Loading...
HomeMy WebLinkAbout20210177 Ver 1_Pre-Filing Meeting Request_20210126ID#* 20210177 Version* 1 Regional Office* Winston-Salem Regional Office - (336) 776-9800 Reviewer List* Sue Homewood Pre -Filing Meeting Request submitted 1/26/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Amy James ajames@eprusa.net Cobb Creek/Sandy Berry Creek Stream Stabilization Yadkin Valley Sewer Authority Yadkin Street Address 500 NC Hwy 268 W Address Line 2 aty Elkin Rbstal / Zip Code 28621 Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No State / Frovince / Region NC Country USA Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below. * Stream relocation and streambank stabilization to avoid encroachment of existing sewer lines into channel area caused by erosion. Project will be completed using natural channel design principles, where possible, to achieve functional uplift while providing long-term bank stabilization. Please give a couple of dates you are available for a meeting. 2/9/2021 2/4/2021 2/11 /2021 2/16/2021 Please attach the documentation you would like to have the meeting about. JVC_AII_Sheets_11 x17. pdf 6.6MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 1/26/2021 r 00 N I"Is Lf) W m ♦ ! ` b iI� LO W m ♦ ! z Q 00 O O U z MM� 1`1 i� ICJ n l� u L n O 0� a. L---j INDEX OF SHEETS 1 . - . TITLE SHEET 1 A . - . STREAM CONVENTIONAL SYMBOLS GENERAL NOTES CONSTRUCTION SEQUENCE 2 - - - TYPICAL SECTIONS 2A-2C - - - DETAILS 3 - 3A ... TABLES 4-6 - - - PLAN AND PROFILE GRAPHIC SCALES 20 10 0 20 40 PLANS 20 10 O 20 40 PROFILE (HORIZONTAL) 5 2.5 O 5 10 PROFILE (VERTICAL) YADKIN VALLEY SEWER AUTHORITYdrSTATE LNCIPROJECTREFEREN�ENo. 138 Q yt//���+� APPLICANT NUMBER. OOO-UI✓F6-00 DESIGN DATA COBB CREEK SANDY BERRY CREEK DIN-385727 DIN-385728 DESIGN STREAM TYPE YADKIN COUNTY BAN KFULL XSEC AREA O F 3T2 O F 7T2 BANKFULL WIDTH 21 .1 FT 33.5 FT BANKFULL DEPTH 2.1 FT 2.9 FT LOCATION: YADKIN COUNTY, NC W/D RATIO 15 16 TYPE OF WORK: STREAM STABILIZATION PROJECTLENGTH -�i COBB CREEK EXISTING STREAM LENGTH = 691 FEET --�-�- COBB CREEK PROPOSED DESIGN STREAM LENGTH = 577 FEET ♦� SANDY BERRY CREEK EXISTING STREAM LENGTH = 230 FEET SANDY BERRY CREEK PROPOSED DESIGN STREAM LENGTH =224 FEET I� �� 77 ADKIN RIVER • DIN 385728 BY1P Y 1 .-- � � J I N Eck 67 ►�-- St. BUS- 21 0 ' JONESVILLE l �� 5 N Pop.2,246 Cedar- brook or. 1n eSUtlle 'p, J o DIN 385727 Swan Creek Cobb P, Stad�Um � RLINGTON S I PREPARED FOR: JaaKin V�,ey peP��F AND SEA e`er Jintb0 APPLICANT NUMBER: 000-UI9F6-00 500 NORTH CARD LINA 268 W ELKIN, NC 28621 JERRYTWIGGS, P.E. PROJECT ENGINEER Chappell Macemore PREPARED IN THE OFFICE OF: ECOSYSTEM 1 150 SE MAYNARD RD, PLANNING & SUITE 14 J NC CART, 2751 1 RESTORATION LICENSE # P-1 182 KEVIN TWEEDY, P.E. PROJECT ENGINEER LETTING DATE: EMMETT PERDUE, P.E. PROJECT DESIGN ENGINEER PROJECT ENGINEER PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION P.E. SIGNATURE: STREAM CONVENTIONAL SYMBOLS 0 ROCK J-HOOK JH — SF — SAFETY FENCE ROCK VANE Rv — SS — SANITARY SEWER OFFSET ROCK CROSS VANE ov — — SILT FENCE ROCK CROSS VANE xv ce CONSERVATION EASEMENT CONSTRUCTION SEQUENCE TEMPORARY SILT CHECK — - 20 — - EXISTING MAJOR CONTOUR ROOT WAD Rw EXISTING MINOR CONTOUR GRADE CONTROL J-HOOK VANE GJH — 20 — PROPOSED MAJOR CONTOUR ® LOG VANE Lv — 21 — PROPOSED MINOR CONTOUR ® LOG STEP Ls — — — LIMITS OF DISTURBANCE 000 ROCK STEP Rs — — — BANKFULL BENCH (GRADE) DOUBLE DROP ROCK CROSS VANE DD — — PROPERTY LINE CONSTRUCTED CASCADE cc ACCESS ROAD CONSTRUCTED RIFFLE cR 1 00 I STREAM THALWEG BOULDER CLUSTER STREAM TOP OF BANKS %K74"WaNk LOG ROLLER LR FOOT BRIDGE TEMPORARY STREAM CROSSING TO BE ADDED AT 100%DESIGN GRADE CONTROL WOODY RIFFLE wR u � PERMANENT FORD STREAM CROSSING PPc ® TRANSPLANTED VEGETATION TOEWOOD WITH GEOLIF I O TREE REMOVAL SOD MATS sM TREE PROTECTION GEOLIFT DEBRIS JAM DJ-T# CHANNEL FILL _ DITCH PLUG SINGLE WING DEFLECTOR GRADE BANK 2:1 OR FLATTER DOUBLE WING DEFLECTOR : ',_ EXISTING WETLANDS *`NOTE: ALL ITEMS ABOVE MAY NOT BE USED ON THIS PROJECT GENERAL NOTES 1. THE CONTRACTOR IS REQUIRED TO INSTALL INSTREAM STRUCTURES USING A TRACK HOE WITH A HYDRAULIC THUMB OF SUFFICIENT SIZE TO PLACE BOULDERS, AND STRUCTURES. 2. WORK IS BEING PERFORMED AS AN ENVIRONMENTAL STABILIZATION PLAN. THE CONTRACTOR SHOULD MAKE ALL REASONABLE EFFORTS TO REDUCE SEDIMENT LOSS AND MINIMIZE DISTURBANCE OF THE SITE WHILE PERFORMING THE CONSTRUCTION WORK. 3. CONSTRUCTION IS SCHEDULED TO BEGIN FALL 2021 . REVISIONS NO. DESCRIPTION ENGR. APPROV DATE 1 65% DESIGN PLANS EMP KLT 1/08/21 ,�dydn V��y f +ti °r Rabb°< APPLICANT NUMBER00OU19F6-00500 NORTH CAROLINA 268 W ELK]N. NO 28621 DR4543-NC / WO 60879 / DIN 385727 - DIN 385728 YADKIN COUNTY. NC ECOSYSTEM PLANNING & RESTORATION 1 150 SE MAYNARD RD, SUITE 140 CARY, NC 2751 1 LICENSE # P-1 162 PROJECT # SHEET NO. 138 JI 1A SYMBOLOGY / NOTES PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION Stream Station ABKF (SF) WBKF (FT) W1 (FT) W2 (FT) D1 (FT) D2 (FT) S1 (FT/FT) S2 (FT/FT) APOOL (SF) WPOOL (FT) W3 (FT) W4 (FT) D3 (FT) D4 (FT) S3 FT/FT) S4 (FT/FT)Cobb Creek 10+00 to 23+30 30.0 21.2 5.3 5.3 0.36 1.76 15:1 3:1 52.0 25.0 0.5 12.0 0.00 4.00 0:1 3:1Sandberry Creek 10+00 to 12+28 69.7 33.5 8.9 7.8 0.33 2.6027:1 3:1 132.0 40.0 2.0 18.0 0.00 6.00 0:1 3:1TYPICAL CROSS SECTION DIMENSIONS DOUBLE DROP ROCK CROSS VANE SPECIFICATIONS MATERIALS: SPECIFICATIONS: TYPE: TBD SIZE: TBD BOULDER NUMBER OF HEADER ROWS: 1 NUMBER OF FOOTER ROWS:1 TYPE: TYPE 2 NON -WOVEN FILTER FABRIC WIDTH UPSTREAM: 6 FT MINIMUM STONE BACKFILL TBD NOTES FOR DOUBLE DROP CROSS