Improve the natural aesthetics of the stream corridor and • Improve the water quality in the Kings Creek watershed by reducing bank erosion increasing nutrient storage and uptake and increasing dissolved oxygen of the system The monitoring year three (MY3) vegetation plot data indicate that the project meets the established criterion for planted stem density which is a minimum survival of 320 planted stems per acre at the end of the year three monitoring period Average stem density for planted stems in MY3 is approximately 634 stems per acre Additionally when planted and natural stems are combined the average stem density is 2 752 stems per acre which is well above the minimum established criterion Of the 48 planted stems recorded within the monitoring plots almost all (98 %) had vigor codes of good or excellent Problems with vegetation consist of areas of low stem densities adjacent to the stream reach as well as approximately fifteen currently isolated patches of high threat invasive plant species that span the project extent A supplemental live stake planting occurred on March 16 2011 in those areas noted with low stem densities and eroding banks Stream longitudinal profiles have remained relatively stable among monitoring years The primary stream issue observed during MY3 was bank erosion resulting from thalweg migration and low woody stem densities All other morphological metrics indicated performance percentages averaging between 88 and 100% Based on the presence of wrack lines and crest gauge monitoring two bankfull events were documented in MY3 Summary information/data related to the occurrence of items such as beaver or encroachment and statistics related to performance of various project and monitoring elements can be found in the tables and figures in the report appendices Narrative background and supporting information formerly found in these reports can be found in the mitigation and restoration plan documents available on EEP s website All raw data supporting tables and figures in the appendices is available from EEP upon request Kings Creek Final L Project No 208 Monitoring Year 3 of 5 Equinox Environmental Consultation and Design Inc November 2011 w 2 0 Methodology The stream monitoring methodologies utilized in 2011 were Intended to replicate those employed during previous monitoring years and are based on standard guidance and procedures documents (Rosgen 1996 and USACE 2003) Vegetation monitoring data were collected following the standard CVS EEP Protocol for Recording Vegetation Level II (Lee et al 2008) Kings Creek Final 2 Equinox Environmental Consultation and Design Inc O Project No 208 November 2011 Monitoring Year 3 of 5 0 3 0 References Lee M T R K Peet S D Roberts and T R Wentworth 2008 CVS EEP Protocol for Recording Vegetation Version 4 2 NCEEP (North Carolina Ecosystem Enhancement Program) May 2006 Mitigation Report Kings Creek Restoration Project Raleigh NC Rosgen D L 1996 Applied River Morphology Wildland Hydrology Books Pagosa Springs CO USACE (U S Army Corps of Engineers) 2003 Stream Mitigation Guidelines USACOE USEPA NCWRC NCDENR DWQ Wilmington District Kings Creek Final f J Protect No 208 Momtonng Year 3 of 5 I 3 Equinox Environmental Consultation and Design Inc November 2011 rJ LI Appendix A F1 Project Vicinity Map and Background Tables �I 0 U t j �. 80 276 =� Kings Creek { rLil _ Stream Restoration Site 64 15 ,... 276 _ ti Merv. "°�� .,oases cam. J v. GtlY Pd4 Fig ure - cin,^ 1 Vi Vicinity Map �" C r Stream Hi estion Site R rora Kings Creek E UINOX- Q �1 _ -_ FNVI R ON N RNTA I. nM t o� y Stream Restoration Site PeROm GRA a r� cm, Cw , Y , cwm• Project No. 208 N Directions: From Raleigh, proceed west on 1-40 W to Asheville. 