HomeMy WebLinkAboutNCG030011_Inspection Report_20210225ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Director
Borg Warner Cooling Systems
Attention: Grover Dehart
Post Office Box 1509
Fletcher, North Carolina 28732
NORTH CAROLINA
Environmental Quality
February 25, 2021
Subject: Compliance Evaluation Inspection
Borg Warner Cooling Systems
Permit: NCG030000
Certificate of Coverage: NCG030011
Henderson County, North Carolina
Dear Mr. DeHart:
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection I conducted at the subject facility on February 25, 2021.
The report should be self-explanatory, however, should you have any questions
concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email
at Isaiah.reed@ncdenr.gov.
Since y,
Isaiah Reed, EI, CPSWQ, D
Environmental Specialist
Land Quality Section
Enclosure: Inspection Report
D_E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
rvoam cnAourvA
ow.�m.nt01W Wouw� 828.296.4500
Compliance Inspection Report
Permit:NCG030011 Effective: 11/01/18 Expiration: 05/31/21 Owner: Borg Warner Cooling Systems
SOC: Effective: Expiration: Facility: Borg Warner Cooling Systems
County: Henderson Cane Creek Industrial Par
Region: Asheville
Fletcher NC 28732
Contact Person: Grover Dehart Title: Phone: 828-684-3501 Ext.128
Directions to Facility:
System Classifications: SWNC.
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 02/24/2021
Primary Inspector: Isaiah L Reed
Secondary Inspector(s):
Certification: Phone:
Entry Time 01:OOPM Exit Time: 01:30PM
Phone: 828-296-4614
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Metal Fabrication Stormwater Discharge COC
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG030011 Owner -Facility: Borg Warner Cooling Systems
Inspection Date: 02/24/2021 Inspection Type: Compliance Evaluation Reason for visit: Routine
Inspection Summary:
On February 24, 2021 this facility was inspected for compliance. After waiting in the lobby and attempting to contact facility
management, no staff were made available for the inspection. The permittee has failed to provide documentation necessary
to determine compliance with the permit.
The permittee shall ensure staff are available for the follow-up inspection and all following compliance inspections. If facility
staff able to assist in providing the documentation are too limited, the permittee shall expand the stormwater training
program to include all staff necessary to accommodate both announced and un-announced inspections in the future.
This facility will be re -inspected. If staff are not made available to provide all documentation necessary to determine
compliance with the permit, further action will be taken.
If you have any questions, please contact this office at (828) 296-4614
Page 2 of 3
Permit: NCG030011 Owner - Facility: Borg Warner Cooling Systems
Inspection Date: 02/24/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
❑ 0 ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
❑ 0 ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑ 0 ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑ 0 ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
❑ 0 ❑ ❑
# Does the facility provide all necessary secondary containment?
❑ 0 ❑ ❑
# Does the Plan include a BMP summary?
❑ 0 ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑0 ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
❑0 ❑ ❑
# Does the facility provide and document Employee Training?
❑ 0 ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
❑ 0 ❑ ❑
# Is the Plan reviewed and updated annually?
❑ 0 ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑ 0 ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
❑ N ❑ ❑
Comment: A Stormwater Pollution Prevention Plan was not made available at the time of the inspection
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ ❑
Comment: Monitoring records were not made available at the time of the inspection
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ E ❑
Comment: Monitoring records were not made available at the time of the inspection
Permit and Outfalls
Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 ❑ ❑
# Were all outfalls observed during the inspection? ❑ 0 ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑
Comment:
Page 3 of 3