HomeMy WebLinkAbout20120620 Ver 1_401 Application_20120612@McGifl
A S S O C I A T E S
June 20 2012
NC DWQ, 401/ Wetlands Unit
1650 Mail Service Center
Raleigh North Carolina 27699 1650
To Whom It May Concern
20120620
RE Henderson Water Reclamation Facility
Vance County North Carolina
I am enclosing the following items for review and approval for the subject project
➢ Five (5) Copies of the PCN
➢ Two (2) (24 x 36 ) Copies of the General Civil and Detail sections of the Proposed
Plan
➢ Three (3) (11 x 17 ) Copies of the General Civil and Detail sections of the
Proposed Plan
➢ One (1) Copies of USGS Map and Location Map
➢ Check Number 63340 in the amount of $240 00
If you have any comments or questions regarding this submission please do not hesitate to
call me at (828) 328 2024
Sincerely
aATES P A FFMAN PE CPESC
Senior Project Engineer
GRH 12 kip �
cc Mr A Ray Gnffin Jr City Manager v
Mr Frank Frazier Assistant City Manager JUN 2 1 2012
Mr Tom Spain Water Reclamation Director
Mr James Lastmger US Army Corps of Engineers w &�'�� k rry
Mr Andy Lovingood PE McGill Associates
Mr Doug Chapman, PE McGill Associates
File
F\2012 PROJECTS \12 01100 CITY OF HENDERSON
Letter 2012 06 20 doc
n g • P l a n n i n g . 1
P O Bov 1136 Hicbort NC 28603 1240 19th St Lane Hiebai t
Office 828 378 20 4 Far V8 328 3870
/
WRF Improvements \02_Design Phase\Reports\Permit PCN\DWQTransmittal
E n g I n e e r i
McGill Associates PA
n a n c e
NC X8601
`O�OF W AT F9QG
�' r
O T
20120620
Office Use Only
Corps action ID no
DWQ project no
Form Version 1 3 Dec 10 2008
Page 1 of 11
PCN Form — Version 1 3 December 10 2008 Version
Pre - Construction Notification PC Form
rZ
A Applicant Information
1
Processing
la
Type(s) of approval sought from the
Corps
®Section 404 Permit ❑Section 10 Permit
1b Specify Nationwide Permit (NWP) number 12 or General Permit (GP) number
1 c
Has the NWP or GP number been verified by the Corps?
❑ Yes
® No
1 d
Type(s) of approval sought from the DWQ (check all that apply)
® 401 Water Quality Certification — Regular ❑ Non 404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ 401
Certification
❑ Yes ® No
For the record only for Corps Permit
❑ Yes ® No
1f
Is payment into a mitigation bank or in lieu fee program proposed for mitigation
of impacts? If so attach the acceptance letter from mitigation bank or in lieu
fee program
❑ Yes
N No
1g
Is the project located in any of NC s twenty coastal counties If yes answer 1 h
below
❑ Yes
® No
1h
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes
® No
2
Project Information
2a
Name of project
Henderson Water Reclamation Facility Improvements
2b
County
Vance
2c
Nearest municipality / town
City of Henderson
2d
Subdivision name
n/a
2e
NCDOT only T I P or state
project no
n/a
3
Owner Information
3a
Name(s) on Recorded Deed
City of Henderson
3b
Deed Book and Page No
Book 540 Page 0357
3c
Responsible Party (for LLC if
applicable)
JUN
2 1
3d
Street address
PO Box 1434
3e
City state zip
Henderson North Carolina
3f
Telephone no
(252) 430 5700
3g
Fax no
3h
Email address
ffrazier @ci henderson nc us
Page 1 of 11
PCN Form — Version 1 3 December 10 2008 Version
4
Applicant Information (if different from owner)
4a
Applicant is
❑ Agent ❑ Other specify
4b
Name
4c
Business name
(if applicable)
4d
Street address
4e
City state zip
4f
Telephone no
4g
Fax no
4h
Email address
5
Agent/Consultant Information (if applicable)
5a
Name
Doug Chapman PE
5b
Business name
(d applicable)
McGill Associates P A
5c
Street address
124019` Street Lane NW
5d
City state zip
Hickory North Carolina 28601
5e
Telephone no
(828) 328 2024
5f
Fax no
(828) 328 3870
5g
Email address
doug Chapman @mcgillengineers com
Page 2 of 11
PCN Form — Version 13 December 10 2008 Version
B Project Information and Prior Project History
1 Property Identification
1a Property identification no (tax PIN or parcel ID)
0210 01009
1 b Site coordinates (in decimal degrees)
Latitude 36 3262 Longitude 784137
(DD DDDDDD) (DD DDDDDD)
1 c Property size
2103 acres
2 Surface Waters
2a Name of nearest body of water (stream river etc ) to
Nutbush Creek
proposed project
2b Water Quality Classification of nearest receiving water
Impaned Waters C (Aquatic Life Secondary Recreation