0 0.5 1 2 $ Take the Sweeten Creek Rd/US -25 A exit (Exit 51). Proceed j Miles south on US -25 -Alt to NC -280 S in Fletcher. Continue on NC- 280 S towards Brevard. NC -280 S becomes US -276 S/US -64 Transylvania County, North Carolina in Bre vard. After passing Brevard College turn left on E French 7.5 Minute Series Brevard Broad St and continue to Park Ave. Turn left on Park Ave for Quadrangle approximately 114 mile and project site is on the left. Appendix A Project Vicinity Map and Background Tables Information unavailable *The anticipated mitigation units are based on the expected yields due to the lack of a full 30 -foot riparian buffer on portions of the stream Kings Creek Final A -2 Equinox Environmental Consultation and Design, Inc. Project No. 208 November 2011 Monitoring Year 3 of 5 compt IRS Restoration Stream Non -Ripar Upland Buffer Riparian Wetland (Ac) BMP Level I (Ac) Ac (Ac) Riverine Non- Riverine Restoration 1,926 Enhancement Enhancement I Enhancement II 191 Creation Preservation HQ Preservation 0 0 Totals 2,117 0.0 0.0 0.0 0.0 BMP Count *Anticipated 1,631 0.0 0.0 0.0 0.0 0 SNWTotals *The anticipated mitigation units are based on the expected yields due to the lack of a full 30 -foot riparian buffer on portions of the stream Kings Creek Final A -2 Equinox Environmental Consultation and Design, Inc. Project No. 208 November 2011 Monitoring Year 3 of 5 Appendix A Project Vicinity Map and Background Tables - Activit or Deliverable Table 2.° Project XTUfy and Reporting' "ry, , , Kings Creek /Project No. 208 IlapsedTime Since Graiing Complete: 5 Year$ IlapsedTlme Since Planting Complete: 5 Years Number of Data Collection Complete Completion or Delivery Restoration Plan - Final Desi - Construction Plans - 9/24/2004 Construction N/A 2006 Live Stakes and Bare Root Trees Planted N/A 2006 Miti ation Plan / As -built Year 0 Monitorin - Baseline - May-06 Year 1 Monitorin 2008 2008 Year 2 Monitorin Nov -10 Nov -10 Suoplemental Live Stake Plantiniz Effort Mar -11 Mar -11 Year 3 Monitorin Nov -11 Nov -11 Year 4 Monitorin Year 5 Monitorin - Information unavailable N/A - Item does not apply Kings Creek Final A -3 Equinox Environmental Consultation and Design, Inc. Project No. 208 November 2011 Monitoring Year 3 of 5 Appendix A Project Vicinity Map and Background Tables Designer Buck Engineering/ Michael Baker Corp. 797 Haywood Road, Suite 201 Asheville, North Carolina 28806 Primary Project Design POC Andrew Bick (828) 350 -1408 Construction Contractor L -J, Inc. 220 Stoneridge Drive, Suite 405 Columbia, SC 29210 Construction Contractor POC Richard Goodwin (803) 929 -1181 Survey Contractor Joel Johnson Land Surveying Survey Contractor POC Joel Johnson (828) 586 -6488 Planting Contractor Unknown Planting Contractor POC Unknown Seeding Contractor Unknown Planting Contractor POC Unknown Seed Mix Sources Unknown Nursery Stock Suppliers Unknown Monitoring Performers (YO) - 2006 Buck Engineering/ Michael Baker Corp. 797 Haywood Road, Suite 201 Asheville, North Carolina 28806 Stream Monitoring POC Unknown Vegetation Monitoring POC Unknown Monitoring Performers (Y1) - 2008 North Carolina Wildlife Resources Commission 171 Southern Cross Road Weaverville, North Carolina 28787 Stream Monitoring POC Jeff Ferguson (828) 231 -3517 Vegetation Monitoring POC Jeff Ferguson (828) 231 -3517 Monitoring Performers (Y2) - 2010 Equinox Environmental Consultation & Design, Inc. 37 Haywood Street, Suite 100 Asheville, North Carolina 28801 Stream Monitoring POC Steve Melton (828) 253 -6856 Vegetation Monitoring POC Sarah M arcinko (828) 253 -6856 Monitoring Performers (Y3) - 2011 Equinox Environmental Consultation & Design, Inc. 37 Haywood Street, Suite 100 Asheville, North Carolina 28801 Stream Monitoring POC Win Taylor (828) 253 -6856 Vegetation Monitoring POC Kevin Mitchell (828) 253 -6856 Monitoring Performers (Y4) - 2012 Stream Monitoring POC Vegetation Monitoring POC Monitoring Performers (Y5) - 2013 Stream Monitoring POC Vegetation Monitoring POC Unknown - Information was unknown at time of report submittal Kings Creek Final Project No. 208 Monitoring Year 3 of 5 A -4 Equinox Environmental Consultation and Design, Inc. November 2011 Appendix A Project Vicinity Map and Background Tables Table 4. Project Attributes Project County Transylvania Ph sio ra hic Region Blue Ridge Ecore ion Broad Basins Project River Basin French Broad USGS HUC for Project 14 digit) 06010105010050 NCDW Sub -Basin for Project 04 -03 -01 Within Extent of EEP Watershed Plan No WRC Class Warm CooL Cold Cool % of Project Easement Fenced or Demarcated 0% Beaver Activity Observed DurinR Desipm Phase U Restoration Component Attributes Kings Creek Drainage Areas .mi. 4.2 