VANE 1 . INSTALL GEOTEXTILE FABRIC BEGINNING AT THE MIDDLE OF THE HEADER ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK, AND THEN UPSTREAM TO A MINIMUM OFTEN FEET. 2. DIG ATRENCH BELOW THE BED FOR FOOTER ROCKS AND PLACE FILL ON UPSTREAM SIDE OF VANE ARM, BETWEEN THE ARM AND STREAM BANK. 3. START AT BANKFULL AND PLACE FOOTER ROCKS FIRST AND THEN HEADER(TOP) ROCK. 4. CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND SLOPE SPECIFICATIONS. 5. AN EXTRA BOULDER CAN BE PLACED IN SCOUR POOL FOR HABITAT IMPROVEMENT. 6. USE STONE BACKFILL TO FILL GAPS ON UPSTREAM AND DOWNSTREAM SIDES OF BOULDERS. 7. AFTER ALL STONE HAS BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE WITH ON -SITE ALLUVIUM TO THE ELEVATION OF THE TOP OF THE HEADER ROCK. LOG VANE SPECIFICATIONS MATERIALS: SPECIFICATIONS: TYPE: TBD BOULDER SIZE: TBD TYPE: HARDWOOD LOGS SIZE: 12 INCH 0 MIN. NUMBER OF HEADER LOGS: 1 NUMBER OF FOOTER LOGS: 1 FILTER FABRIC TYPE: TYPE 2 NON -WOVEN WIDTH UPSTREAM: 6 FT MINIMUM STONE BACKFILL TBD NOTES FOR LOG VANE STRUCTURES: 1. STRUCTURE DIMENSIONS AND MEASUREMENTS ARE SHOWN ON THE STRUCTURE TABLES. 2. LOGS SHOULD BE STRAIGHT, HARDWOOD, AND NOT ROTTEN. 3. BOULDERS WILL BE USED TO ANCHOR LOGS VANES WHERE LOGS CANNOT BE BURIED INTO THE BED AND BANK SUFFICIENTLY AS DIRECTED BY THE ENGINEER. 4. SOIL SHOULD BE COMPACTED WELL AROUND BURIED PORTIONS OF LOGS. 5. BOULDER SHOULD BE PLACED ON TOP OF HEADER LOG FOR ANCHORING. 6. FILTER FABRIC SHOULD BE NAILED TO THE LOG BELOW THE BACKFILL. REVISIONS NO. DESCRIPTION 1 65% DESIGN PLANS LOG BELOW STRE PREPF ,�dydn V��y it f APPLICANT NUMBER: 00&U19F6-00500 NORTH CAROLINA 268 W �ELKIN, NC 28621NC 28621 DOUBLE DROP ROCK CROSS VANE DD 1/3 1/3 1/3 BOTTOM BOTTOM BOTTOM WIDTH OF WIDTH OF WIDTH OF STREAM BED ELEVATION- BANKFULL FLOW ---Z STONE BACKFII GEOTEXTILE 7 FLOODPLAIN SILL POOLS NO GAPS BETWEEN (EXCAVATED PER DIRECTION OF ENGINEER) BOULDERS DEPTH = AVERAGE BANKFULL DEPTH x 1.5 TO 2.0 PLAN VIEW IZ - ELEVATION POINT (SEE STRUCTURE TABLES) LOG VANE LD A' _CGS BURIED IN STREAMBANK AT LEAST 5' PLAN VIEW 0 - ELEVATION POINT (SEE STRUCTURE TABLES) FLOW HEADER HEADER LOG FOOTER HEADER ROCK - FOOTER ROCK SCOUR POOL (EXCAVATED) PROFILE VIEW HEADER ROCK STONE BACKFILL� STR-"Ef1AMBE-"Dt1 GEOTEXTILE FABRIC FOOTER ROCK O' MINIMU SECTION A - A SVpPti y FOOTER LOG PROFILE VIEW A -A' STONE BACKFILL--- FLOW DR4543-NC / WO 60879 / DIN 385727 -DIN 385728 I YADKIN COUNTY, NC FILTER FABRIC SECTION B - B' PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 1 150 SE MAYNARD RD, SUITE 140 CARY, NC 2751 1 LICENSE # P-1 182 77 PROJECT # SHEET NO. 138 2A DETAILS PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION 0 n� J a F (n w N W �I m ro 0 7 D U) ^U Nw NO \� �a CONSTRUCTED RIFFLE SPECIFICATIONS MATERIALS: SPECIFICATIONS: TYPE: HARVESTED ON -SITE OR COMPARABLE RIFFLE BED MATERIAL SIZE: TBD THICKNESS: TBD COIR FIBER MATTING SEE DETAIL NOTES FOR CONSTRUCTED RIFFLE STRUCTURES: 1. GRADE STREAMBED AND BANKS TO PROPOSED DIMENSIONS PER TYPICAL CROSS-SECTION AND PROFILE. 