Fresh Water)
2c River basin
Roanoke
3 Project Description
3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application
The site is currently used as a wastewater treatment facility
3b List the total estimated acreage of all existing wetlands on the property
000
3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property
1920
3d Explain the purpose of the proposed project
The project will replace four processing steps currently in use with a new oxidation ditch system
3e Describe the overall project in detail including the type of equipment to be used
The project will involve the removal and/ or abandonment of various structures and underground pipes The project will
involve the construction of various structures including but not limited to an oxidation ditch settling tanks lift stations and
office facilities The project will also involve the construction of underground gravity and pressure lines Equipment used
will include typical excavation equipment
4 Jurisdictional Determinations
4a Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
0 Yes ❑ No ® Unknown
project (including all prior phases) in the past?
Comments
0 If the Corps made the jurisdictional determination what type
Preliminary ❑ Final
of determination was made?
4c If yes who delineated the jurisdictional areas?
Agency /Consultant Company
Name (if known)
I Other
4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation
5 Project History
5a Have permits or certifications been requested or obtained for
0 Yes ❑ No ® Unknown
this project (including all prior phases) in the past?
5b If yes explain in detail according to help file instructions
Page 3 of 11
PCN Form — Version 13 December 10 2008 Version
6 Future Project Plans
6a Is this a phased project? ❑ Yes ® No
6b If yes explain
Page 4 of 11
PCN Form — Version 13 December 10 2008 Version
C Proposed Impacts Inventory
1 Impacts Summary
la Which sections were completed below for your project (check all that apply)
❑ Wetlands ® Streams tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2 Wetland Impacts
If there are wetland impacts proposed on the site then complete this question for each wetland area impacted
2a
2b
2c
2d
2e
2f
Wetland impact
Type of jurisdiction
number —
Type of impact
Type of wetland
Forested
(Corps 404 10
Area of impact
Permanent (P) or
(if known)
DWQ — non404 other)
(acres)
Temporary
W1 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W2 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W3 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W4 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W5 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W6 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
2g Total wetland impacts
2h Comments
3 Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this
question for all stream sites impacted
3a
3b
3c
3d
3e
3f
3g
Stream impact
Type of impact
Stream name
Perennial
Type of jurisdiction
Average
Impact
number
(PER) or
(Corps 404 10
stream
length
Permanent (P) or
intermittent
DWQ — non404
width
(linear
Temporary M
(INT)?
other)
(feet)
feet)
S1 ❑ P ®T
Excavation
UT Nutbush
® PER
❑ INT
® Corps
❑ DWQ
5
15
S2 ❑ P ®T
Excavation
UT Nutbush
® PER
❑ INT
® Corps
❑ DWQ
13
15
S3 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S4 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S5 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S6 ❑ POT
❑ PER
❑ Corps
❑ INT
❑ DWQ
3h Total stream and tributary impacts
30
31 Comments
Page 5 of 11
PCN Form — Version 13 December 10 2008 Version
4 Open Wafer impacts
If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of
the U S then indt ualiy list all open water impacts below
4a
4b
4c
4d
4e
Open water
Name of waterbody
impact number —
(if applicable)
Type of impact
Waterbody type
Area of impact (acres)
Permanent (P) or
Temporary
01 ❑ PEI T
02 ❑P ❑T
03 ❑ PEI T
04 ❑P ❑T
4f Total open water impacts
4g Comments
5 Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below
5a
5b
5c
5d
5e
Wetland Impacts (acres)
Stream Impacts (feet)
Upland
Pond ID
Proposed use or purpose
(acres)
number
of pond
Flooded
Filled
Excavated
Flooded
Filled
Excavated
Flooded
P1
P2
5f Total
5g Comments
5h Is a dam high hazard permit required?
