Loading...
HomeMy WebLinkAboutNCC202708_Modification Review_20210225Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 2/24/2021 8:58:45 PM (ADD TO FILE Submittal) Approve by Georgoulias, Bethany 2/25/2021 3:08:01 PM (Construction COC ADD TO FILE Review- NCC202708) • The task was assigned to Georgoulias, Bethany. The due date is: March 1, 2021 5:00 PM 2/24/2021 8:59 PM Y . Ta4M1 NORTH CAPOLINA EnYlrenmemf& Qualay Certificate of NCC202708 Coverage (COC) Enter the Certificate of Coverage Ninber (Use capital letters) No.* Information associated with this permit: Project Name Marshall CAMA CAP Pilot Well Installation Address 8202 E. Highway 150, Sherrils Ford, NC County Catawba Latitude 35.5966 Longitude -80.9718 Permittee Listed Duke Energy Carolinas, LLC Legally Responsible David Dellario Individual NC Reference No. NCG01-2020-2708 E&SC Plan ID CATAW-2020-017 Original NOI 27414 Tracking No.* Date COC Issued* 06/26/2020 Prior Rescission This field will populate only if CCChas already been rescinded. Date Modification Information: Reason for r Closed -Out Lots/Outparcels in E&SC Plan Modification * r Additional Lots/Outparcels Approved - E&SC Revised F Other Revision(s) to E&SC Plan r Legally Responsible Individual and/or Site Contact Has Changed r Multiple Reasons (List) Addional We information (e.g., new Site Contact details). If lots are being added, please include specific lot nunbers. Explanation An increase in LOD by 0.3 acres. You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). For changes to the legally responsible individual, you must upload this form. Supporting Upload Supporting Documentation (%vised IRSCApproval, (lose -Out Doc, etc.) Documentation Approval Letter for Marshall CAP Well LOD 2.2MB Expansion.pdf Wst be FDFfornat North Carolina General Statute 143-215.6113 (i) provides that: Anyperson who knowinglymakes anyfalse statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; orwho falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine notto exceed ten thousand dollars ($10,000). � I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. Specify if you are:* r The Legally Responsible Individual f Authorized Responsible Person* *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature i Type Name* David Dellario Title * GM - CCP Project Management Organization* Duke Energy Carolinas, LLC Date * 02/24/2021 Email Address* David.Dellario@duke-energy.com 5mil for confin-ration Telephone Number* 980 242-1764 Contact nunber if we need to reach you Note: Original permittee and site contact are copied on modification correspondence. Additional Email Additional errail for conf irrration (Optional) Original Permittee david.dellario@duke-energy.com Email Original Site Contact chris.randazzo@duke-energy.com Email Review Date 02/25/2021 Rescinded Since Submitted? Request Date 20210224 Formatted Review Date 20210225 Formatted