2. EXCAVATE TRENCH BELOW PROPOSED STREAMBED ELEVATION EQUAL TO OR GREATER THAN RIFFLE THICKNESS, 3. INSTALL COIR FIBER MATTING ALONG STREAMBANKS ENSURING MATTING IS SUFFICIENTLY TRENCHED ALONG TOE OF BANK. 4.FILL TRENCH WITH RIFFLE BED MATERIAL TO FINAL DESIGN STREAM GRADE. OFFSET ROCK CROSS VANE SPECIFICATIONS MATERIALS: SPECIFICATIONS: TYPE: TBD SIZE: TBD BOULDER NUMBER OF HEADER ROWS: 1 NUMBER OF FOOTER ROWS: 1 FILTER FABRIC TYPE: TYPE 2 NON -WOVEN WIDTH UPSTREAM: 6 FT MINIMUM STONE BACKFILL TBD NOTES FOR OFFSET ROCK CROSS VANE: 1. STRUCTURE DIMENSIONS AND MEASUREMENTS ARE SHOWN ON THE STRUCTURES TABLES. 2. DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS AND PLACE FILL ON UPSTREAM SIDE OF VANE ARM, BETWEEN THE ARM AND STREAMBANK. 3. PLACE FOOTER ROCKS AND THEN HEADER ROCKS TO ACHIEVE DESIGN DIMENSIONS AND ELEVATIONS. 4. USE HAND PLACED STONE TO FILL GAPS ON UPSTREAM SIDE OF HEADER AND FOOTER ROCKS. 5. PLACE FILTER FABRIC BEGINNING ATTHE TOP OF THE HEADER ROCKS AND EXTENDING DOWN TO THE BOTTOM OF THE FOOTER ROCKS, THEN OUTWARD THE DISTANCE SPECIFIED. 6. INSTALL STONE BACKFILL AS SHOWN. 7. AFTER ALL STONE BACKFILL HAS BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE WITH ONSITE ALLUVIUM TO THE ELEVATION OF THE TOP OF HEADER ROCK. REVISIONS 1 1 1 65% DESIGN PLANS I EMP I KLT 101 /08/211 TOP OF BANK BOTTOM WIDTH O LL PLAN VIEW CONSTRUCTED RIFFLE CR HEAD OF RIFFLE FLLy 1 R/PELF RIFFLE THICKNESS -OE OF BANK 2 RIFFLE BED MATERIAL %'T3 o POOL B' i PROFILE A -A' BOTTOM WIDTH COIR FIBER COIR FIBER MATTING MATTING (SEE DETAIL) FLE BED MATERIAL (SEE DETAIU TOP OF BANK TOE OF BANK COIR FIBER MATTING SHOULD BE RIFFLE THICKNESS TRENCHED THROUGH RIFFLE BED MATERIAL RIFFLE BED MATERIAL SECTION B -B' 0 - ELEVATION POINT (SEE STRUCTURE TABLES) OFFSET ROCK CROSS VANE D HEADER ROCK BANKFULL 2 FLOW v 3 ARM SLOPE J STONE BACKFILL —, 1LOW NQ 2Y FOOTER ROCK T R mQ FILTER FABRIC �N� GqN gN PROFILE VIEW A -A' A' INSIDE ARM VANE OUTSIDE ARM ARM 3 NO GAPS BETWEEN ROCKS ANGLE B 4 OUTSIDE ARMS `B' �} ,�dydn V��y s JAI APPLICANT NUMBER: OOPU19F6-00500 NORTH CAROLINA 268 W ELKIN, NC 28621 SCOUR POOL - _ SCOUR POOL (EXCAVATED) PER DIRECTION OF ENGINEER PLAN VIEW 0 - ELEVATION POINT (SEE STRUCTURE TABLES) STONE BACKFILL HEADER ROCK FILTER FABRICS `FOOTER ROCK SECTION B - B' VANE ARM CROSS SECTION DR4543-NC / WO 60879 / DIN 385727 - DIN 385728 YADKIN COUNTY, NC ECOSYSTEM PLANNING & RESTORATION 1 150 SE MAYNARD RD, SUITE 140 CARY, NC 2751 1 LICENSE # P-1 182 77 PROJECT # SHEET NO. , 138 2B