Stream Order Second Restored Length feet 2,119 Perennial or Intermittent Perennial Watershed Type Urban Watershed LULC Distribution - Watershed Impervious Cover - NCDW AU / Index Number 6-30 NCDWQ Classification C / Tr 303d Listed No Upstream of 303d Listed Segment No Reasons for 303d Listing or Stressor N/A Total Acreage of Easement 6.11 Total Vegetated Acreage within Easement 5.66 Total Planted Acreage as Part of Restoration 5.56 Ros en Classification of Pre-Existing - Ros en Classification of As -Built C4 Valley Type - Valley Slope - Valley Side Slope Range - VaHey Toe Slope Range - Cowardin Classification N/A Trout Waters Designation Yes Species of Concern Endangered, Etc. - Dominant Soil Series and Characteristics Series Depth - Cla % - K - T - - Information unavailable N/A - Item does not apply Kings Creek Final A -5 Equinox Environmental Consultation and Design, Inc, Project No. 208 November 2011 Monitoring Year 3 of 5 Appendix B Visual Assessment Data z. Prepared for Uurrent Uondition Plan View ",. Ad ult as ement PROGRAM Project: Kings Creek Year 3 Monitoring Transylvania County, North Carolina Sheet 1 of 1 Date November 2011 Notes: 1) Base Map Data Provided by NCEEP 2) 2010 Aerial Photo Project Number NCEEP # 208 Legend — — Easement Boundary - As -Built Centerline �— As -Built Top of Bank Structures — Cross Section Long Pro Start ® Crest Gauge A, Control Points Year 3 Conditions In- Stream Structure Condition - - Stressed BanWBed Condition s Bank - Mass Wasting =Ezw Bank - Scoured / Eroding Tr Bank - Undercut � Bed Aggradation Vegetation Plots ® Criteria Met Vegetation Problem Areas ® Invasives - Dense Invasives - Present Low Stem Density EgUINOX ENV RO NMENTAL coxmvansx a acwox Appendix B Visual Assessment Data Table 5 Visual Stream Mo logy StabSlity Assess�;ut Kings Creek /Project Kings Creek Final Project No 208 Monitoring Year 3 of 5 B 2 Equinox Environmental Consultation and Design Inc November 2011 D%20_8 Assessed I e 2 119 feet Numbe Numbe Footag Atbusted% Map Chan 1 Chann 1 Sta61 Total Numbe f Amou tof 7 Stabl with with f C teg y S b Categ y Metr f �m g Numbe Unstad Uastabl P f mr g Stall g Stahl Stahl g g As built Segme is Footag as Inte ded Woody Woody Woody as as Inte led V g tab V g tahon Veg tatr 1 B d — — — —I A¢pladat Bar f nnat n/gr wth ffn gnf aptly -- -- -- — _ -- — -- - -- — _ I V rt cal Stahl ty d fleet fl w I t ally ( I d p int bar ) l 74 964 (R ffl and R U ) 2 D Mr dat E d f d w ttin& 0 0 1007 2 [bM C drt I T xt e/S b t t R ffl main at ar b at 13 13 1007 3 M de Pool I D pth S IT t (Max Pool D pth Mean Bankf U D p h 1 6) 12 12 10017 C dtt 2 Le Zh pp p t ( 3017 f Im d an b twee tad f p eam ffl and head f d w t earn ffl ) 12 12 1007 1 Thalw g t mg p earn f meand be d (R ) 7 12 587 4 Thai %egPost 2 Thalw g ce t mg t d w t am f mednd be d (GI d) 10 11 917 2 B It Banklackr g get t cm It g mplyfr mp gr wth� — — _ — — 1 Sco red /Fiodt g and/ co and g 360 927— 8 113 947 Bank d rc t/ hangs g th )t h mas was g ppear 2 U dere t hk ly Does NOT I d d t that ar modes appear 2 119 977 2 28 987 ainabl and ar p dmg h b tat 3 Mas Wast g Bank I rnp g, al g Hap 3 177 967 3 50 977 INNAR tale 13 656 857 13 191 897 3 Fngr red 1 Overall Integnty Stm tar phy tally do w th d lodged bo Id I gs 14 16 887 Strud re 2 Grade C trol G d t I truce re xh b g mau f gr d th 11 21 24 887 2a Pip g Stru tur lackmg any b ant a1 fl w d mea h 11 arm 24 24 1007 977 3 B k Prot d Bank w hm h m t xt t f fl doe NOT 29 30 � 157 P l f rmi g tru t maintat g M ax P ID ph M an 4 Habitat Bankf 11 D pth R t 1 6 Rootwad /I gs p d g me t 12 12 1007 has fl w Kings Creek Final Project No 208 Monitoring Year 3 of 5 B 2 Equinox Environmental Consultation and Design Inc November 2011 r Appendix C Vegetation Plot Data J I i I f t Appendix C Kings Creek Final Project No 208 Monitoring Year 3 of 5 Vegetation Plot Data Vegetation Plot Vegetation ID Survival Tract Mean Threshold Met9 1 Yes 2 1 Yes 100% 3 1 Yes C 1 Equinox Environmental Consultation and Design Inc November 2011 Appendix C Vegetation Plot Data Vegetation Monitoring Plot 1 Monitoring Year 3 — June 23, 2011 Kings Creek Final Project No. 208 Monitoring Year 3 of 5 Vegetation Monitoring Plot 2 Monitoring Year 3 — June 23, 2011 C -2 Equinox Environmental Consultation and Design, Inc. November 2011 Appendix C Vegetation Plot Data Kings Creek Final Project No. 208 Monitoring Year 3 of 5 Vegetation Monitoring Plot 3 Monitoring Year 3 — June 23, 2011 C -3 Equinox Environmental Consultation and Design, Inc. November 2011 I U Appendix C Vegetation Plot Data Table 8 CVS Vegetation Plot Metadata Kings Creek / Project No 208 Report Prepared By Owen Carson Date Prepared 6/27/2011 15 55 Database Name Equinox 2011 A KingsCreek MY3 mdb Database Location Z \ES \NRI &M\EEP Monitonng \Kings Creek \KC MY3 2011 \Data \Veg Computer Name D16TNK71 File Size 136433920 DESCRIPTION OF WORKSHEETS IN THIS DOCUMENT Metadata Description of database file the report worksheets and a summary of project(s) and project data Proj Planted Each project is listed with its PLANTED stems per acre for each year This excludes lire stakes Proj Total Stems Each project is listed with its TOTAL stems per acre for each year This includes lire stakes all planted stems and all naturalAolunteer stems Plots List of plots surveyed with location and summary data (lire stems dead stems missing etc) Vigor Frequency distribution of vigor classes for stems for all plots Vigor by Spp Frequency distribution of ingor classes listed by species Damage List of most frequent damage classes with number of occurrences and percent of total stems impacted by each Damage by Spp Damage values tallied by type for each species Damage by Plot Damage values tallied by type for each plot Planted Stems by Plot and Spp A matrix of the count of PLANTED living stems of each species for each plot dead and missing stems are excluded ALL Stems by Plot and spp A matrix of the count of total living stems of each species (planted and natural volunteers combined) for each plot dead and missing stems are excluded PROJECT SUMMARY Project Code 208 project Name Kings Creek Description On the campus of Brevard College River Basin French Broad Length(ft) Stream to Edge Width (ft) Area (sq m) Required Plots (calculated) Sampled Plots 3 Kings Creek Final Project No 208 Monitoring Year 3 of 5 C 4 Equinox Environmental Consultation and Design Inc November 2011 Appendix C Vegetation Assessment Data TWO 9 Planted and Total Stem Counts (Spede by Plot Wth Anneal Mews) Kings Creek / Project Na 208 C t Plot Data (MY3 2011) Annual Means S bti Name Common Name Spec a Type E208 -01 0001 E208 -01.0002 E208 -01 0003 MY3 (20 1) MY2 (2010) Pn IS P all T PnoIS Pall T Pn LS Pall T Pn IS Pall I T Pn LSJ P all I T A mbmm at rubtum R d mapl Tre 13 7 96 116 113 Alit aul t H zel Id Shrub Tre 6 6 6 1 1 6 1 1 1 8 8 13 10 10 10 Aro ra arb of 1 Red h keb try Shrub 2 2 3 2 2 3 2 2 2 B t I gra Ri buch Tre 2 2 2 3 3 3 2 2 2 7 7 7 8 8 8 C m morrum S Iky d gw d Shrub 3 3 8 1 1 1 1 3 3 8 3 3 5 C ryl are Arre h zel t Shrub 1 1 1 I 1 I I 1 l Framn p yl Gee h Tre 1 1 l 1 1 1 1 1 1 H n mehs mgin ar irgm Ame wt hh zel Shrub 4 4 4 2 2 2 1 1 1 7 7 7 5 5 5 J gl gra Bl kw I t Tre 2 Liq d mbar tyra fl Sw tg m Tie 1 1 2 Lm d d t hprf ra t hp f ra T l p tre Y 11 w p pla Wh t w d Tre 6 4 1 3 13 12 Ny yl t BI kg m Tre 2 2 2 2 2 2 2 2 2 Pm trob Ea t m wh t p Tit l Platan d t hs ar d t l Sy more PI tre Tit 5 5 7 3 3 3 8 8 17 16 16 27 15 IS 39 Prtr rotm ar rot BI k h try IShrub Tre 1 Qu rc ph 11 W O w k Tre I 1 Sahx gra BI k will w Tre I 3 4 3 S rnb d is Comm Id rb try Shrub Tre 1 1 I I 1 1 Stem unt 22 22 50 10 11 27 15 1 15 1 127 47 48 204 47 48 209 (ar ) 1 1 1 3 3 (ACRES) 002 002 002 007 007 Spec unt 6 1 6 1 10 5 1 6 1 8 6 1 6 1 9 9 10 14 9 10 18 Stems pe ACRE 890 31 J 890 3112023 4 40469 445 151 1092 7 607 03 607 0315139 51 634 01 1 647 5 127519 IMI 5 2819 3 in as qu m oY i U i Kings Creek Final Project No 208 Monitonng Year 3 of 5 �= 1, = U L = = =--- = C 5 Equinox Environmental Consultation and Design Inc November 2011 -) = = = (_ � _j = I, Appendix D Stream Survey Data F Appendix D 2115 2114 2113 2112 2111 2110 a� 2109 w 2108 0 2107 a� W 2106 2105 2104 2103 2102 2101 2100 0+00 Stream Survey Data Kings Creek/ Project No. 208 Cross - Section 1 - Riffle Station 6 +84 Kings Creek Final Project No. 208 Monitoring Year 3 of 5 0 +10 0 +20 0 +30 0+40 0 +50 0+60 0 +70 0 +80 0 +90 1+00 