HomeMy WebLinkAboutNC0071862_Compliance Evaluation Inspection_20180223EPA
United States Environmental Protection Agency
Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 N 52 NC0071862 18/02/23 C S31112171819 20
21 66
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
N67707172 73 74 75 80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Magnolia Place WWTP
1 Ariel Loop
Hendersonville NC 287929583
Entry Time/Date Permit Effective Date
Exit Time/Date Permit Expiration Date
10:15AM 18/02/23 16/02/01
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Henry Keith Odom/ORC/828-685-9520/
Other Facility Data
11:15AM 18/02/23 20/11/30
Name, Address of Responsible Official/Title/Phone and Fax Number
Henry Keith Odom,1 Ariel Loop Hendersonville NC 287929583/Owner/828-685-9520/Contacted
Yes
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Operations & Maintenance Records/Reports Self-Monitoring Program
Facility Site Review
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date
Janet Cantwell ARO WQ//828-296-4500 Ext.4667/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#1
3/22/2018
3/26/2018
NPDES yr/mo/day
18/02/23
Inspection Type
C3111218
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
I met with Henry Odom/ ORC to inspect this facility.
Mr. Odom, the owner and operator of this facility, visits the site twice daily.
The site was clean and orderly and it appears the facility is well operated and maintained.
The current permit became effective 02/01/2016 and will expire 11/30/2020.
This facility consists of dual bar screens, dual aeration basins and dual clarifiers.
There is also an effluent pump station within the confines of the facility and pumps to Lancaster Creek.
This facility is signed up for and is using the EDMR system.
Mr. Odom stated that he intends to have the facility painted by the end of June 2018.
Thirty minute Settleable Solids were at 45% for the lower plant and 50% for the upper plant.
The color was good.
Records for daily logs, DMRs, permit and other pertinent information were readily available and in
excellent order.
NC0071862 17 (Cont.)
Page#2
Permit:NC0071862
Inspection Date:02/23/2018
Owner - Facility:
Inspection Type:
Magnolia Place WWTP
Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
application?
Is the facility as described in the permit?
# Are there any special conditions for the permit?
Is access to the plant site restricted to the general public?
Is the inspector granted access to all areas for inspection?
The current permit became effective 02/01/2016 and will expire 11/30/2020.
This facility consists of dual bar screens, dual aeration basins and dual clarifiers.
There is also an effluent pump station within the confines of the facility and pumps to
Lancaster Creek.
This facility is signed up for and is using the EDMR system.
Comment:
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
Mr. Odom, the owner and operator of this facility, visits the site twice daily.
The site was clean and orderly and it appears the facility is well operated and maintained.
Thirty minute Settleable Solids were at 45% for the lower plant and 50% for the upper plant.
Mr. Odom stated that he intends to have the facility painted by the end of June 2018.
Comment:
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain-of-custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator
on each shift?
Page#3
Permit:NC0071862
Inspection Date:02/23/2018
Owner - Facility:
Inspection Type:
Magnolia Place WWTP
Compliance Evaluation
Record Keeping Yes No NA NE
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility classification?
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
Records for daily logs, DMRs, permit and other pertinent information were readily available
and in excellent order.
Comment:
Bar Screens Yes No NA NE
Type of bar screen
a.Manual
b.Mechanical
Are the bars adequately screening debris?
Is the screen free of excessive debris?
Is disposal of screening in compliance?
Is the unit in good condition?
This facility consists of dual bar screens.Comment:
Aeration Basins Yes No NA NE
Mode of operation Ext. Air
Type of aeration system Diffused
Is the basin free of dead spots?
Are surface aerators and mixers operational?
Are the diffusers operational?
Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin’s surface?
Is the DO level acceptable?
Is the DO level acceptable?(1.0 to 3.0 mg/l)
This facility has dual aeration basins.
The color was good.
Comment:
Secondary Clarifier Yes No NA NE
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center well of circular clarifier?
Page#4
Permit:NC0071862
Inspection Date:02/23/2018
Owner - Facility:
Inspection Type:
Magnolia Place WWTP
Compliance Evaluation
Secondary Clarifier Yes No NA NE
Are weirs level?
Is the site free of weir blockage?
Is the site free of evidence of short-circuiting?
Is scum removal adequate?
Is the site free of excessive floating sludge?
Is the drive unit operational?
Is the return rate acceptable (low turbulence)?
Is the overflow clear of excessive solids/pin floc?
Is the sludge blanket level acceptable? (Approximately ¼ of the sidewall depth)
This facility has dual clarifiers.Comment:
Disinfection-Tablet Yes No NA NE
Are tablet chlorinators operational?
Are the tablets the proper size and type?
Number of tubes in use?2
Is the level of chlorine residual acceptable?
Is the contact chamber free of growth, or sludge buildup?
Is there chlorine residual prior to de-chlorination?
There is one tube of chlorine tablets for each of the basins.Comment:
De-chlorination Yes No NA NE
Type of system ?Tablet
Is the feed ratio proportional to chlorine amount (1 to 1)?
Is storage appropriate for cylinders?
# Is de-chlorination substance stored away from chlorine containers?
Are the tablets the proper size and type?
There are two tubes of de-chlor.Comment:
Are tablet de-chlorinators operational?
Number of tubes in use?2
Comment:
Page#5