HomeMy WebLinkAbout20210145 Ver 1_Pre-Filing Meeting Request_20210125 tie R•.'.
DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnYlmnal2nlrtl Qua fay
ID#* 20210145 Version* 1
Regional Office* Mooresville Regional Office-(704)663-1699
Reviewer List* Donna Hood
Pre-Filing Meeting Request submitted 1/25/2021
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Larry Thompson
Contact Email Address* Ihompson@ncdot.gov
Project Name* Replace Bridge No.329 on SR 1315 over East Fork Twelve Mile Creek
Project Owner* NCDOT Highway Division 10
Project County* Union
Owner Address: Street Address
716 W Main Street
Address Line 2
City State/Rovince/Region
Albemarle NC
Fbstal/Zip Code Country
28001 USA
Is this a transportation project?* r Yes r No
Type(s)of approval sought from the DWR:
rJ 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
I— Individual Permit I— Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Donna Hood
Please give a brief project description below.*
NCDOT proposes to replace the existing functionally deficient bridge
on SR 1315(New Town Rd)at East Fork Twelve Mile Creek with an
improved bridge. STV Engineers is providing planning,design and
Section 404/401 services on behalf of Division 10;a MCDC has been
prepared; a delineation of waters of the U.S. has been completed-
jurisdictional waters of the U.S.within the study area include East
Fork Twelve Mile Creek, an unnamed tributary,and three wetlands;a
NRTR was prepared by Rummel Klepper and Kahl, LLP.The
proposed bridge replacement will include an approximate 0.9-mile
offsite detour;the project has a Let date of September 17, 2021.
Please give a couple of dates you are available for a meeting.
2/1/2021
2/2/2021
2/3/2021
2/4/2021
2/5/2021
Please attach the documentation you would like to have the meeting about.
R141 Figure 3 waters map.pdf 1.82MB
R141 Figure 1 USGS map.pdf 2.2MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
a' »rlTr.fir a+"or
Submittal Date 1/25/2021