Station (feet) MYO 5/2006 MY2 6/22/2010 { MY3 2/17/2011 - - - - Bkf D -1 Equinox Environmental Consultation and Design, Inc. November 2011 Appendix D Stream Survey Data Cross - Section 1 — Riffle (Looking at Left Bank Descending) Monitoring Year 3 — February 17, 2011 Kings Creek Final Project No. 208 Monitoring Year 3 of 5 Cross - Section 1 — Riffle (Looking at Right Bank Descending) Monitoring Year 3 — February 17, 2011 D -2 Equinox Environmental Consultation and Design, Inc. November 2011 Appendix D Stream Survey Data Cross - Section 1 — Riffle (Looking Downstream) Monitoring Year 3 — February 17, 2011 Kings Creek Final Project No. 208 Monitoring Year 3 of 5 Cross - Section 1 — Riffle (Looking Upstream) Monitoring Year 3 — February 17, 2011 D -3 Equinox Environmental Consultation and Design, Inc. November 2011 Appendix D 2115 2114 2113 2112 2111 2110 a� 2109 w = 2108 0 2107 a� W 2106 2105 2104 2103 2102 2101 2100 0+00 Stream Survey Data Kings Creek/ Project No. 208 Cross- Section 2 - Pool Station 7 +85 0 +10 0 +20 0 +30 0+40 0 +50 0+60 0 +70 0 +80 0 +90 1+00 1 +10 1 +20 1 +30 Station (feet) MYO 5/2006 MY2 6/22/2010 — MY3 2/17/2011 — — — Bkf Kings Creek Final D -4 Equinox Environmental Consultation and Design, Inc. Project No. 208 November 2011 Monitoring Year 3 of 5 Appendix D Stream Survey Data Cross - Section 2 — Pool (Looking at Left Bank Descending) Monitoring Year 3 — February 17, 2011 Kings Creek Final Project No. 208 Monitoring Year 3 of 5 Cross - Section 2 — Pool (Looking at Right Bank Descending) Monitoring Year 3 — February 17, 2011 D -5 Equinox Environmental Consultation and Design, Inc. November 2011 Appendix D Stream Survey Data Cross - Section 2 — Pool (Looking Downstream) Monitoring Year 3 — February 17, 2011 Cross - Section 2 — Pool (Looking Upstream) Monitoring Year 3 — February 17, 2011 Kings Creek Final D -6 Equinox Environmental Consultation and Design, Inc. Project No. 208 November 2011 Monitoring Year 3 of 5 Appendix D 2110 2109 2108 2107 2106 a 2105 w G 0 2104 i� C� W 2103 2102 2101 2100 2099 2098 0+00 Stream Survey Data Kings Creek/ Project No. 208 Cross- Section 3 - Riffle Station 15 +13 0 +10 0 +20 0 +30 0+40 0 +50 0+60 0 +70 0+80 0 +90 Station (feet) • MYO 5/2006 MY2 6/24/2010 - MY3 2/18/2011 - - - - Bkf Kings Creek Final D -7 Equinox Environmental Consultation and Design, Inc. Project No. 208 November 2011 Monitoring Year 3 of 5 Appendix D Stream Survey Data Cross - Section 3 — Riffle (Looking at Left Bank Descending) Monitoring Year 3 — February 18, 2011 Cross - Section 3 — Riffle (Looking at Right Bank Descending) Monitoring Year 3 — February 18, 2011 Kings Creek Final D -8 Equinox Environmental Consultation and Design, Inc. Project No. 208 November 2011 Monitoring Year 3 of 5 Appendix D Stream Survey Data Cross - Section 3 — Riffle (Looking Downstream) Monitoring Year 3 — February 18, 2011 Cross - Section 3 — Riffle (Looking Upstream) Monitoring Year 3 — February 18, 2011 Kings Creek Final D -9 Equinox Environmental Consultation and Design, Inc. Project No. 208 November 2011 Monitoring Year 3 of 5 Appendix D 2110 2109 2108 2107 2106 a 2105 w C 0 2104 w a W 2103 2102 2101 2100 2099 2098 0+00 Stream Survey Data Kings Creek / Project No. 208 Cross - Section 4 - Pool Station 16 +17 0 +10 0 +20 0 +30 0+40 0 +50 0+60 0 +70 0+80 0 +90 Station (feet) • MYO 5/2006 MY2 6/24/2010 ■ MY3 2/18/2011 - - - - Bkf Kings Creek Final D -10 Equinox Environmental Consultation and Design, Inc. Project No. 208 November 2011 Monitoring Year 3 of 5 Appendix D Stream Survey Data Cross - Section 4 — Pool (Looking at Left Bank Descending) Monitoring Year 3 — February 18, 2011 Cross - Section 4 — Pool (Looking at Right Bank Descending) Monitoring Year 3 — February 18, 2011 Kings Creek Final D -1 I Equinox Environmental Consultation and Design, Inc. Project No. 208 November 2011 Monitoring Year 3 of 5 Appendix D Stream Survey Data Cross - Section 4 — Pool (Looking Downstream) Monitoring Year 3 — February 18, 2011 Cross - Section 4 — Pool (Looking Upstream) Monitoring Year 3 — February 18, 2011 Kings Creek Final D -12 Equinox Environmental Consultation and Design, Inc. Project No. 208 November 2011 Monitoring Year 3 of 5 Appendix D 2120 2118 