HomeMy WebLinkAboutNCC202708_Modification Review_20210225Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 2/24/2021 8:58:45 PM (ADD TO FILE Submittal)
Approve by Georgoulias, Bethany 2/25/2021 3:08:01 PM (Construction COC ADD TO FILE Review- NCC202708)
• The task was assigned to Georgoulias, Bethany. The due date is: March 1, 2021 5:00 PM
2/24/2021 8:59 PM
Y . Ta4M1
NORTH CAPOLINA
EnYlrenmemf& Qualay
Certificate of
NCC202708
Coverage (COC)
Enter the Certificate of Coverage Ninber (Use capital letters)
No.*
Information associated
with this permit:
Project Name
Marshall CAMA CAP Pilot Well Installation
Address
8202 E. Highway 150, Sherrils Ford, NC
County
Catawba
Latitude
35.5966
Longitude
-80.9718
Permittee Listed
Duke Energy Carolinas, LLC
Legally Responsible
David Dellario
Individual
NC Reference No.
NCG01-2020-2708
E&SC Plan ID
CATAW-2020-017
Original NOI
27414
Tracking No.*
Date COC Issued*
06/26/2020
Prior Rescission
This field will populate only if CCChas already been rescinded.
Date
Modification Information:
Reason for r Closed -Out Lots/Outparcels in E&SC Plan
Modification * r Additional Lots/Outparcels Approved - E&SC Revised
F Other Revision(s) to E&SC Plan
r Legally Responsible Individual and/or Site Contact Has Changed
r Multiple Reasons (List)
Addional We information (e.g., new Site Contact details). If lots are being added, please include specific lot nunbers.
Explanation An increase in LOD by 0.3 acres.
You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan
sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable
sheets).
For changes to the legally responsible individual, you must upload this form.
Supporting Upload Supporting Documentation (%vised IRSCApproval, (lose -Out Doc, etc.)
Documentation Approval Letter for Marshall CAP Well LOD
2.2MB
Expansion.pdf
Wst be FDFfornat
North Carolina General Statute 143-215.6113 (i) provides that:
Anyperson who knowinglymakes anyfalse statement, representation, or certification in anyapplication, record, report, plan, or other
documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement
of a material fact in a rulemaking proceeding or contested case underthis Article; orwho falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine notto exceed ten thousand
dollars ($10,000).
� I hereby request modification to coverage under the NPDES Stormwater Permit
for the subject project site. I am familiar with the information contained in this
request and to the best of my knowledge and belief such information is true,
complete and accurate.
Specify if you are:* r The Legally Responsible Individual
f Authorized Responsible Person*
*This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B,
Item (6) of that permit.
Signature i
Type Name* David Dellario
Title * GM - CCP Project Management
Organization* Duke Energy Carolinas, LLC
Date * 02/24/2021
Email Address* David.Dellario@duke-energy.com
5mil for confin-ration
Telephone Number* 980 242-1764
Contact nunber if we need to reach you
Note: Original permittee and site contact are copied on modification correspondence.
Additional Email Additional errail for conf irrration
(Optional)
Original Permittee david.dellario@duke-energy.com
Email
Original Site Contact chris.randazzo@duke-energy.com
Email
Review Date 02/25/2021
Rescinded Since
Submitted?
Request Date 20210224
Formatted
Review Date 20210225
Formatted