DETAILS PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION PLAN VIEW- 1 TRENCH EXCAVATION COIR FIBER MATTING COMPACTED BACKFILL — UNDISTURBED EARTH /• COIR FIBI %\ MATTING DEPTH SEESTRUCTURE TABLES TOE WOOD WITH GEOLIFT TW 1 NSTALL ROOTWADS 'ERPENDICULAR TO FLOW SEE NOTE 4) :CAVATE CUT TRENCH (SEE NOTE 3) W I !Z m OF 4 W 41 A J � tiJ A� 4, PLAN VIEW - 2 ROOTWAD INSTALLATION LIVE CUTTINGS PLACED UNDERNEATH COIR FIBER MATTING GEOLIFTS-ENCASE IN COIR FIBER MATTING (SEE SPECIFICATIONS) — LIVE CUTTINGS 4 DENSE BRUSH LAYER: N,. CONSISTING OF LIMBS, BRANCHES, SMALL LOGS ON -SITE ALLUVIUM WIDTH SEE STRUCTURE TABLES REVISIONS O. DESCRIPTION 1 1 65% DESIGN PLANS PREPF ,�dydn V��y it f APPLICANT NUMBER: 00&UI9F6-00500 NORTH CAROLINA 268 W �ELKIN, NC 28621NC 28621 BASEFLOW - UNCONSOLIDATED BACKFILL: SOIL AND COBBLE ROOTWAD FINISHED BED J ELEVATION SECTION VIEW - ELEVATION POINT (SEE STRUCTURE TABLES) PLAN VIEW - 3 BRUSH LAYER INSTALLATION POINT BAR OF CHANNEL (SEE TYPICAL SECTIONS) DR4543-NC / WO 60879 / DIN 385727 -DIN 385728 I YADKIN COUNTY, NC 77 PROJECT # SHEET NO. 138 2C DETAILS INSTALL BRUSH MATERIAL (SEE NOTE 5). AFTER BRUSH LAYER HAS BEEN COMPLETED INSTALL SOIL LAYER (NOTE 6) AND COVER WITH COIR FIBER MATTING (NOTE 7). PLACE LIVE CUTTINGS IN LAYER ON TOP OF COIR FIBER MATTING (SEE NOTE 8). TOE WOOD SPECIFICATIONS MATERIALS: SPECIFICATIONS: BRUSH MATERIAL TYPE: BRUSH MATERIAL SIZE: MIN. 5 FT LONG. 1 INCH DIAMETER ROOTWAD MATERIAL TYPE: HARDWOOD SIZE: MIN. 6 FT LONG MIN. 12 INCH DIAMETER COIR FIBER MATTING SEE DETAIL NOTES FOR TOE WOOD STRUCTURES: 1. STRUCTURE DIMENSIONS AND MEASUREMENTS ARE SHOWN ON THE STRUCTURE TABLES. 2. DIG A TRENCH ALONG BANK WHERE TOE WOOD IS TO BE INSTALLED, TO THE DEPTH AND WIDTH SPECIFIED IN THE DETAILS AND STRUCTURE TABLES. IF TOE WOOD IS BEING PLACED IN A LOCATION WHERE THERE IS NOT EXISTING GROUND, PLACE FILL MATERIAL AND COMPACT TO FORM THE TRENCH FOR THE TOE WOOD MATERIALS. 3. EXCAVATE TRENCH BELOW TOEWOOD GRADE (PLAN VIEW 1). TO ELEVATION POINTS 2 AND 4. 4. INSTALL ROOTWADS PERPENDICULAR TO THE FLOW AS SHOWN IN PLAN VIEW 2. 5. INSTALL BRUSH MATERIAL INCLUDING BRANCHES, LOGS, AND BRUSH, AND AT LEAST 1 "IN DIAMETER. LARGE MATERIALS AND SMALL MATERIALS SHALL BE MIXED, PLACED IN LAYERS NO MORE THAN I FOOT DEEP, COVERED IN ATHIN LAYER OF ONSITE ALLUVIUM, AND COMPACTED BEFORE PLACING THE NEXT LAYER OF TOE WOOD MATERIAL. CONTINUE PLACING MATERIALS TO FORM A DENSE LAYER OF WOODY MATERIALS AND ONSITE ALLUVIUM TO THE DEPTH AND ELEVATIONS SPECIFIED (PLAN VIEW 3). 6. PLACE AN UNCONSOLIDATED LAYER OF SOIL AND COBBLE ON TOP OF BRUSH LAYER. 7. COVER SOIL AND COBBLE LAYER IN COIR FIBER MATTING. S. INSTALL LIVE CUTTINGS, INCLUDING BRANCHES AND BRUSH, AT LEAST 5 FEET IN LENGTH, AND AT LEAST 1 INCH IN DIAMETER. 