HomeMy WebLinkAbout20120612 Ver 1_Approval Letter_20120627AN A
t
NC®ENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality {
Beverly Eaves Perdue Charles Waklld P E Dee Freeman
Governor Director Secretary t
June 27 2012 ;
Hoke County <,
NCDWQ Project No 20120612
Bridge 97 on SR 1452 i
State Project No 8B 204721
r;
APPROVAL of 401 WATER QUALITY CERTIFICATION, with ADDITIONAL CONDITIONS ,
Mi Richard W Hancock P E Division Engineer
NCDOT Division 8
902 N Sandhills Blvd
Aberdeen NC 28315
,
r
Dear Mr Hancock
You have our approval in accordance with the conditions listed below for the following impacts for the purpose of
replacing Bridge No 97 with a 27 10 x 5 10 x 54 if aluminum box culvert on SR 1452 (McNeil Lake Road) in I
Hoke County
I
Stream impacts in the Lumber River Rasm
Site
Station
Permanent
Temporary
Permanent
Temporary
Total
Stream
(ac)
Fill in
Fill in
Fill in
Fill in
Stream
Impacts
Intermittent
Intermittent
Perennial
Perennial
Impact
Requiring
WI
0 001
Stream
Stream
Stream
Stream
(linear ft)
Mitigation
Total
0 001
linear ft
linear ft
linear ft
linear ft
N/A
linear ft
S1
10 +25 L
54
40
0
0
94
0
Total
54
40
0
0
94
0
Total Stream Impact for Project 94 linear feet
Wetland imnacts in the lumber Rasin (rinarianl
Site
Fill
Fill
Excavation
Mechanized
Hand Clearing
Area under
Total Wetland
(ac)
(temporary)
(ac)
Clearing (ac)
(ac)
Bridge
Impact (ac)
ac
ac
WI
0 001
0
0
0
0
N/A
0 001
Total
0 001
0
0
0
0
N/A
0 001*
Total Wetland Impact for Project 0 001 acres *actual total wetland impact is 72 sq ft
The project shall be constructed in accordance with your application dated received June 21 2012 After reviewing ,
your application we have decided that these impacts are covered by General Water Quality Certification Number
3886 This certification corresponds to the Nationwide Permit 14 issued by the Corps of Engineers In addition
you should acquire any other federal state or local permits before you proceed with your project including (but not
limited to) Sediment and Erosion Control Non Discharge and Water Supply Watershed regulations This approval
will expire with the accompanying 404 permit
225 Green St Suite 714 Fayetteville NC 28301 5043
Phone 910433 33001 FAX 910486 0707
Internet www rimaterguality orq
An Equal Opportunity Affirmative Action Employer 50 Recycled i 10 Post Consumer Paper
NorthCarohna
aturalz
F
r
k
}
t
t
r
i�
r
s
r
This approval is valid solely for the purpose and design described in your application (unless modified below)
Should your project change you must notify the NCDWQ and submit a new application If the property is sold the E
new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying �E
with all the conditions If total wetland fills for this project (now or in the future) exceed one acre or of total
impacts to streams (now or in the future) exceed 150 linear feet compensatory mitigation may be required as
described in I SA NCAC 2H 0506 (h) (6) and (7) For this approval to remain valid you must adhere to the
conditions listed in the attached certification and any additional conditions listed below
Condition(s) of Certification
Project Specific Conditions
1 For the 40 linear feet of streams being impacted due to site dewatering activities the site shall be graded to its
preconstruction contours and revegetated with appropriate native species r
2 Strict adherence to the most recent version of NCDOT s Best Management Practices For Bridge Demolition
and Removal approved by the US Army Corps of Engineers is a condition of the 401 Water Quality
Certification
The stream channel shall be excavated no deeper than the natural bed material of the stream to the maximum
extent practicable Efforts must be made to minimize impacts to the stream banks as well as to vegetation
responsible for maintaining the stream bank stability Any applicable riparian buffer impact for access to
stream channel shall be temporary and be revegetated with native riparian species
General Conditions
4 Unless otherwise approved in this certification placement of culverts and other structures in open waters and
streams shall be placed below the elevation of the streambed by one foot for all culverts with a diameter
greater than 48 inches and 20 percent of the culvert diameter for culverts having a diameter less than 48
inches to allow low flow passage of water and aquatic life Design and placement of culverts and other
structures including temporary erosion control measures shall not be conducted in a manner that may result in
dis equilibrium of wetlands or streambeds or banks adjacent to or upstream and down stream of the above
structures The applicant is required to provide evidence that the equilibrium is being maintained if requested
in writing by NCDWQ If this condition is unable to be met due to bedrock or other limiting features
encountered during construction please contact NCDWQ for guidance on how to proceed and to determine
whether or not a permit modification will be required
5 If concrete is used during construction a dry work area shall be maintained to prevent direct contact
between curing concrete and stream water Water that inadvertently contacts uncured concrete shall not be
discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills
6 During the construction of the project no staging of equipment of any kind is permitted in waters of the
U S or protected riparian buffers
7 The dimension pattern and profile of the stream above and below the crossing shall not be modified
Disturbed floodplains and streams shall be restored to natural geomorphic conditions
8 The use of rip rap above the Normal High Water Mark shall be minimized Any rip rap placed for stream
stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life
passage
9 The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings
submitted for approval
10 All work in or adjacent to stream waters shall be conducted in a dry work area Approved BMP measures
from the most current version of NCDOT Construction and Maintenance Activities manual such as
sandbags rock berms cofferdams and other diversion structures shall be used to prevent excavation in
flowing water
11 Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize
sedimentation and reduce the introduction of other pollutants into the stream
12 All mechanized equipment operated near surface waters must be regularly inspected and maintained to
prevent contamination of stream waters from fuels lubricants hydraulic fluids or other toxic materials
13 No rock sand or other materials shall be dredged from the stream channel except where authorized by this
certification
14 Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface z
waters is prohibited
15 The permittee and its authorized agents shall conduct its activities in a manner consistent with State water
quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water
Act) and any other appropriate requirements of State and Federal law If NCDWQ determines that such
standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State
or federal law is being violated or that further conditions are necessary to assure compliance NCDWQ may
reevaluate and modify this certification
16 All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3 1 unless otherwise
authorized by this certification
17 A copy of this Water Quality Certification shall be maintained on the construction site at all times In
addition the Water Quality Certification and all subsequent modifications if any shall be maintained with
the Division Engineer and the on site project manager
18 The outside buffer wetland or water boundary located within the construction corridor approved by this
authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities Impacts
to areas within the fencing are prohibited unless otherwise authorized by this certification
19 The issuance of this certification does not exempt the Permittee from complying with any and all statutes
rules regulations or ordinances that may be imposed by other government agencies (i a local state and
federal) having jurisdiction including but not limited to applicable buffer rules stormwater management
rules soil erosion and sedimentation control requirements etc
20 The Permittee shall report any violations of this certification to the Division of Water Quality within 24 hours
of discovery
21 Upon completion of the project (including any impacts at associated borrow or waste sites) the NCDOT
Division Engineer shall complete and return the enclosed Certification of Completion Form to notify
NCDWQ when all work included in the 401 Certification has been completed
22 Native riparian vegetation must be reestablished in the riparian areas within the construction limits of the
protect by the end of the growing season following completion of construction
23 There shall be no excavation from or waste disposal into jurisdictional wetlands or waters associated with
this permit without appropriate modification Should waste or borrow sites or access roads to waste or
borrow sites be located in wetlands or streams compensatory mitigation will be required since that is a direct
impact from road construction activities
24 Erosion and sediment control practices must be in full compliance with all specifications governing the
proper design installation and operation and maintenance of such Best Management Practices in order to
protect surface waters standards
a The erosion and sediment control measures for the project must be designed installed operated and
maintained in accordance with the most recent version of the North Carolina Sediment and Erosion
Control Planning and Design Manual
The design installation operation and maintenance of the sediment and erosion control measures
must be such that they equal or exceed the requirements specified in the most recent version of the
North Carolina Sediment and Erosion Control Manual The devices shall be maintained on all `
constiuction sites borrow sites and waste pile (spoil) projects including contractoi owned or leased
borrow pits associated with the project i
For borrow pit sites the erosion and sediment control measures must be designed installed operated
and maintained in accordance with the most recent version of the North Carolina Surface Mining
4
Manual E `
The reclamation measures and implementation must comply with the reclamation in accordance with
the requirements of the Sedimentation Pollution Control Act
25 Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved
by this Certification r
If you wish to contest any statement in the attached Certification you must file a petition for an administrative
hearing You may obtain the petition form from the office of Administrative hearings You must file the petition
with the office of Administrative Hearings within sixty (60) days of receipt of this notice A petition is considered
filed when it is received in the office of Administrative Hearings during normal office hours The Office of
Administrative Hearings accepts filings Monday through Friday between the hours of 8 OOam and 5 OOpm except
for official state holidays The original and one (1) copy of the petition must be filed with the Office of
Administrative Hearings
The petition may be faxed provided the original and one copy of the document is received by the Office of
Administrative Hearings within five (5) business days following the faxed transmission
The mailing address for the Office of Administrative Hearings is
Office of Administrative Hearings
6714 Mail Service Center
Raleigh NC 27699 6714
Telephone (919) 733 2698 Facsimile (919) 733 3478
A copy of the petition must also be served on DENR as follows
Mr William Cary General Counsel
Department of Environment and Natural Resources
1601 Mail Service Center
Raleigh NC 27699 1601
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act If you
have any questions please contact Mason Herndon at (910) 308 4021 or mason hemdon @ncdenr gov
Sincerely
A
Charles Wakild
Director
ec Art King Division 6 Environmental Officer
Ronnie Smith US Army Corps of Engineers Wilmington Field Office
Gary Jordan US Fish and Wildlife Service
Travis Wilson NC Wildlife Resources Commission
Sonia Carrillo NCDWQ Central Office
File Copy
NCDWQ Protect No
Applicant
Protect Name
Date of Issuance of 401 Water Quality Certification
County
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules and
any subsequent modifications the applicant is required to return this certificate to the 401 Transportation Permitting
Unit North Carolina Division of Water Quality 1650 Mail Service Center Raleigh NC 27699 1650 This form
may be returned to NCDWQ by the applicant the applicant s authorized agent or the protect engineer It is not
necessary to send certificates from all of these
Applicant's Certification `
I hereby state that to the best of my abilities due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plans and
specifications and other supporting materials
Signature
Date
Agent s Certification
I hereby state that to the best of my abilities due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plans and
specifications and other supporting materials
Signature
Engineer's Certification
Date
Partial Final
I as a duly registered Professional Engineer in the State of North
Carolina having been authorized to observe (periodically weekly full time) the construction of the project for the
Permittee hereby state that to the best of my abilities due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules the approved plans and specifications and other supporting materials
Signature Registration No
Date