2116 2114 2112 2110 2108 w 2106 c 0 2104 W 2102 2100 2098 2096 2094 2092 2090 l� O Stream Survey Data Kings Creek Longitudinal Profile 1,bo �,bo $r'bO sbo 6�0 �,bo �,bo 9,bo ro ,f rr� r�� j� d O 'b O O O O O O O O O O O O O Station (feet) Thalweg WO Thalweg MYt Thalweg MY2 Thalweg MY3 • Bkf WS C Structures Kings Creek Final D -13 Equinox Environmental Consultation and Design, Inc. Project No. 208 November 2011 Monitoring Year 3 of 5 Appendix D Stream Survey Data ® e / WWOFM ©20 s Se D50 2011 Descnption Material Sim (mm) Total # Item % Cum % Silt/Clay sdUclay 0 062 0 0% 0% Sand very fine sand 0 125 4 4% 4% file sand 025 2 2% 6% medium sand 050 5 5% 11% coarse sand 100 6 6% 17% very coarse sand 200 3 3% 20% Gravel very fine gravel 40 2 2% 22% fine gravel 57 4 4% 26% fine gravel 80 3 3% 29% medium gravel 113 14 14% 43% medium gravel 160 13 13% 56% coarse gravel 223 8 8% 64% coarse gravel 32 18 18% 82% very coarse gravel 45 12 12% 94% very coarse gravel 64 4 4% 98% Cobble small cobble 90 1 1% 99% medium cobble 128 0 0% 99% large cobble 180 1 1% 100% very large cobble 256 0 00/0 100% Boulder small boulder 362 0 00/0 100% small boulder 512 0 00/0 100% medium boulder 1024 0 00/0 100% large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 00/0 100% TOTALS1 100 100% 100% S D D50 13 D84 34 D95 49 Kings Creek Final Project No 208 Monitoring Year 3 of 5 D 14 Equinox Environmental Consultation and Design Inc November 2011 Appendix D Stream Survey Data Kings Creek Final D 15 Equinox Environmental Consultation and Design Inc Project No 208 November 2011 Monitoring Year 3 of 5 Kings Creek Pebble Count Percent Cumulative Cross Section 1 Riffle sr r � I t001y � d '' 1 90 °/ 80'9 F 709 60 GS V 50 % 0. v a 409 u 4 F ! r�II s �E v 309 204' 09 O O� O O D N M b � N b Y N O N i I! O � Y .0 � 0 P ti l S e (mm) — MY2 6116/2010 -4@--MY3 2/17/2011 Kings Creek Pebble Count Percent Individual Cross Section 1 Riffle 25 9 209 15-1 o e 10'9 a sY 0 l N 1G V N Ln - N R `O N 00 n R O 00 O N b C� N 00 �4 N N o V1 %0 N 7 O1 0 V w . •v " N M h O O N O 'T p�O a Particle Size (mm) O MY2 6/16/2010 ■MY3 2/17/2011 Kings Creek Final D 15 Equinox Environmental Consultation and Design Inc Project No 208 November 2011 Monitoring Year 3 of 5 r � I � Kings Creek Final D 15 Equinox Environmental Consultation and Design Inc Project No 208 November 2011 Monitoring Year 3 of 5 i v a 4 F ! r�II s Kings Creek Final D 15 Equinox Environmental Consultation and Design Inc Project No 208 November 2011 Monitoring Year 3 of 5 Appendix D i i J ri �l Stream Survey Data C* e / I WRIM 20 Sec e + 2011 Description Matenal Size (mm) Total # Item % Cum % Sdt/Clay sflt/clay 0 062 0 00/0 0% Sand very fine sand 0 125 0 0% 00/0 fine sand 025 11 11% 11% medium sand 050 4 4% 15% coarse sand 100 0 No 15% very coarse sand 200 2 2% 17% Gravel very fine gravel 40 2 2% 19% fine gravel 57 2 2% 21% fine gravel 80 2 2% 23% medium gravel 113 7 7% 30% medium gravel 160 18 18% 48% coarse gravel 223 13 13% 61% coarse gravel 32 16 16% 77% very coarse gravel 45 13 13% 90% very coarse gravel 64 6 6% 96% Cobble small cobble 90 3 3% 99% medium cobble 128 1 1% 100% large cobble 180 0 00/0 100% very large cobble 256 0 0% 100% Boulder small boulder 362 0 0% 100% small boulder 512 0 0% 100% medium boulder 1024 0 00/0 100% large boulder 2048 0 00/0 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 100% TOTALS 100 100% 100% Kings Creek Final Project No 208 Monitoring Year 3 of 5 D 16 Equinox Environmental Consultation and Design Inc November 2011 Appendix D Stream Survey Data � 9 t / � V 5 F � } t 1 i 4 Kings Creek Final D 17 Equinox Environmental Consultation and Design Inc Project No 208 November 2011 Monitoring Year 3 of 5 Kings Creek Pebble Count Percent Cumulative Cross Section 2 Pool 10017 90'Y 80'9 70q r F e 60T GS C V 50'9 w 4017 E 30'9 U9 2017 10 4' 09 yy pp 'O 0.} P ti 1 S (mm) — MY2 6/16/2010 -60—MY3 2/17/2011 Kings Creek Pebble Count Percent Inds ldual Cross Section 2 Pool 25'9 203' 15'9 .fl A 10'9 0. 