9. CONSTRUCT GEOLIFTS OR PLACE TRANSPLANTS AS SPECIFIED OR DIRECTED BY THE ENGINEER) TO REBUILD THE STREAMBANK ABOVE THE TOE WOOD LAYER. PREPARED IN THE OFFICE OF: ECOSYSTEM PLANNING & RESTORATION 1 150 SE MAYNARD RD, SUITE 140 CARY, NC 2751 1 LICENSE # P-1 182 PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION REVISIONS 1 1 1 65% DESIGN PLANS I EMP I KLT 101 /08/211 ,�dydn V��y s APPLICANT NUMBER: OO&Ul9F6-00500 NORTH CAROLINA 268 W ELKIN, NC 28621 STRUCTURE TABLES TO BE ADDED AT 100% DESIGN DR4543-NC / WO 60879 / DIN 385727 - DIN 385728 YADKIN COUNTY, NC ECOSYSTEM PLANNING & RESTORATION 1 150 SE MAYNARD RD, SUITE 140 CARY, NC 2751 1 LICENSE # P-1 182 PROJECT # SHEET NO. , 138 TABLES PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION REVISIONS NO. DESCRIPTION ENGR. APPROV DATE 1 65%DESIGNPLANS EMP KLT 1/08/21 ,�dydn V��y f it APPLICANT NUMBER: 00&UI9F6-00500 NORTH CAROLINA 268 W ELKIN, NC 28621 VEGETATION SELECTION TO BE ADDED AT 100% DESIGN DR4543-NC / WO 60879 / DIN 385727 - DIN 385728 YADKIN COUNTY. NC ECOSYSTEM PLANNING & RESTORATION 1 150 SE MAYNARD RD, SUITE 140 CARY, NC 2751 1 LICENSE # P-1 182 PROJECT # SHEET NO. 138 3A TABLES PROGRESS DRAWING FOR REVIEW PURPOSES ONLY DO NOT USE FOR CONSTRUCTION 2F�a EP ■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ::::::::::::::::■::::::::::::::::::::::::::::::::::::::::::::::iiiiiiiii:::::::::::::::::::::::::::: ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ Emommomommmmmm■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ 1 I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ MIll:::::::iii::::::::::::::::::::::::::::ii:iii:::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■W■■W WV■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ..................................................................: 2F�a EP :::::::::.................................................................... ........................................................................................................................................................................ ........................................................................................................................................................................................................ ........................................................................................................................................................................................................ ........................................................................................................................................................................................................ ....::........::........::........::........::........::........... ..................................I 2F�a EP