❑ Yes ❑ No if yes permit ID no
51 Expected pond surface area (acres)
5l Size of pond watershed (acres)
5k Method of construction
6 Buffer Impacts (for DWQ)
If project will impact a protected npanan buffer then complete the chart below If yes then individually list all buffer impacts
below If any impacts require mitigation then you MUST fill out Section D of this form
6a
❑ Neuse ❑ Tar Pamlico ❑ Other
Project is in which protected basin?
❑ Catawba ❑ Randleman
6b
6c
6d
6e
6f
6g
Buffer impact
number —
Reason
Buffer
Zone 1 impact
Zone 2 impact
Permanent (P) or
for
Stream name
mitigation
(square feet)
(square feet)
Temporary
impact
required?
B1 ❑P ❑T
El Yes
❑ No
B2 ❑P
El Yes
❑ No
B3 ❑P
❑Yes
❑ No
6h Total buffer impacts
61 Comments
Page 6 of 11
PCN Form — Version 13 December 10 2008 Version
D Impact Jusbficabon and Mitigation
1 Avoidance and Minimization
la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project
The proposed crossings are at a near 90 degree angle to the stream to limit the amount of impacts
1b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques
The stream will be bypassed around the trench during construction and the stream will be returned to its existing contours
2 Compensatory Mibgabon for Impacts to Waters of the U S or Waters of the State
2a Does the project require Compensatory Mitigation for
impacts to Waters of the U S or Waters of the State?
❑ Yes ® No
2b If yes mitigation is required by (check all that apply)
❑ DWQ ❑ Corps
2c If yes which mitigation option will be used for this
project?
❑ Mitigation bank
❑ Payment to in lieu fee program
❑ Permittee Responsible Mitigation
3 Complete if Using a Mitigation Bank
3a Name of Mitigation Bank
3b Credits Purchased (attach receipt and letter)
Type
Quantity
3c Comments
4 Complete if Making a Payment to In lieu Fee Program
4a Approval letter from in lieu fee program is attached
❑ Yes
4b Stream mitigation requested
linear feet
4c If using stream mitigation stream temperature
❑ warm ❑ cool []cold
4d Buffer mitigation requested (DWQ only)
square feet
4e Riparian wetland mitigation requested
acres
4f Non riparian wetland mitigation requested
acres
4g Coastal (tidal) wetland mitigation requested
acres
4h Comments
5 Complete if Using a Permittee Responsible Mitigation Plan
[5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan
Page 7 of 11
PCN Form — Version 13 December 10 2008 Version
6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation?
❑ Yes ® No
6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the
amount of mitigation required
Zone
6c
Reason for impact
6d
Total impact
(square feet)
Multiplier
6e
Required mitigation
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
15
6f Total buffer mitigation required
6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank
permittee responsible riparian buffer restoration payment into an approved in lieu fee fund)
6h Comments
Page 8of11
PCN Form — Version 13 December 10 2008 Version
E
Stormwater Management and Diffuse Flow Plan (required by DWQ)
1
Diffuse Flow Plan
1a
Does the project include or is it adjacent to protected riparian buffers identified
❑ Yes ® No
within one of the NC Riparian Buffer Protection Rules?
1 b
If yes then is a diffuse flow plan included? If no explain why
❑ Yes ❑ No
Comments
2
Stormwater Management Plan
2a
What is the overall percent imperviousness of this project?
18%
2b
Does this project require a Stormwater Management Plan?
❑ Yes ® No
2c
If this project DOES NOT require a Stormwater Management Plan explain why The project does not meet the high
density threshold
2d
If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan
❑ Certified Local Government
2e
Who will be responsible for the review of the Stormwater Management Plan?
❑ DWQ Stormwater Program
❑ DWQ 401 Unit
3
Certified Local Government Stormwater Review
3a
in which local government s jurisdiction is this project?
n/a
❑ Phase II
3b
Which of the following locally implemented stormwater management programs
❑ NSW
❑ USMP
apply (check all that apply)
❑ Water Supply Watershed
❑ Other
3c Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ❑ No
attached?
4
DWQ Stormwater Program Review
❑ Coastal counties
❑ HOW
4a
Which of the following state - implemented stormwater management programs apply
[] ORW
(check all that apply)
❑ Session Law 2006 -246
❑ Other
4b
Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ❑ No
attached?
