Loading...
HomeMy WebLinkAbout20110581 Ver 2_Modifications_20120625DEPARTMENT OF THE ARMY WILMINGTON DISTRICT CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON NORTH CAROLINA 28403 1343 REPLY TO ATTENTION OF June 21, 2012 Environmental Resources Section Mr Ian McMillan North Carolina Division of Water Quality 1650 Mail Service Center Raleigh, North Carolina 27699 1650 Dear Mr McMillan ►► -0SB► v 2 D EUIN2 2012 DENR WATLN f- ITY The Town of Cary currently has permission to construct a stream restoration project on the White Oak stream in accordance with the General Water Certification No 3689 (Division of Water Quality Project No 11 058 1) Since the time of the original application for the General Water Certification No 3689 the stream upstream of the project area has headcut well beyond the original project limits An additional 105 linear feet of stream will be added to the current restoration protect in order to address the additional erosion and bed lowering caused by this headcut It is necessary to address this headcuttmg of the stream to ensure the success and stability of the stream restoration project Accordingly, modification of the Protect No 11 0581 is requested The additional stream area to be restored is depicted in the drawings enclosed with this letter Also, a check for the amount of $240 is enclosed for the modification fee Thank you for your attention to this matter Should you have any questions, please contact Ms Teresa Bullard Environmental Resources Section, at (910) 251 4725 Enclosures r Chief, Environmental Resources Section C 349 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 349 -0+10 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 PROFILE C/L SITES STREAM RELOCATION 9 x 373 - - - - - --- - - - - - -- - - - - - --- - - - - - - - - - - --- - - - - - -- - - - - - --- - - - - - -- - - - - - --- - - - - - -- - - - - - --- - - - - - -- - - - - - 373 LEFT TOP OF BANK 372 - - - - - --- - - - - - • - - - - - --- - - - - - A91Y - - - - - - - • i1i -0 -0 -- - - - - - - 0 - - - - - - -- - - - - 372 x + - - - - - --- - - - - - - - - - - --- - - - - + jPVI 11+81.57 371 - - - - - - - - - - - - r _M_ _%_ O- - - - - - -- - - - - ), - - - - 371 F EL. - - - - - PVI 16+93.62 j PVI 10+76.51 IL UA J A EL. 3618.45 RIGHT TOP OF BANK--,, IL LLI IL Lu • -- - - EL. 368.25 - - - - - - - - --- - - - - - - -------------- - - - - - - - - - - - - - - - - - - -- - - - - - 370 •370 4 BANKFULL • - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 369 F=0 0 369 0 .4000% .7997016 273 /0 368 - - - - - - - - - - - - • - ---- - - - - - --- - - - - - - - - - - - - - - - - - 0.53750/w - - - - - -- - - - - - 368 I 2.1011% .7997 ° / 367 .j273 0 JA867% - - - - - - - - I I - - - - --- - - - - I I - - - - --- - - - - - - I - - - - --- - - - - - - - - - --- - - - - - 2 - - - - - --- - - - - - 2 - - - - - 367 N ti 366 -BOULDER/ - - - - - - - --- - - - - - - - - - - --- - - - -- - - - - - --- - - - - - - - - - - - - - - - - - - - - - - -- - - - - -- 366 eMDN .