Loading...
HomeMy WebLinkAbout20190230 Ver 4_Modification Request Attachment_20210224 (2)HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural SiteStationStructureFill In Fill In in Clearing in SW SW Impacts Impacts StreamNo.(From/To)Size / TypeWetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)1 -L- 34+78 to 42+09 36" RCP-III / Roadway Fill 0.380.01 < 0.01 121 102 -L- 81+96 to 85+94 Triple 9 X 9 RCBC / Roadway Fill 0.030.01 0.030.14 0.01 226 353 -L- 92+72 to 96+17Roadway Fill0.17 0.09 < 0.014 -L- 138+79 to 144+44 42" RCP-III / Roadway Fill 2.100.280.01 < 0.01 252 215 -L- 186+64 to 194+68Roadway Fill3.330.170.256 -L- 201+68 to 205+06 Double 48" RCP-III / Roadway Fill 3.370.08 0.120.09 < 0.01 826 97 -L- 248+36 to 251+62 84" RCP-IV / Roadway Fill 1.260.02 0.070.04 < 0.01 480 638 -L- 282+72 to 287+92 Triple 8 X 7 RCBC / Roadway Fill 0.180.100.11 < 0.01 362 299 -L- 381+38 to 390+97Roadway Fill0.640.1910 -L- 409+20 to 409+39Roadway Fill< 0.0111 -L- 420+24 to 421+45Roadway Fill< 0.01 < 0.0112 -L- 150+32 to 151+20 42" RCP-III / Roadway Fill0.02 < 0.01 209 20TOTALS*:11.450.260.11 1.050.43 0.03 2476 187 0Revised 2021 02 24SHEET 53OF53*Rounded totals are sum of actual impactsNOTES:Site 6 includes 0.465 acres of fill impact due to the total take of wetland within the proposed roadway loop. Site 3 includes additional 0.09 acres of temp. fill and remove 0.04 of Mechanized ClearingSite 2 includes 20 linear feet of additional channel impacts from bank stabilizationSite 8 includes 30 linear feet of additional channel impacts from bank stabilizationSite 5 includes additional 0.17 acres of temp. wetland fillWETLAND AND SURACE WATER IMPACTS SUMMARYWETLAND IMPACTSSURFACE WATER IMPACTSNC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS02/24/2021NORTHAMPTON COUNTYR-2582A34472.1.4