Loading...
HomeMy WebLinkAbout20120604 Ver 1_401 Application_2012061220 4 North Carolina Department of Environment and Natural Resources Dnnslion of Water Quality Beverly Eaves Perdue Charles Waklld P E Dee Freeman Governor Director Secretary Apn123 2012 Mr David Benenhaley 9216 Black Road Midland NC 28107 Subject Unapproved In Stream Ponds 9216 Black Road Union County NC Dear Mr Benenhaley On April I e your letter was received by this office regarding the ponds at the subject site We have reviewed the letter and the explanation for the pond construction The issue has been discussed with the Army Corps of Engineers (COE) as to how the situation may be rectified Based on our discussion the following is required • The lower secondary pond will need to be removed and the stream channel restored to its original state Once the dam has been breached to allow free flow of the stream we can give guidance as to what needs to be done to restore the channel Care must be taken when breaching the dam to prevent sediment/dirt from Impacting downstream • The larger pond can remain However this pond will have to be permitted The Impacts associated with the upper pond are approximately 375 linear feet The COE will determine If mitigation is required for the impacts associated with the upper pond A PCN form (application) has been enclosed for you to complete and submit to the COE It has been partially completed for your convenience Areas highlighted in yellow will need to be filled out • As discussed at the site during the initial site visit we understand that there have been issues with the driveway /stream crossing /dam The dam / dnveway must be constructed to properly function and to maintain stability s an ted that the applica J n to the CO a submitted no later than June 15 2012 Please provide a to this O if you have any o qu es ou a application please see the following link httn &noct rncdenr oro /webANQ /swD/ws /401 /certsandoermits/aDD iv If you have any other questions about the application or other matters please contact me at 704 235 2200 Sincerely Alan Johnson Env Sr Specialis cc Shelton Sullivan Compliance Enforcement Mooresville Regional Office Location 610 East Center Avenue Suite 301 Mooresville NC 28115 '(e Phone ( 704) 663- 16991Fax. (704) 663-60401 Customer Service 1-877- 623 -6748 1 `o) fC�as+iO ,,�a Internet httpJ /portal ncdenr org/wet�Mrq rl�L f ziL An Equal Opportunity /Affirmative Action Employer — 50% Recycted/10% Post Consumer Pacer y C5 a 2 ®120604 Office Use Only Corps action ID no DWQ project no Form Version 13 Dec 10 2008 C O e a Page 1 of 10 PCN Form — Version 13 December 10 2008 Version Pre - Construction Notification C Form 1 A Appheant Information Processing 1 a Type(s) of approval sought from the Corps I VA,/ecbon 404 Permit ❑ Section 10 Permit ea 1 b Specify Nationwide Permit (NWP) number or General Permit (GP) number 1 c Has the NWP or GP number been venfied by the Corps? ❑ Yes No 1,o,-TO (s) of approval sought from the DWQ (check all that apply) ❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Cerbficabon — Express ❑ Riparian Buffer Authorization le Is this notificabon solely for the record because written approval is not required? Se KS, co r" vo na` i For the record only for DWQ 401 Certificabon 9es ❑ No For the record only for Corps Permit ❑ Yes ❑ No If Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program ,S Q di, V— O E ❑ Yes ❑ No 1g Is the project located in any of NC s twenty coastal counties If yes answer 1 h below ❑ Yes ;311 1 h Is the project located within a NC DCM Area of Environmental Corcern (AEC)" ❑ Yes �o 2 ftWectinformation 2a Name of project 2b County Union 2c Nearest municipality / town r 2d Subdivision name 2e NCDOT only T I P or state project no 3 Owner Information 3a Name(s) on Recorded Deed it n 3b Deed Book and Page No 3c Responsible Party (for LLC if applicable) II 3d Street address 3e City state zip ® i J 3f Telephone no ij 515- 3 i B 2171? 1511 % 3g Fax no 3h Email address CLOIIC()ry\ t N-Q / C O e a Page 1 of 10 PCN Form — Version 13 December 10 2008 Version i J i 1 f � , F tt S Y� 4 licant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other specify 4b Name 4c Business name (if applicable) 4d Street address 4e City state zip 4f Telephone no 4g Fax no 4h Email address 5 nt/Consultant Information (if applicable) -15a Name 5b Business name (if applicable) 5c Street address 5d City state zip 5e Telephone no 5f Fax no 5g Email address Page 2 of 10 PCN Form — Version 13 December 10 2008 Version B Project Information and Prior Project History 1 Property Identification la Property identification no (tax PIN or parcel ID) 1 b Site coordinates (in decimal degrees) Latitude Longitude (DD DDDDDD) ( DD DDDDDD) 1c Property size acres 2 Surface Waters 2a Name of nearest body of water (stream river etc) to proposed project 2b Water Quality Classification of nearest receiving water 2c River basin 3 Project Description 3a Describe the existing conditions on the site and the eneral land use in the vicinity of the project at the time of this application � j,� 1 �Ie%AeM-aZ Ma 1— 16)0 &' i a rz> ' 3 the total estimated acreage of all existing wetlands on the property 3c Listthe total estimated linear feet of all existing streams (intermittent and perennial) on the property 3d Explain the purpose of the proposed project 3e Describe the overall project in detail including the type of equipment to be used 4 Jurisdictional Determinations 4a Have junsdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments ❑ Yes �&No ❑ Unknown 4b if the Corps made the jurisdictional determination what type of determination was made ❑ Preliminary ry ❑ Final 4c If yes who delineated the jurisdictional areas? Name (if known) Agency /Consultant Company Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5 Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes No El Unknown 5b If yes explain in detail according to help file instructions 6 ture Project Plans 6a Is this a phased project? ❑ Yes ❑ No 6b If yes explain Page 3 of 10 PCN Form — Version 13 December 10 2008 Version C PropoVAHmpacts Inventory 1 19padsSummary Which sections were completed below for your project (check all that apply) a ❑ Wetlands ❑ Streams tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 W I e are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (if known) DWQ — non -404 other) (acres) Temporary W1 ❑ P [IT ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P [:IT ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ POT ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts 2h Comments 3- Sfem laq)acts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number Permanent (P) or (PER) or intermittent (Corps 404 10 DWQ — non -404 