511 b N N O •� N 00 V ,� O GO O ti ti N V 01 H � to N N eq 00 a, 0'9 Y O � N M h O O O b Parts le S (mm) 0MY2 6/16/2010 8 MY3 2/17/2011 � 9 t / � V 5 F � } t 1 i 4 Kings Creek Final D 17 Equinox Environmental Consultation and Design Inc Project No 208 November 2011 Monitoring Year 3 of 5 U F J Appendix D Stream Survey Data s Se on 3 ► D 2011 Description Material Size (mm) Total # Item % Cum % Silt/Clay silt/clay 0 062 0 00/0 0% Sand very fine sand 0 125 0 0% 00/0 fine sand 025 8 8% 8% medium sand 050 7 7% 15% coarse sand 100 1 1% 16% very coarse sand 200 5 5% 21% Gravel very fine gravel 40 2 2% 23% fine gravel 57 4 4% 27% fine gravel 80 1 1% 28% medium gravel 113 3 3% 31% medium gravel 160 7 7% 38% coarse gravel 223 8 8% 46% coarse gravel 32 21 21% 67% very coarse gravel 45 15 15% 82% very coarse gravel 64 5 5% 87% Cobble small cobble 90 1 1% 88% medium cobble 128 9 9% 97% large cobble 180 2 2% 99% very large cobble 256 1 1% 100% Boulder small boulder 362 0 00/0 100% small boulder 512 0 0% 100% medium boulder 1024 0 00/0 100% large boulder 2048 0 NO 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 100% TOTALS 100 100% 100% S D D50 24 D94 52 D95 120 Kings Creek Final Project No 208 Monitoring Year 3 of 5 D 18 Equinox Environmental Consultation and Design Inc November 2011 Appendix D Stream Survey Data d a.F Y a � r„ t i �a h +s Kings Creek Final D 19 Equinox Environmental Consultation and Design Inc Project No 208 November 2011 Monitoring Year 3 of 5 Kings Creek Pebble Count Percent Cumulative CrossSecbon 3 Riffle 1009 909 809 Fe 709 609 G� 509 40 9 E 309 U 20 9 109 — —. 09 O O O .•� N O m Particle Size (mm) —+—MY2 6116/2010 fMY3 2/18/2011 Kings Creek Pebble Count Percent Individual Cross Section 3 Riffle 25 9 201Y 0 159 c a 109 a 59 N to Ln to N to l O 00 O O N M 7 �O O� N 00 W) N N 11D .� N 00 ID W 7 as 09 O O .r 'r N M In Particle Size (mm) OMY2 6/16/2010 ■MY3 2/18/2011 d a.F Y a � r„ t i �a h +s Kings Creek Final D 19 Equinox Environmental Consultation and Design Inc Project No 208 November 2011 Monitoring Year 3 of 5 e1 II F-1 II r I Appendix D Stream Survey Data � e o C e on e � ry D50 2011 Descnphon Matenal Sim (nun) Total # Item % Cum % Sdt/Clay silt/clay 0 062 1 1% 1% Sand very fine sand 0 125 3 3% 4% fine sand 025 18 18% 22% medium sand 050 11 11% 33% coarse sand 100 10 10% 43% very coarse sand 200 9 9% 52% Gravel very fine gravel 40 1 1% 53% fine gravel 57 3 3% 56% fine gravel 80 3 3% 59% medium gravel 113 5 5% 64% medium gravel 160 15 15% 79% coarse gravel 223 9 9% 88% coarse gravel 32 5 5% 93% very coarse gravel 45 7 7% 100% very coarse gravel 64 0 00/0 100% Cobble small cobble 90 0 0% 100% medium cobble 128 0 0% 100% large cobble 180 0 00/0 100% very large cobble 256 0 0% 100% Boulder small boulder 362 0 0% 100% small boulder 512 0 00/0 100% medium boulder 1024 0 00/0 100% large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 00/0 100% TOTALS 100 100% 100% Stunmary � ata D50 17 D84 19 D95 35 Kings Creek Final Project No 208 Monitoring Year 3 of 5 D 20 Equinox Environmental Consultation and Design Inc November 2011 Appendix D Stream Survey Data Kings Creek Final D 21 Equinox Environmental Consultation and Design Inc Project No 208 November 2011 Monitoring Year 3 of 5 Y 4 Kings Creek f Pebble Count Percent Cumulat ve Cross Section 4 Pool ve 1001y 90T 809' 709' C 609' W u 50 9' a 409' 309' E U9 20 9' 109 t; —i 09' O O N t7 VI O O m Pa t 1 S (mm) —a—MY2 6/16/2010 —MY3 2/18/2011 Kings Creek Pebble Count Percent Ind dual Cross Section 4 Pool k Y Y + 251Y 209' s 1591 o .c, 1 10'9 y F 5'9 � 4 09 N D tn N tn H N N N 7 00 \D N N kn 00 O N R fn O N 00 �O N N 7 00 M �4 Q V CN Y V d Cq Pa t cle S e (mm) OMY2 6/16/2010 ■MY3 2/18/2011 Kings Creek Final D 21 Equinox Environmental Consultation and Design Inc Project No 208 November 2011 Monitoring Year 3 of 5 Y 4 f 3 of 5 Appendix D Stream Survey Data able Da Basedne 3he1M ata Creek ! Pro et No 208 Paramete I--g R g tail C w P DO h g C 41h R f R ach( ) Data T-M g Momto 6 Bas I Dwal —I&Ts bstrateUMMM= LL UL Eq Mt M M d Ma SD M M M d M SD M M d M M M M d M SD Bankf II W d h (f ) 242 255 25 5 267 N/A 2 FI dpm Wdh (f) 1� 150 150 150 150 N/A 2 Bmkf H M m Dep h (f) 2 1 22 2 2 22 N/A 2 Bankf H M az D p h (f) 30 3 1 3 1 3 1 N/A 2 Bankfull C Sec a1 A (f) 519 552 55 2 58 5 N/A 2 W d h/D p h R �' 113 L3'6135 8 11 8 122 N/A 2 E hm Rat 360 3 65 370 N/A 2 Bank H gh R ®® 10 10 1 10 10 N/A 2 Pco91 Rdn Le gth (f) 