+ + SILL R (TYP.) - + ... . . . . . ... . . . . . - - - - - - - - - - - 365 Cr 7 - - - - - 7 - - - - - - - - - - - - - - -- - - - IL UA - - - - -- - - - - - -365 - - - - ti EXISTING GROUND 0 IL Lu Re Ill. 364 - --- - - - - - • - 40 - - - --- - - - - - --- - - - - - - - - - - ---- - - - - - - - - - - ---- - - - - -- - - - - 364 Ln + OUTLET PROTECTION N + 40 rz , + ja M + + we AND/OR ARMORED POOL - - - - - --- - - - - - - OW - --- - - - q, w - _%_ cot - - --- - - - - - -- - - j - - - - - --- 363 - Wm- LW - - - - - - -- - - - - - 363 5 j. 5-1 a--::' INSTALL BOULDER CONSTRUCTED 5 J IL W, 0. W 0. W RIFFLE STEP-DOWN APPROX. 362 - - - - -CONSTRUCTED- - - - - - --- - - - - - - - - - - - - - - - - - - - - - - - - - - 362 152 UPSTREAM IN EXISTING CONSTRUCTED-.- -CONSTRUCTED - -- - - - RIFFLE STREAM RIFFLE RIFFLE M'm In In, 0 C4, In w, V C'w C4, Go M'o 0, W M, co V, M V_' 3* "Ov'r - - - - M. C) - - - - - P% 7 IN - - - - - 0) (a - - - - - C)-.M - - - - 0).M - - - - - qV in - - - - 9) - q - - - - - a)-.Rrff - - vi- - - - - - w, R - - - - A cc - - - - - q - - - - - - 361 46 TS 9.9 9.9 9 bi 06. PZ PZ - Cd C6 Cd C6 is 6.9 6.9 ca ,9 4 M Cq M M M M I M M M M I M M M 360 360 PVI 10+76.51 10+70 10+80 10+90 11+00 11+10 11+20 11+30 11+40 11+50 11+60 11+70 11+80 11+90 12+00 PVI 9+22.66 PVI 9+97.59 PVI 10+14.70 EL. 368.25 PROFILE C/L SITE 4 STREAM RELOCATION EL. 365.33 EL. 366.74 EL. 367.20 PVI 10+30.58 370 -- - - - - - - - --- - - - - - -- - - - - - - -- - - - - - --- - - - - - -- - - - - - --- - - - - - -- - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - EL, 367.27 - - - - - - - - - - - -- - - - - - --- - - - - -- - - - - - - -- 370 PVI 9+ .. . . . . . .. . . PVI 9+05.42 EL. 366.61 369 - - - - - - - - - --- - - - - - -- - - - - - - -- - - - - - --- - - - - - -- - - - - - - - - - - - -- - - - - - - EL. 365.26 -- - - - - - --- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - -- 369 LEFT TOP OF BANK -- - - - - - -- -- - - - - - -- PVI 8+68.41 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 368 -- - - - - - - - - - - - - 3% 368 EL. 364.24 RIGHT TOP OF BANK -------------------- ------- ------- ------- ------ PVI 8+44.36 0.4502% EXISTING 07�W�0- 7079% 3% 367 -- - - - -- - - - - -- - - - - - - T - - - - - - 7 - - - - - - - - - - - -- - - - - - --- - - - - - - - - - 2.J27- - - -- - - - - - - -- 367 PVI 8+20.60 EL: 364.14 - - -- - - - - - - - - - - - -- GROUND BANKFULL 0.4499% EL. 363.47 36 - - - - - - - - - - -- - - - - - - 2.708%' 6 -- - - - - - - - --- - - - - - -- - - - - - - - - - - - -- - - - - - --- - - - - - -- - - - - - --- - - - - - - - - - - - --- - - - - -- - - - - - - - - - - -- - - - - - - --- - - - - - - - 2107079%, - - -- - - - - - - - - - - - - - - - --- - - - - - -- - V - - - --- - - - - -- - - - - - - -- 366 0 0.4500.4o 365 - - - - - - - - --- - - - - - -- - - - - - - -- - - - - - --- - - - - - -- - - • - • - - - - - - -- - - - - - - - - --- - - - - - -- - - - - - - - - - - - - - - - --- - - - - -- - - - - - --- - - - - 2 - - - - - --- - - - - - - - - - - -- - - - - - - - - - - --- - - - - - -- - - - - - --- - - - - -- - - - - - - -- •2.737 '2u-.70510' 365 0.4481%6 -- - - - - - -- - - - - - -- - - - - - -- -- - - - - - -- 364 -- - - - - - - - - - ____ - - - - - - - - - --- - - - - - -- - - - --- - - - - - -- - - - - - --- - - - - - - - - - - - --- - - - - - -- - - - - -- - - - - - -- - - - - - -- - - - - - -- - - - - - - --- - - - - - - - - - -- 8209%- --- - - - - - - - - - - - 6)6 - - - - - - 364 X73 + -- - - - - - - - 0901 - - -- - - - - - --- - - - - - - - - - - ... . . . - - - - - - - - - - - - - - - - - - - - --- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- - - - - - - - - - - - - - - - - - - - - - - - cj t - - - - - -- - - - - - --- - - - - - -- - - - - - --- - - Cq -- - - - - - - - - 363 2.8 363 0 7 V . + + 0a IL Lu 362 - - - - - - - - --- - - - - - Cq - - - - -- - - - - - --- - - - - - -- - - - - - --- - - - - - -- - - - - - - -- - 362 - - - - - - -- - - - - - --- - - - - - - - - - - --- - - - - - -- - - - - - --- - - - - - -- - - - - - --- - - - - - • - - - - - --- - - - - - - - - - - --- - - - - - I - - - - - - - - - - - --- - - - - - - - --- - vq- in + ja - + 0 j J CONSTLld to Cq RUCTED RIFFLE L UJ C4 L UA -44 - --- - - - - - -- -- - - - - - -- - - - - - - - - - - - - - - - - - - - --- - - - - - 2 - - - - - --- - - - - - - - - - --- - - - - - -- - - - - - --- - - - - - -- - - - - - - -- 361 C4 V: _> 361 -- - - - - - - - - - - - - - - - - - - - - - 5 J PVI 8 +44.36 PVI -8+68.4 1 CONSTRUCTED RIFFLE CONSTRUCTED RIFFLE 1L LL1 CONSTRUCTED BOULDER CONSTRUCTED 0.4 - . C4 q EL. 362.94 - - - - -- EL. �363.04 + (a .+ W RIFFLE RIFFLE, STEP-DOWN 360 - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - 0 M - --- - - - - - - - - - - - - - - - - - - - - - - --- - - - - - - - - - - - --- - - - - - - - - - - - --- - - - - - - - - - - - --- - - - - - -- - - - - - --- - - - - - -- - - - I - --- - - - - - -- - - - - - --- - - - - - -- - - - - - - -- 360 PVI 8+20.60 J J > L UA CW0 EL. 36g.,A7 04, V- 0 M V'M V, V. IL uj Cc' V. 0'w V., V V, C4 V,0 In, Pl. 0, V 0, Re 94' Cq W 0 40' V w, C4 r-, 04, 0 00 359 -%-0 - - - - t,%.v -- - - - - T-Ift - - - - If-0 V-.% - - - N.-w- - - - -0.0 - - V M-0 - - - - W,a$ - - - 0. V, - - - - Oro- - - - - C4. M - - - - 44f r w - - - - - 44.00 - - - 1- 7 Rr - - - M. N - - - I- I T - M-40 - - - M. to - - - - W 40 - - - - - a)-. 1% - - - - - 0-0) qQL. M - - V- 44L. 1* - - - 11%.0 - - - C*- - - - - - Rw 359 6 V: 4A C4. C4 vi. A 6,A 4, V: vi. vi 6. v; 4. vi 4. vi 4. vi 6. 6 6. 4 mi. 4 ki. 4 mi. vi mi. mi mi. 4 Id. 4 V4. ui V4. ki V4. 4 C6. bi 06.46 06. 6 ca. 46 (636 PZ. P44, 0 W 0 ca too wo wo wo wo 0 0 W (0 0 W W 0 W W W 0 law wo wo wo we we law 0 0 W 0 O law to W 0 W wo 0 wa MM M-M M-M M-M M-M M-M M-M M." M-M M-M M-M M-M M-M M-M M-M M-M M-M M-M M." M-M M-M M-M M-M M-M M-M M-M M-M M. MM 358 1 1 1 1 1 1 1 1 1 1 1 1 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 358 8+10 8+20 8+30 8+40 8+50 8+60 8+70 8+80 8+90 9+00 9+10 9+20 9+30 9+40 9+50 9+60 9+70 9+80 9+90 10+00 10+10 10+20 10+30 10+40 10+50 10+60 10+70 