HomeMy WebLinkAbout20190230 Ver 4_Modification Request Attachment_20210224FSNAD 83SCALE
0'60'60'
SITE 5
WETLAND
DENOTES FILL INFF CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
SHEET 23 OF 53
PERMIT DRAWINGREVISIONS HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
16R-2582A
2/8/2019R:\Hydraulics\PERMITS_Environmental\Drawings\23_R-2582A_SITE5.dgnmeme.buscemi8/17/99 DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
-L- STA. 185+50.00CSX RAILROADWOODS
922.46'NORTH TO MILE MARKER #77EXISTING R/WEXISTING R/WWOODS
JANE F. WILLIFORD
DB 638 PG 14
JANE F. WILLIFORD
JAMES TINSLEY COLEMAN
DB 576 PG 318
LAWRENCE C. PITTMAN, JR.
ROZELIA C. PITTMAN AND
ROZELIA C. PITTMAN
DB 798 PG 493
N 26°49'03" W
100.00'
TYPE B-77
TYPE B-77
TYPE B-77
TYPE B-77
TYPE B-77190+00-Y8-15+00TYPE B-77
-L-CSX SA-LINED
TYPE B-77
F F F
F
F F F F
F
F
F
F
F
SEE DETAIL 34
LATERAL V-DITCH
EST. 7 S.Y. GEOTEXTILE FABRIC
EST. 2 TONS CLASS B RIP RAP
EST. 16 S.Y. GEOTEXTILE FABRIC
EST. 5 TONS CLASS B RIP RAP
TB 2GI
2GI
TB 2GI
STA. 191+13 -L- RT
END SBG
STA. 191+03 -L- LT
END SBG
STA. 194+22 -L- RT
BEGIN SBG
STA. 194+12 -L- LT
BEGIN SBG
SEE DETAIL 41
W/ PSRM
LATERAL V-DITCH
EST. 11 S.Y. GEOTEXTILE FABRIC
EST. 3 TONS CLASS B RIP RAP30" RCP CONTRACTOR DESIGN24" RCP CONTRACTOR DESIGNFROM -Y9- STA. 31+44 LT TO -Y9- STA. 35+00 LT
FROM -Y9- STA. 31+05 RT TO -Y9- STA. 34+35 RTFROM -Y9- STA. 26+47 RT TO -Y9- STA. 29+86 RTFROM -Y9- STA. 22+00 RT TO -Y9LPD- STA. 11+20 RTFROM -Y9- STA. 13+00 RT TO -Y9- STA. 17+35 RTFROM -Y9LPD- STA. 14+20 RT TO -Y9LPD- STA. 15+00 RTFROM -L- STA. 204+30 RT TO -L- STA. 209+50 RTFROM -Y9RPA- STA. 29+00 RT TO -Y9RPA- STA. 30+50 RTFROM -Y9LPA- STA. 16+50 LT TO -Y9LPA- STA. 17+71 LT
DETAIL 34
SEE
V-DITCH
LATERAL
ELB
ELBOWS ELB15" RCP-III 15" RCP-III 18" CSPF
F
F
F F
F F F F
F
F
F
F
F
F
F
F
F
F