29 3 46 0 44 4 68 2 13 2 10 Rdfl SI p (f /f) ®� 0 0026 00069 0 005910 0153 00039 10 P I Le gth (f) 52 4 58 6 69 8 l5 6 11 P IM.Dph(f)�i�® �81 22 23 34 05 11 P I Sp mg (f) ®� 1506 143 2 220 9 40 9 8 Patbem Chan 1Blwdh(f) 610 1108 1075 1730 352 12 Rad f C ry (f) 410 620 560 1390 267 11 R Bankf HWdh(f/f)��� M eand W I gth (f) 1 0� 231 0 2768 240 0 4140 776 5 M and Wdh Rat 40 42 42 44 N/A 2 TranspmtParam te_n R ach Sh S ( mp y) (Ib /R) � Max art a (mm) m b hz d baakfull S eam P w ( an P Pw ) (Whn) Adtlill��Re th�Te�n_meteie R ge CI S at C4 BmkfuH V Im y (fp > BmkfuH D huge ( f ) V H y Le gth (f) 1 694 Chan I Th Iw b Le gth (f) 1 815 2 135 S y(f) 107 128 W S fac SI p (Chan 1) (f /f) 00049 Bankf H SI p (f /f) 00044 Bankfull Floodph m Are (acre ) ,b f Reach w h E od g Bank Chan I S abd y H b M B 1 gi a1 Cher N/A I f rm doe pply Kings Creek Final D 22 Equinox Environmental Consultation and Design Inc Project No 208 November 2011 Monitoring Year 3 of 5 Appendix D Stream Survey Data Table lOb Baseline Stream Bata 7—.- ( irate Bed, ank Hyd�obgic Containment IHstos) Cre h/ Pro t N 208 R ache I &III Pararmt Pr Flo h g Con(Etl — — R r nc R acW ) Data — — Desig W ton g Bus lice R %/R T /P % /G % /S% �� — -- — — 33% 10% 41% 16% 0% SC9 /SA % /G9 /C % /B %/B % � � � r �® dl6 /d35 /d50 /d84 /d95 /d /d (mm) bme C� 5 99 10 99/ C1 0 �M� M� �m R Rd0 /R R /P P I/G Gld /S St n SC St] CI y / SA Sand / G G I / C C bbl /B B Ida / B Bedrock d max p /d max bp I f M dabl Kings Creek Final Project No 208 Monitoring Year 3 of 5 D 23 Equinox Environmental Consultation and Design Inc November 2011 U O i� I I �I I � J I j Appendix D Stream Survey Data Table l�la. MomW Data D>tmensio MoTQhology (Dunenslonal Param felts ross Sechoas) Creek / Pro ct No 208 Cross Sechon 1 Riffle Cross-Section 2 Pool Dimension Base MY1 MY2 MY3 MY4 MY5 Base MY1 MY2 MY3 MY4 MY5 Reco d el t (d t m) d 21089 21089 21081 2108 l Bankfull W dth (ft) 267 268 268 311 303 298 Floodp rone W dth (ft) >150 > 150 >150 > 150 >150 >150 Bankf 11 Mean Depth (ft) 22 22 2 1 25 1 9 19 Bankf 11 Max Depth (ft) 3 1 33 33 47 37 35 Bankf lI C s Sect o a] Area (ft) 585 580 573 766 585 556 Bankf 11 W dth/Depth Rat o 122 124 125 127 157 160 Bankf 11 E t chment Rat o >3 7 >5 6 >5 6 >3 9 >4 9 >5 0 Bankf 11 Bank H ght Rat o 10 10 10 1 0 1 1 1 1 C Sect al A ea Betwee E d P (ft) 596 584 616 574 d50 (mm) 24 13 16 17 Cross-Section 3 Riffle Cross-Section 4 Pool Dimension Base MY1 MY2 MY3 MY4 MY5 Base MY1 MY2 MY3 MY4 MY5 Record ele at o (d t m) d 21047 21047 121041 2104 1 Bankf Il W dth (ft) 242 257 256 283 258 259 Floodpro e W dth (ft) >150 >150 >150 >150 >150 >150 Bankf 11 Mean Depth (ft) 21 2 1 20 20 25 26 Bankf 11 Max D pth(ft) 30 32 31 31 44 45 Bankf 11 Cross Sect o al Are (ft) 519 53 1 520 555 63 1 674 Bankf 11 W dth/Depth R t 1 1 3 124 126 144 105 99 Bankf l] Ent enchme t R t >3 6 >5 8 >5 9 >3 2 >5 8 >5 8 Bankf ll Bank He ght Rat o 10 10 10 10 10 10 C oss Sect al A ea Between E d Pms (ft) 602 593 661 693 d50 (mm) 1 33 24 13 2 I format o u ail bl Kings Creek Final D 24 Equinox Environmental Consultation and Design Inc _I Project No 208 November 2011 Monitoring Year 3 of 5 Appendix D Stream Survey Data de ap SC S. ac be N an m m Kings Creek Final Project No 208 Monitoring Year 3 of 5 i& ed- D 25 Equinox Environmental Consultation and Design Inc November 2011 �l ©00000000000000 ��C �i�OO� �r�t�oot�r�oc�t�00000t�00000000 C�f�Of�CIO�OI�DOO��DO(�l�O ©0000000000�t� �������C7C7l ������oo • �����rior�0000r. ������ ©o ©000000000000 ©0 ©0000 ©00 ©0 ©00 de ap SC S. ac be N an m m Kings Creek Final Project No 208 Monitoring Year 3 of 5 i& ed- D 25 Equinox Environmental Consultation and Design Inc November 2011 Lq- J� Appendix E Hydrologic Data r-- I� J� Appendix E Hydrologic Data J r�l � I Appendix E Hydrologic Data Table Z Ver,<Sicabon of B= full Events � s Creetc /Pro ct No 208 Date of Data Date of Collection Occurrence Method Photo # (d available) 6/15/2010 Unknown Crest gauge & wrack Imes 11/9/2010 Unknown Crest gauge & wrack Imes 1/20/2011 Unknown Crest gauge & wrack lines 10/2612011 9/6/2011 Crest gauge & wrack Imes Kings Creek Final Project No 208 Momtonng Year 3 of 5 E I Equinox Environmental Consultation and Design Inc November 2011