Loading...
HomeMy WebLinkAboutSW5210202_Supplement Form_20210224 Permit No.______________________ (to be provided by DWQ) STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Franklin County E911 Project name Blake Hall, PE Contact person 919-866-4933 Phone number 2/12/2021 Date 1.44 acres Drainage area number II. DESIGN INFORMATION Site Characteristics 2 Drainage area1 ft 2 Impervious area, post-development1 ft % impervious42.36% Design rainfall depth1.0in Storage Volume: Non-SA Waters 3 Minimum volume required2,254 ft 3 Volume provided9,348 ft OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 3 1.5" runoff volume ft 3 Pre-development 1-yr, 24-hr runoff ft 3 Post-development 1-yr, 24-hr runoff ft 3 Minimum volume required ft 3 Volume provided ft Peak Flow Calculations Is the pre/post control of the 1yr 24hr storm peak flow required?y(Y or N) 1-yr, 24-hr rainfall depth2.9in Rational C, pre-development(unitless) Rational C, post-development(unitless) Rainfall intensity: 1-yr, 24-hr storm0.12in/hrOK 3 Pre-development 1-yr, 24-hr peak flow16.90 ft/sec 3 Post-development 1-yr, 24-hr peak flow15.23 ft/sec 3 Pre/Post 1-yr, 24-hr peak flow control-1.67 ft/sec Elevations Temporary pool elevation251.00fmsl Permanent pool elevation249.00fmsl SHWT elevation (approx. at the perm. pool elevation)fmsl Top of 10ft vegetated shelf elevation249.50fmsl Bottom of 10ft vegetated shelf elevation248.50fmsl Sediment cleanout, top elevation (bottom of pond)245.00fmsl Sediment cleanout, bottom elevation244.00fmsl Sediment storage provided1.00ft Is there additional volume stored above the state-required temp. pool?n(Y or N) Elevation of the top of the additional volume251.0fmslOK Form SW401-Wet Detention Basin-Rev.9-4/18/12Parts I. & II. Design Summary, Page 1 of 2 Permit No.______________________ (to be provided by DWQ) II. DESIGN INFORMATION Surface Areas 2 Area, temporary pool5,508ft 2 ft Area REQUIRED, permanent pool0 SA/DA ratio1.57(unitless) 2 ft Area PROVIDED, permanent pool, A 3,611OK perm_pool 2 ft Area, bottom of 10ft vegetated shelf, A 2,951 bot_shelf 2 ft Area, sediment cleanout, top elevation (bottom of pond), A 858 bot_pond Volumes 3 Volume, temporary pool9,348OK ft 3 Volume, permanent pool, V 6,389 ft perm_pool 3 Volume, forebay (sum of forebays if more than one forebay)1,007 ft Forebay % of permanent pool volume15.8%%Insufficient forebay volume. SA/DA Table Data Design TSS removal85% Coastal SA/DA Table Used?n (Y or N) Mountain/Piedmont SA/DA Table Used?y (Y or N) SA/DA ratio1.57(unitless) Average depth (used in SA/DA table): Calculation option 1 used? (See Figure 10-2b)n (Y or N) 3 ft Volume, permanent pool, V 6,389 perm_pool 2 ft Area provided, permanent pool, A 3,611 perm_pool Average depth calculatedftNeed 3 ft min. Average depth used in SA/DA, d, (Round to nearest 0.5ft) ft av Calculation option 2 used? (See Figure 10-2b)y (Y or N) 2 ft Area provided, permanent pool, A 3,611 perm_pool 2 ft Area, bottom of 10ft vegetated shelf, A 2,951 bot_shelf 2 Area, sediment cleanout, top elevation (bottom of pond), A 858 ft bot_pond "Depth" (distance b/w bottom of 10ft shelf and top of sediment)3.50ft Average depth calculated3.01ftOK Average depth used in SA/DA, d, (Round to down to nearest 0.5ft) 3.0ftOK av Drawdown Calculations Drawdown through orifice?y(Y or N) Diameter of orifice (if circular)1.00in 2 Area of orifice (if-non-circular) in Coefficient of discharge (C) 0.60(unitless) D Driving head (H) 0.52ft o Drawdown through weir?n(Y or N) Weir type(unitless) Coefficient of discharge (C) (unitless) w Length of weir (L)ft Driving head (H)ft 3 Pre-development 1-yr, 24-hr peak flow16.90 ft/sec 3 Post-development 1-yr, 24-hr peak flow15.23 ft/sec 3 Storage volume discharge rate (through discharge orifice or weir)0.08 ft/sec OK, draws down in 2-5 days. Storage volume drawdown time2.40days Additional Information Vegetated side slopes6:1OK Vegetated shelf slope6:1Insufficient shelf slope. Vegetated shelf width6.0ftInsufficient shelf length. Length of flowpath to width ratio2:1Insufficient flow path to width ratio. Must not short-circuit pond. Length to width ratio1.8:1OK Trash rack for overflow & orifice?y(Y or N)OK Freeboard provided1.0ftOK Vegetated filter provided?y(Y or N)OK Recorded drainage easement provided?y(Y or N)OK Capures all runoff at ultimate build-out?y(Y or N)OK gravity w/ valve Drain mechanism for maintenance or emergencies is: Form SW401-Wet Detention Basin-Rev.9-4/18/12Parts I. & II. Design Summary, Page 2 of 2