10+80 10+90 SCALE IN FEET -/ION o - - - --- - - - -- - - - - - - - - - - - - - - - - - - --- - - - - - -- - - - - - --- - EXISTING PROFILE C/L SITE 4 STREAM RELOCATION 2 1 0 2 4FT 10 5 0 10 20FT SCALE: V=2'VERT. I�C'Al F: 1"=1n' HnR7 US Army Corps of Engineers Wilmington District 361 - - - - - --- - - - - - - - - - - - --- - - - - - - - - - - - --- - - - - - - - - - - - --- - - - - - - - - - - - --- - - - - - -- - - - - - 361 co ;�; I I 1 C) C\j Lu z LEFT TOP OF BANK < CQ < 0 + �Ei + CO LU _j Lu 360 - - - - - --- - - - - - - - - - - - -- - - - - - - - - - - --- - - - - - - - - - - --- - - - - - - - - - - -- 2 360 01: cf) C/) U) 0 M RIGHT TOP OF BANK Lu z O I_ LL - C 0 f) 0 cf) LLJ < fr Ei LLJ LLJ Cf) .00 z • - Ir LLJ 359 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - -- - - - - - - - -- - - - - - - - - - - - -- - - - 359 EXISTING. cp 0 a- ui 358 -GROUND - - - - - - - - - - - - - 7 - - - - - - - - - -- -- - - - - - - - - - - - - I ----- C4 358 C/? _j 357 0 -- - - - - -- - - - - -to f ............ - • - - - - - --- - - - - - - - --- - - - - 357 N C4 r M Cq BANKFUL + C� j 04 + +10 -i > 356 - - - - - - - -- On ... . . . .............. . . aw W - - - - - - - - - - - - 2 - IL U X-1 - 2 - - - - - 356 LW L UA L UJ' 01. I 0.4001% I. 653i�_- 355 -- - - - - jjj 433% 6- - oj� VA0 .7502% - 00% - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - r3 4,70 .865 - - 355 U) uj �5430% .5433%. i.75020/v .......... 354 -- - - - - - - 7 - - - - - - - - - -- - - - - - - - - - - - - - - -- - - - - - 354 _j o Mo ti C4 QI a; 353 - - 0 - - - - - - - - - 40 4 - - - - - - - --- - In - - - - A W - - - - - - - - - - +W 353 M C4 r, 7: rq N V + OM + OM 352 -1 -- - - - - -- OM + in - OM + - - - --- - - - OM - - - - - - - - - - - - - - - --- - - 5� -1 - , - - - - - - - - --- - - - - 352 > J, , IL UA . 351 J IL UA -- - - - - - -W - - - - - - - IL UA - - - -;- - - - - - - - - - - - -;- - - - - - - - - - - - -;- - - - - - - - - - - - -;- - - - - - - - - - - - 351 5 CONSTRUCTED CONSTRUCTED CONSTRUCTED ui 350 RIFFLE' 7 RIFFLE - - - - - - - RIFFLE 350 349 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 349 -0+10 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 PROFILE C/L SITES STREAM RELOCATION 9 x 373 - - - - - --- - - - - - -- - - - - - --- - - - - - - - - - - --- - - - - - -- - - - - - --- - - - - - -- - - - - - --- - - - - - -- - - - - - --- - - - - - -- - - - - - 373 LEFT TOP OF BANK 372 - - - - - --- - - - - - • - - - - - --- - - - - - A91Y - - - - - - - • i1i -0 -0 -- - - - - - - 0 - - - - - - -- - - - - 372 x + - - - - - --- - - - - - - - - - - --- - - - - + jPVI 11+81.57 371 - - - - - - - - - - - - r _M_ _%_ O- - - - - - -- - - - - ), - - - - 371 F EL. - - - - - PVI 16+93.62 j PVI 10+76.51 IL UA J A EL. 3618.45 RIGHT TOP OF BANK--,, IL LLI IL Lu • -- - - EL. 368.25 - - - - - - - - --- - - - - - - -------------- - - - - - - - - - - - - - - - - - - -- - - - - - 370 •370 4 BANKFULL • - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 369 F=0 0 369 0 .4000% .7997016 273 /0 