stream width length (linear Temporary (T) j�`1�1n e, (INT)? other) (feet) feet) S1 "' P [:1 T �° ; PER ❑ INT Corps 54 DWQ S2 M P [IT �� PER El Corps ❑ INT ❑ DWQ S3 ❑ P [:IT El PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T El PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ A Total Mnm and tributary unpacts 31 Comments Page 4 of 10 PCN Form — Version 13 December 10 2008 Version 4 r impacts =re If th proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of t U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Tem ora 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 ❑P ❑T 4f Total open water impacts 4g Comments 5 Pond e; Construction j a% and or lake construction proposed then complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream - impacts (feet) Upland Pond ID proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded FAed Excavated Flooded P1 P2 5f Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes �No If yes permit ID no 51 Expected pond surface area (acres) 5) Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts for DWQ) If pro ec impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts ow If an im acts require mitigation then you MUST fill out Section D of this form 6a ❑ Neuse ❑ Tar Pamlico ❑ Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary impact required B1 ❑P ❑T ❑Yes ❑ No 62 ❑P ❑T El Yes ❑ No B3 ❑P [IT El Yes ❑ No 6h Total buffer unpacts 61 Comments Page 5 of 10 PCN Form — Version 13 December 10 2008 Version I Or L D impact Justification and Mitigation 1 Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project 11 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques 2 _Compensatory Mdzgation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ❑ No 2b If yes mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes which mitigation option will be used for this projects ❑ Mitigation bank El Payment to in lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank ? I u (f T a u t IR JmDad_ 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comme -ts 4 Complete if Making a Payment to In41eu Fee Program Gc O s I S J.Q y 4a Approval letter from in lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan Page 6 of 10 PCN Form — Version 13 December 10 2008 Version 6 Buff gation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ❑ No 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 15 6f Total buffer mitigation required 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) 6h Comments Page 7 of 10 PCN Form —Version 13 December 10 2008 Version E Stormwate anagement and Diffuse Flow Plan (required by DWQ) 1 use Flow Plan Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ❑ Yes ❑ No 1 b If yes then is a diffuse flow plan included? If no explain why Comments ❑ Yes E] No 2 Stormwa ana ement Plan 2a is the overall percent imperviousness of this project? off, 2b Does this project require a Stormwater Management Plan? ❑ Yes ❑ No 2c if this project DOES NOT require a Stormwater Management Plan explain why 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan ❑ Cerhfied Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified al Government Stormwater Review 3a I ich local government s jurisdiction is this project? ❑ Phase II 3b Which of the following locally implemented stormwater management programs ❑ NSW apply (check all that apply) ❑ USMP ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attachedl 4 DWQSd6rmwater Program Review ❑ Coastal counties 4a Which of the following state - implemented stormwater management programs apply ❑ HQW ❑ ORW (check all that apply) ❑ Session Law 2006 -246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5 DWQ 40 nit Stormwater Review 5a Do the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8of10 PCN Form — Version 1 3 December 10 2008 Version F Supplem ,onfary Information 1 E nmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the El Yes El No use of public (federal /state) land? 1 b If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval letter) ❑ Yes ❑ No Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards [Yes ❑ No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b is this an after the fact permit application? 'Yes ❑ No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) u atnre Impacts (DWQ Requirement) �a Will this protect (based on past and reasonably anticipated future impacts) result in ❑ Yes ❑ No additional development which could impact nearby downstream water quality? 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description 4 Sewa posal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility Page 9 of 10 PCN Form — Version 1 3 December 10 2008 Version 5 gered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or habitat? ❑Yes ❑ No 5b Have you checked with the USFWS concerning Endangered Species Act impacts? ❑ Yes ❑ No 5c If yes indicate the USFWS Field Office you have contacted El Raleigh ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? W-lEssential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑ No 6b What data rces did you use to determine whether your site would impact Essential Fish Habitat? 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? ❑ Yes ❑ No 7b What data sources did you use to determine whether your site would impact historic or archeological resources? 8 d Zone Designation (Corps Requirement) Sa Will this project occur in a FEMA designated 100 year floodplain? ❑ Yes ❑ No 8b If yes explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determination? -f),� & T3epe)ho-i-eq Applicant/Agent's Printed Name Date Applicant/Agents Signature (Agent s signature is valid only d an authorization letter from the applicant is provided Page 10 of 10 PCN Form — Version 1 3 December 10 2008 Version 6 -14 -12 To NC Dept of Environment and Natural Resources Division of Water Quality RE David & Robin Benenhaley Pond In reference to the attached application This property was purchased in 2006 and there was a creek that ran through the center of the property This was flood land and marsh We constructed a dam and pond in order to get to the back of the property to build our house Durning heavy rain the run off from the dam would wash out the yard The lower pond was added to minimize the wash out of the land The use of the pond was to eliminate erosion issue Since then the pond has been stock Per our conversation with Alan Johnson we are removing dam #2 (see picture) and pond #2 We are planning to reestablish the stream once these items are removed We are submitting the application permit for pond #1 along with payment of $57000 Durning the summer months pond #2 dries up so therefore Alan indicated this would be the best time to make these changes Thankyou David Benenhaley f c \� I�f e,