Loading...
HomeMy WebLinkAbout20190230 Ver 4_Modification Request Attachment_20210224FSNAD 83SCALE 0'60'60' SITE 5 WETLAND DENOTES FILL INFF CLEARING DENOTES MECHANIZED* * * * ** * ** * * SHEET 23 OF 53 PERMIT DRAWINGREVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 16R-2582A 2/8/2019R:\Hydraulics\PERMITS_Environmental\Drawings\23_R-2582A_SITE5.dgnmeme.buscemi8/17/99 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION -L- STA. 185+50.00CSX RAILROADWOODS 922.46'NORTH TO MILE MARKER #77EXISTING R/WEXISTING R/WWOODS JANE F. WILLIFORD DB 638 PG 14 JANE F. WILLIFORD JAMES TINSLEY COLEMAN DB 576 PG 318 LAWRENCE C. PITTMAN, JR. ROZELIA C. PITTMAN AND ROZELIA C. PITTMAN DB 798 PG 493 N 26°49'03" W 100.00' TYPE B-77 TYPE B-77 TYPE B-77 TYPE B-77 TYPE B-77190+00-Y8-15+00TYPE B-77 -L-CSX SA-LINED TYPE B-77 F F F F F F F F F F F F F SEE DETAIL 34 LATERAL V-DITCH EST. 7 S.Y. GEOTEXTILE FABRIC EST. 2 TONS CLASS B RIP RAP EST. 16 S.Y. GEOTEXTILE FABRIC EST. 5 TONS CLASS B RIP RAP TB 2GI 2GI TB 2GI STA. 191+13 -L- RT END SBG STA. 191+03 -L- LT END SBG STA. 194+22 -L- RT BEGIN SBG STA. 194+12 -L- LT BEGIN SBG SEE DETAIL 41 W/ PSRM LATERAL V-DITCH EST. 11 S.Y. GEOTEXTILE FABRIC EST. 3 TONS CLASS B RIP RAP30" RCP CONTRACTOR DESIGN24" RCP CONTRACTOR DESIGNFROM -Y9- STA. 31+44 LT TO -Y9- STA. 35+00 LT FROM -Y9- STA. 31+05 RT TO -Y9- STA. 34+35 RTFROM -Y9- STA. 26+47 RT TO -Y9- STA. 29+86 RTFROM -Y9- STA. 22+00 RT TO -Y9LPD- STA. 11+20 RTFROM -Y9- STA. 13+00 RT TO -Y9- STA. 17+35 RTFROM -Y9LPD- STA. 14+20 RT TO -Y9LPD- STA. 15+00 RTFROM -L- STA. 204+30 RT TO -L- STA. 209+50 RTFROM -Y9RPA- STA. 29+00 RT TO -Y9RPA- STA. 30+50 RTFROM -Y9LPA- STA. 16+50 LT TO -Y9LPA- STA. 17+71 LT DETAIL 34 SEE V-DITCH LATERAL ELB ELBOWS ELB15" RCP-III 15" RCP-III 18" CSPF F F F F F F F F F F F F F F F F F F