368 - - - - - - - - - - - - • - ---- - - - - - --- - - - - - - - - - - - - - - - - - 0.53750/w - - - - - -- - - - - - 368 I 2.1011% .7997 ° / 367 .j273 0 JA867% - - - - - - - - I I - - - - --- - - - - I I - - - - --- - - - - - - I - - - - --- - - - - - - - - - --- - - - - - 2 - - - - - --- - - - - - 2 - - - - - 367 N ti 366 -BOULDER/ - - - - - - - --- - - - - - - - - - - --- - - - -- - - - - - --- - - - - - - - - - - - - - - - - - - - - - - -- - - - - -- 366 eMDN .+ + SILL R (TYP.) - + ... . . . . . ... . . . . . - - - - - - - - - - - 365 Cr 7 - - - - - 7 - - - - - - - - - - - - - - -- - - - IL UA - - - - -- - - - - - -365 - - - - ti EXISTING GROUND 0 IL Lu Re Ill. 364 - --- - - - - - • - 40 - - - --- - - - - - --- - - - - - - - - - - ---- - - - - - - - - - - ---- - - - - -- - - - - 364 Ln + OUTLET PROTECTION N + 40 rz , + ja M + + we AND/OR ARMORED POOL - - - - - --- - - - - - - OW - --- - - - q, w - _%_ cot - - --- - - - - - -- - - j - - - - - --- 363 - Wm- LW - - - - - - -- - - - - - 363 5 j. 5-1 a--::' INSTALL BOULDER CONSTRUCTED 5 J IL W, 0. W 0. W RIFFLE STEP-DOWN APPROX. 362 - - - - -CONSTRUCTED- - - - - - --- - - - - - - - - - - - - - - - - - - - - - - - - - - 362 152 UPSTREAM IN EXISTING CONSTRUCTED-.- -CONSTRUCTED - -- - - - RIFFLE STREAM RIFFLE RIFFLE M'm In In, 0 C4, In w, V C'w C4, Go M'o 0, W M, co V, M V_' 3* "Ov'r - - - - M. C) - - - - - P% 7 IN - - - - - 0) (a - - - - - C)-.M - - - - 0).M - - - - - qV in - - - - 9) - q - - - - - a)-.Rrff - - vi- - - - - - w, R - - - - A cc - - - - - q - - - - - - 361 46 TS 9.9 9.9 9 bi 06. PZ PZ - Cd C6 Cd C6 is 6.9 6.9 ca ,9 4 M Cq M M M M I M M M M I M M M 360 360 PVI 10+76.51 10+70 10+80 10+90 11+00 11+10 11+20 11+30 11+40 11+50 11+60 11+70 11+80 11+90 12+00 PVI 9+22.66 PVI 9+97.59 PVI 10+14.70 EL. 368.25 PROFILE C/L SITE 4 STREAM RELOCATION EL. 365.33 EL. 366.74 EL. 367.20 PVI 10+30.58 370 -- - - - - - - - --- - - - - - -- - - - - - - -- - - - - - --- - - - - - -- - - - - - --- - - - - - -- - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - EL, 367.27 - - - - - - - - - - - -- - - - - - --- - - - - -- - - - - - - -- 370 PVI 9+ .. . . . . . .. . . PVI 9+05.42 EL. 366.61 369 - - - - - - - - - --- - - - - - -- - - - - - - -- - - - - - --- - - - - - -- - - - - - - - - - - - -- - - - - - - EL. 365.26 -- - - - - - --- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - -- 369 LEFT TOP OF BANK -- - - - - - -- -- - - - - - -- PVI 8+68.41 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 368 -- - - - - - - - - - - - - 3% 368 EL. 364.24 RIGHT TOP OF BANK -------------------- ------- ------- ------- ------ PVI 8+44.36 0.4502% EXISTING 07�W�0- 7079% 3% 367 -- - - - -- - - - - -- - - - - - - T - - - - - - 7 - - - - - - - - - - - -- - - - - - --- - - - - - - - - - 2.J27- - - -- - - - - - - -- 367 PVI 8+20.60 EL: 364.14 - - -- - - - - - - - - - - - -- GROUND BANKFULL 0.4499% EL. 363.47 36 - - - - - - - - - - -- - - - - - - 2.708%' 6 -- - - - - - - - --- - - - - - -- - - - - - - - - - - - -- - - - - - --- - - - - - -- - - - - - --- - - - - - - - - - - - --- - - - - -- - - - - - - - - - - -- - - - - - - --- - - - - - - - 2107079%, - - -- - - - - - - - - - - - - - - - --- - - - - - -- - V - - - --- - - - - -- - - - - - - -- 366 0 0.4500.4o 365 - - - - - - - - --- - - - - - -- - - - - - - -- - - - - - --- - - - - - -- - - • - • - - - - - - -- - - - - - - - - --- - - - - - -- - - - - - - - - - - - - - - - --- - - - - -- - - - - - --- - - - - 2 - - - - - --- - - - - - - - - - - -- - - - - - - - - - - --- - - - - - -- - - - - - --- - - - - -- - - - - - - -- •2.737 '2u-.70510' 365 0.4481%6 -- - - - - - -- - - - - - -- - - - - - -- -- - - - - - -- 364 -- - - - - - - - - - ____ - - - - - - - - - --- - - - - - -- - - - --- - - - - - -- - - - - - --- - - - - - - - - - - - --- - - - - - -- - - - - -- - - - - - -- - - - - - -- - - - - - -- - - - - - - --- - - - - - - - - - -- 8209%- --- - - - - - - - - - - - 6)6 - - - - - - 364 X73 + -- - - - - - - - 0901 - - -- - - - - - --- - - - - - - - - - - ... . . . - - - - - - - - - - - - - - - - - - - - --- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- - - - - - - - - - - - - - - - - - - - - - - - cj t - - - - - -- - - - - - --- - - - - - -- - - - - - --- - - Cq -- - - - - - - - - 363 2.8 363 0 7 V . + + 0a IL Lu 362 - - - - - - - - --- - - - - - Cq - - - - -- - - - - - --- - - - - - -- - - - - - --- - - - - - -- - - - - - - -- - 362 - - - - - - -- - - - - - --- - - - - - - - - - - --- - - - - - -- - - - - - --- - - - - - -- - - - - - --- - - - - - • - - - - - --- - - - - - - - - - - --- - - - - - I - - - - - - - - - - - --- - - - - - - - --- - vq- in + ja - + 0 j J CONSTLld to Cq RUCTED RIFFLE L UJ C4 L UA -44 - --- - - - - - -- -- - - - - - -- - - - - - - - - - - - - - - - - - - - --- - - - - - 2 - - - - - --- - - - - - - - - - --- - - - - - -- - - - - - --- - - - - - -- - - - - - - -- 361 C4 V: _> 361 -- - - - - - - - - - - - - - - - - - - - - - 5 J PVI 8 +44.36 PVI -8+68.4 1 CONSTRUCTED RIFFLE CONSTRUCTED RIFFLE 1L LL1 CONSTRUCTED BOULDER CONSTRUCTED 0.4 - . C4 q EL. 362.94 - - - - -- EL. �363.04 + (a .+ W RIFFLE RIFFLE, STEP-DOWN 360 - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - 0 M - --- - - - - - - - - - - - - - - - - - - - - - - --- - - - - - - - - - - - --- - - - - - - - - - - - --- - - - - - - - - - - - --- - - - - - -- - - - - - --- - - - - - -- - - - I - --- - - - - - -- - - - - - --- - - - - - -- - - - - - - -- 360 PVI 8+20.60 J J > L UA CW0 EL. 36g.,A7 04, V- 0 M V'M V, V. IL uj Cc' V. 0'w V., V V, C4 V,0 In, Pl. 0, V 0, Re 94' Cq W 0 40' V w, C4 r-, 04, 0 00 359 -%-0 - - - - t,%.v -- - - - - T-Ift - - - - If-0 V-.% - - - N.-w- - - - -0.0 - - V M-0 - - - - W,a$ - - - 0. V, - - - - Oro- - - - - C4. M - - - - 44f r w - - - - - 44.00 - - - 1- 7 Rr - - - M. N - - - I- I T - M-40 - - - M. to - - - - W 40 - - - - - a)-. 1% - - - - - 0-0) qQL. M - - V- 44L. 1* - - - 11%.0 - - - C*- - - - - - Rw 359 6 V: 4A C4. C4 vi. A 6,A 4, V: vi. vi 6. v; 4. vi 4. vi 4. vi 6. 6 6. 4 mi. 4 ki. 4 mi. vi mi. mi mi. 4 Id. 4 V4. ui V4. ki V4. 