Loading...
HomeMy WebLinkAboutNCG110102_Inspection Report_20210225ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director City of Marion Attention: Tim Horton Post Office Drawer 700 Marion, North Carolina 28752 NORTH CAROLINA Environmental Quality February 25, 2021 Subject: Compliance Evaluation Inspection Corpening Creek WWTP Permit: NCG110000 Certificate of Coverage: NCG110102 McDowell County, North Carolina Dear Mr. Horton: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on February 19, 2021. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sinc y, Isaiah Reed, EI, CPSWQ MS4C CI Environmental Specialist Land Quality Section Enclosure: Inspection Report D. �2� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 US. Highway 70 1 Swannnnoa, North Carolina 28778 oaTM wn rounneme uxnnm.,,wa,mm� /�`, 828.296.4500 Compliance Inspection Report Permit:NCG110102 Effective: 06/01/18 Expiration: 05/31/23 Owner: CityofMarion SOC: Effective: Expiration: Facility: Corpening Creek WWTP County: McDowell 3982 NC Hwy 226 S Region: Asheville Marion NC 28752 Contact Person: J Robert Boyette Title: City Manager Phone: 828-652-3551 Directions to Facility: From ARO: Take 1-40 east to Exit 86 in Marion. Turn left onto Hwy. 226. Turn right onto College Drive (SR 1819), Disposal Unit is located approximately 1/2 mile on left after crossing RR tracks. System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 02/19/2021 Entry Time 09:15AM Exit Time: 10:15AM Primary Inspector: Isaiah L Reed Phone: 828-296-4614 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Municipal WWTP > 1MGD, Stormwater Discharge, COC Facility Status: 0 Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG110102 Owner -Facility: City of Marion Inspection Date: 02/19/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: On February 19, 2021 this facility was inspected for compliance. I met with Tim Horton on site. No major issues were observed during the inspection. However, it is recommended that a comprehensive Stormwater Pollution Prevention Pan review be performed to ensure that all elements of the Stormwater Pollution Prevention Plan are up-to-date and accurate. If you have any questions, please contact this office at (828) 296-4614. Page 2 of 3 permit: NCG110102 Owner- Facility: City of Marion Inspection Date: 02/19/2021 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ At Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? N ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ E ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3