5
DWQ 401 Unit Stormwater Review
5a
Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 9 of 11
PCN Form — Version 13 December 10 2008 Version
F
Supplementary Information
1
Environmental Documentation (DWQ Requirement)
la
Does the project involve an expenditure of public (federal /state/local) funds or the
® Yes
❑ No
use of public (federal /state) land?
lb
If you answered yes to the above does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ Yes
® No
(North Carolina) Environmental Policy Act (NEPA/SEPA)*?
1 c
If you answered "yes to the above has the document review been finalized by the
State Clearing House? (If so attach a copy of the NEPA or SEPA final approval
❑ Yes
❑ No
letter )
Comments
2
Violations (DWQ Requirement)
2a
is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated
Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards
❑ Yes
® No
or Riparian Buffer Rules (15A NCAC 2B 0200)?
2b
Is this an after the -fact permit application?
❑ Yes
® No
2c
if you answered "yes to one or both of the above questions provide an explanation of the violation(s)
3
Cumulative Impacts (DWQ Requirement)
3a
Will this project (based on past and reasonably anticipated future impacts) result in
n Yes
® No
additional development which could impact nearby downstream water quality?
3b
If you answered "yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy If you answered no provide a short narrative description
4
Sewage Disposal (DWQ Requirement)
4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from
the proposed project or available capacity of the subject facility
The project involves improvements to the existing water reclamation facility for the City of Henderson
The plant will
remain operational throughout construction and all wastewater generated from the proposed project will be treated on site
Page 10 of 11
PCN Form — Version 13 December 10 2008 Version
5 Endangered Species and Designated Critical Habitat (Corps Requirement)
5a Will this project occur in or near an area with federally protected species or
® Yes ❑ No
habitat?
5b Have you checked with the USFWS concerning Endangered Species Act
❑ Yes ® No
impacts?
El Raleigh
5c If yes indicate the USFWS Field Office you have contacted
❑ Asheville
5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
http Uwww fws gov /nc es/es /countyfr html
6 Essential Fish Habitat (Corps Requirement)
6a Will this project occur in or near an area designated as essential fish habitat?
❑ Yes ® No
6b What data sources did you use to determine whether your site would impact Essential Fish Habitat?
http //ocean floridamanne org /efh_coraVims /viewer htm
7 Historic or Prehistoric Cultural Resources (Corps Requirement)
7a Will this project occur in or near an area that the state federal or tribal
governments have designated as having historic or cultural preservation
❑ Yes ® No
status (e g National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b What data sources did you use to determine whether your site would impact historic or archeological resources?
http / /gis ncdcr gov/hpoweb/
8 Flood Zone Designation (Corps Requirement)
8a Will this project occur in a FEMA- designated 100 -year floodplain?
® Yes ❑ No
8b If yes explain how project meets FEMA requirements No fill will occur within a designated floodway
8c What source(s) did you use to make the floodplain determination? www floodmapsnc gov
Frank Frazier,
Assistant City Manager
At"O ¢
tt-2—
ApplicanttAgen Signature
Date
Applicant/Agent s Printed Name
g
(Agent's signature is valid only if an authorization letter from the applicant
is provided j
Page 1 l of 11
PCN Form — Version 13 December 10 2008 Version
W—Ar
US/�� U S DEPARTMENT OF THE INTERIOR I" ,d. np HENDERERSONQUADRANGLE
� � U S GEOLOGICAL 40v US Topo 75-MlK TESERIES
w
P, d&..d by dr U ad S . Gadbo..l Surrey SCALE 124 000
wm,N.�w. wm. ea dupe
uana c.m.m s.ne. Sea pycse. wq.ne. m imun
oow.. ua. aw c...aw sww. aes
om :am xm 9m ® mm
n« ozmcso a.w
WdAwWM Ii.tl
WHO-,. W OIfIH �4 uG N1�CPL O, IiM aF e9
cWd.. .u. M-.. Dm
-W
.ow w.w
naoww puoneovs
w
°N
7
n0 uss� cn
immmr w. sum x..r
is nao i.w D..a
� wD
• �u.xd. 0
HENDERSON NC
2010
12 Lg 016
JUN 2 1 2012
DENR WATER QUAUTY