4 C6. bi 06.46 06. 6 ca. 46 (636 PZ. P44, 0 W 0 ca too wo wo wo wo 0 0 W (0 0 W W 0 W W W 0 law wo wo wo we we law 0 0 W 0 O law to W 0 W wo 0 wa MM M-M M-M M-M M-M M-M M-M M." M-M M-M M-M M-M M-M M-M M-M M-M M-M M-M M." M-M M-M M-M M-M M-M M-M M-M M-M M. MM 358 1 1 1 1 1 1 1 1 1 1 1 1 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 358 8+10 8+20 8+30 8+40 8+50 8+60 8+70 8+80 8+90 9+00 9+10 9+20 9+30 9+40 9+50 9+60 9+70 9+80 9+90 10+00 10+10 10+20 10+30 10+40 10+50 10+60 10+70 10+80 10+90 SCALE IN FEET -/ION o - - - --- - - - -- - - - - - - - - - - - - - - - - - - --- - - - - - -- - - - - - --- - EXISTING PROFILE C/L SITE 4 STREAM RELOCATION 2 1 0 2 4FT 10 5 0 10 20FT SCALE: V=2'VERT. I�C'Al F: 1"=1n' HnR7 US Army Corps of Engineers Wilmington District Z 0 U Lu , , U) z (D U) Lu LLJ 0 L > Lu W LJ 0 0 z C\1 C) C\1 I C) 0 LLJ z Lu _j LL LO Cf) 25, cz C) PZ - +. < _ C:) T_ ff Cr o < C-) 0 00 co ;�; I I 1 C) C\j Lu z L0 M c) C\j T_ C) < CQ < 0 + �Ei + CO LU _j Lu Cf) fr >_ 0 C) ui W Cf) Cl) Z Lu Lu 1— 01: cf) C/) U) 0 M u) LU LLJ Lu =� Lu z O I_ LL - C 0 f) 0 cf) LLJ < fr Ei LLJ LLJ Cf) .00 z Ir LLJ Z LLJ 0 0 LL Z zo z - LU cp 0 a- ui Ir 0 Z C/? _j 0 U) uj _j 0 ui 0 ui it Z 0 Z 0 Lu M a: 0 co Lu Lu Cr Cn Lu Lou Lu �O� Z 0 U Lu , , U) z (D U) Lu LLJ 0 L > Lu W LJ 0 0 z C\1 C) C\1 I C) 0 LLJ z Lu _j LL LO Cf) 25, cz C) PZ - +. < _ C:) T_ ff Cr o < C-) 0 00 co ;�; I I 1 C) C\j Lu z L0 M c) C\j T_ C) < CQ < 0 + �Ei + CO LU _j Lu Cf) fr >_ 0 C) _j W Cf) Cl) Z Lu Lu 1— 01: cf) C/) U) 0 M u) LU LLJ Lu =� Lu z O I_ LL - C 0 f) 0 cf) LLJ < fr Ei LLJ LLJ Cf) .00 z Ir LLJ Z LLJ 0 0 LL Z zo z - LU cp 0 a- Ir 0 Z C/? _j z O C\j LO - < z fr 0 0 CY) C:) co CC) + C/) LLJ PZ - +. < _ C:) T_ ff Cr o < C-) 0 00 co ;�; I I 1 Lu 8 LLJ Ir cr C0 >- L0 M c) C\j T_ C) < CQ < 0 + �Ei + CO LLJ Lu < C) < F- Cf) fr >_ 0 C) C/) Cf) U) < < ). Lr) L0 D CC CY < z 0 Lu Lu 1— 01: cf) C/) Lu 0 F-- N W u) LU LLJ Lu =� Lu z O I_ LL - C 0 f) 0 F- 0 LLJ Cf) .00 PLATE NUMBER P -11 SHEET 13 OF 64 5 D 3 2 A I B I C TYPICAL DETAIL COIR FIBER MATTING PLAN VIEW BRUSH MATTRESS - THIS METHOD USES HARDWOOD BRUSH LAYERED ALONG A STREAMBANK AS A MATTRESS AND ANCHORED IN PLACE WITH GRID OF STAKES AND WIRE. THE TOE BELOW THE WATERLINE 1 IS ANCHORED BY ROCK. N.T.S. =S (3' LENGTH) 12 GAUGE NON- GALVANIZED WIRE WIRE SECURED TO STAKES ANCHES MIN. PER 3' :HES OF 1' DIA, OR LESS STAKE EXCAVA L- AT TOE OF SLOPE 1.5' WIDTH x 1.0' DEPTH (BACKFILL WITH SOIL) I COIR FIBER MATTING E �n n A irnr SECTION A —A N.T.S. COIR FIBER MATTING TO EXTEND FROM TOE OF STREAM TO 2'BEYOND TOP OF CUT SLOPE SECTION B —B N.T.S. TYPICAL DETAIL BRUSH MATTRESS N.T.S. STAKES 3RUSH MATTRESS: i. uu i or-,ANCHES OF SPECIFIED TYPE AT 45 DEGREE ANGLE LONG ENOUGH TO COVER BANKS PLUS I' DEEP INTO TRENCH AND I' ABOVE TOP OF BANK. 2. DIG TRENCH AT BASE OF BANK, RESERVING SOIL FOR BACKFILL 3. LAY FIRST LAYER OF CUTTINGS PERPENDICULAR TO SLOPE, MAKING SURE TO PUSH CUT END INTO TRENCH 4.LAY SECOND LAYER AT 45 DEGREES (UPSTREAM) 5. LAY THIRD LAYER AT 45 DEGREE (DOWNSTREAM F I G J J L._ Y Z Q A BACKFILL °° Y2" REBAR ROD - INSTALL 2' FROM END OF LOG BOULDERS TO BE u FOOTER CUT NOTCH BURIED AND PLACED J LOG LENGTH 9" AT END OF LOGS DEPTH 18" Y FLOW z a M BURY FOOTER LOG INTO POOL CHANNEL BED, SECURE LOGS TOGETHER BY PINNING EACH END WITH Y2" REBAR. EXISTING POOL FLOW BACKFILL, TYP. *57 STONE,AND /OR- CLASS ''A'' STONE T` EXCAVATE TRENCH FOR LOG SILL CONSTRUCTION PLAN VIEW HEADE LOG #57 STONE REBAR ROD INSTALL 2' FROM END OF LOG BOULDERS TO BE BURIED AND PLACED AT END OF LOGS KEY INTO BANK A MINIMUM OF 2 FT. EADER LOG, TYP. FOOTER LOG, TYP 2' MIN. ' MIN. ABED EXISTING POOL -Y2" REBAR ROD FILTER FABRIC, TYP. NAIL FILTER FABRIC TO BACK OF LOG SECTION A -A ° TYPICAL `- LOG DETAIL SILL N.T.S. ° NOTES LOG SILL: PLACE LOG SILL JUST UPSTREAM OF EXISTING POOL. THE LOGS SHALL BE EXISTING HARDWOOD TREE SPECIES WITH A MINIMUM TRUNK DIAMETER OF 18'' REMOVED AS PART OF THE CLEARING OPERATION WITHIN THE CONSTRUCTION LIMITS AS SHOWN ON THE PLANS THE LENGTH OF EACH LOG SHALL BE SUFFICIENT TO ALLOW PROPER CONSTRUCTION IN ACCORDANCE WITH THE LOG SILL DETAIL. LOG SILL SHALL BE CONSTRUCTED ACCORDING TO THE LOG SILL DETAIL SHOWN ON THE PLANS OR AS DIRECTED BY THE CONTRACTING OFFICER. LOGS SHALL BE ANCHORED TOGETHER BY PINNING WITH 5%4" REBAR AND ANCHORED TO THE STREAMBED AS DIRECTED. PLATE THE UPSTREAM SIDE OF THE LOGS WITH TYPE 2 FILTER FABRIC AND NO. 57 STONE. THE FILTER FABRIC SHALL BE SECURELY FASTENED TO THE BACK OF THE LOG USING GALVANIZED ROOFING NAILS ON APPROXIMATELY 8'' CENTERS. THE LOG SHALL BE KEYED INTO THE BANK AT THE DOWNSTREAM END. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL LOGS PER THE PLANS OR AS DIRECTED. HARDWOOD TREES ENCOUNTERED DURING CLEARING AND GRUBBING MAY BE IDENTIFIED AND STOCKPILED FOR USE AS LOGS. CARE SHALL BE TAKEN TO PRESERVE THE LOG STRUCTURE ON THE HARVESTED TREES TO BE USED AS LOG SILLS AS SHOWN ON THE DETAIL IN THE PLANS. 6. (OPTIONAL STEP IF NEEDED TO HOLD BRANCHES CLOSE TO GROUND SURFACE AT TOP OF STREAMBANK). ABOUT 1/2 -2/3 OF THE WAY UP THE BANK, PLACE STAKES IN A ROW, SPACED 3' APART. HAMMER TO GET STARTED. WRAP WIRE AROUND 1ST STAKE; CONNECT TO 2ND STAKE AND WRAP; CONNECT TO 3RD STAKE AND WRAP, ETC. 7.USING SHOVELS AND BUCKETS OR TRACK HOE BUCKET, SPRINKLE SOIL THROUGH THE CUTTINGS 8.IF USING OPTIONAL STAKES, HAMMER INTO BANK 9. WRAP WIRE NEAR TOP OF STAKES IN CRISSCROSS PATTERN. 10FINISH BY HAMMERING REMAINING STAKES INTO BANK. US Army Corps of Engineers Wilmington District 0 ui 0 a. ui 0 Z 0 Ca 0 J m 0 R a a Q �W �o Lu w 0 0 z 0 wZ CD p a� J M ww 0 0 U 0 0 0 a W0 Z ff N t3 Cr o cn Z T �o�L_u_ cr0 CD � W ui fr =° w U) Q } (3 o V o N C z 0 01: C.0 rr �O= w ° co Lu U Cl) 0 w 0 o w 0 Z p z v �� LJ U W C J ¢ V � LL CD a0 N ui m Lu 0 J Y _j ui co ui U D co N U Z J C/) Ei W Ir Q w U rr Z W Z Zw0 z w z cp 0 oC 0 z Q U 5 uj J z 0 Z ff 0 0 a ff Cr o cn Z CD u) �o�L_u_ cr0 U)zC'S J O �Q� Q�J ui fr =° w U) 0C) JLU� ate? 0 oC Qm� U LL Q C z 0 01: C.0 rr �O= w ° co Lu U Cl) 0 Ir 0 m w PLATE NUMBER EC -4 SHEET 410E 64