Loading...
HomeMy WebLinkAbout20210051 Ver 1_170330 - E Nash PV2 - SHPO Excerpt-State Clearinghouse Comments (1)_20210223Roy COOPER GOVERNOR March 30, 2017 Ms. Lynn Jarvis North Carolina Department of Commerce Utilities Commission 4325 Mail Service Center Raleigh, North Carolina 27699-4325 MACHELLE SANDERS SE(WTARY Res SCk1 File # 17-E-4600-0372; Application of Fresh Air Energy 11, LLC for Certificate to construct a 26 MW Solar Facility in Dash Co. Docket #SP-2665, Sub 41. Dear Ms. Jarvis: The above referenced environmental impact information has been reviewed through the State Clearinghouse under the provisions of the North Carolina Environmental Policy Act. Attached to this letter are comments made in the review of this document. Because of the nature of the comments, it has been determined that no further State Clearinghouse review action on your part is needed for compliance with the North Carolina Environmental Policy Act. The attached comments should be taken into consideration in project development. Sincerely, Crystal Best State Environmental Review Clearinghouse Attachments cc: Region L Mailing Address: Telephone: (919) 807-2425 Location: NC DEPARTMENT OF ADMINISTRATION Fax: (919) 733-9571 116 WEST TONES STREET 1301 MAIL SERVICE CENTER COURIER #51-01-00 RAL.EIGH, NORTH CA.ROLINA RALEIGH, NC 27699-1.301 Email: state. cleajinghouse@doo-ne.gov Website: vWV, c.ti.cira €r,i}c. e; J LL LL Q 0 r14 0 r� L la ROY COOPER iIl �!l►�k�l i\G7l 1���� ��i To: Crystal Best State Clearinghouse Coordinator Department of Administration From: Lyn Hardison /_' ' Division of Environmental Assistance and Customer Service Environmental Assistance and project Review Coordinator Washington Regional Office RE: 17-0372 Environmental Review —Application of Fresh Air Energy II, LLC for the Certificate to construct a 26 MW Solar Facility Nash County Date: March 29, 2017 The Department of Environmental Quality has reviewed the proposal for the referenced project. Based on the information provided, several of our agencies have identified permits that may be required and offered some valuable guidance. The comments are attached for the applicant's review. If the applicant has any questions pertaining to NCDEQ permitting processes, please suggest to the applicant to contact David Lee, Permit Assistance Coordinator, in the Department's Raleigh Regional Office, (919) 791-4200. The proposed project is located within his geographic working territory. Thank you for the opportunity to respond. Attachment j'{ fV'ESi k,01 Ma'i -t ,+i_ i.:".f 4 n.. CD CV CD M 6. M la State of North Carolina Department of Environmental Quality INTERGOVERNMENTAL REVIEW PROJECT COMMENTS Reviewing Regional Office: RALEIGH Project Number: 17-0372 Due Date: 3 17 17 � �..<,�P County: Nash After review of this project it has been determined that the DEQ permit(s) and/or approvals indicated may need to be obtained in order for this project to comply with North Carolina Law. Questions regardingthese permits should be addressed to the Regional Office indicated on the reverse of the form. All applications, information and guidelines relative to these plans and permits are available from the same Regional Office. 3 Normal Process i PERMITS I SPECIAL APPLICATION PROCEDURES or REQUIREMENTS Time (statutory time limit) I Permit to construct & operate wastewater Application 90 days before begins construction or award of treatment facilities, non-standard sewer system construction contracts. On -site inspection may be required. Post- 30 days extensions &sewer systems that do not i application technical conference usual. (90 days) discharge into state surface waters. Permit to construct & operate, sewer extensions involving gravity sewers, pump Fast -Track Permitting program consists of the submittal of an 30 days ❑ stations and force mains discharging into a application and an engineer's certification that the project meets all (N/A) sewer collection applicable State rules and Division Minimum Design Criteria. system NPDES - permit to discharge into surface water Application 190 days before begins activity. On -site inspection. Pre - and/or permit to operate and construct application conference usual. Additionally, obtain permit to Construct 90-120 days wastewater facilities discharging into state wastewater treatment facility -granted after NPDES. Reply time, 30 days (N/A) surface waters. after receipt of plans or issue of NPDES permit -whichever is later. ❑ Water Use Permit Pre -application technical conference usually necessary. 30 days (N/A) Complete application must be received and permit issued prior to the ❑ Well Construction Permit installation of a groundwater monitoring well located on property not 7 days owned by the applicant, and for a large capacity (>100,000 gallons per (15 days) day) water supply well Application copy must be served on each adjacent riparian property ❑ Dredge and Fill Permit owner. On -site inspection. Pre -application conference usual. Filling may 55 days require Easement to Fill from N.C. Department of Administration and (90 days) Federal Dredge and Fill Permit. Permit to construct & operate Air Pollution Application must be submitted and permit received prior to ❑ Abatement facilities and/or Emission Sources as construction and operation of the source. if a permit is required 90 days per 15 A NCAC (2Q.O100 thru 2Q,0300) in an area without local zoning, then there are additional requirements and timelines (2Q.0113). Any open burning associated with subject days ® proposal must be in compliance with 15 A NCAC N/A 2D.1900 (9900 days) Demolition or renovations of structures Please Note - The Health Hazards Control Unit (HHCU) of the N.C. containing asbestos material must be in Department of Health and Human Services, must be notified of plans to ® compliance with 15 A NCAC 20.1110 (a) (1) demolish a building, including residences for commercial or industrial 60 days I which requires notification and removal prior to expansion, even if no asbestos is present in the building. (90 days) demolition. Contact Asbestos Control Group 919-707-5950 The Sedimentation Pollution Control Act of 1973 must be properly addressed for any land disturbing activity. An erosion & sedimentation control plan will be requited if one or more acres are to be disturbed. Plan must be filed with and approved 20 days ® by applicable Regional Office (Land Quality Section) at least 30 days before beginning activity. A NPDES Construction (30 days) Stormwater permit (NCG010000) is also usually issued should design features meet minimum requirements. A fee of $65 for the first acre or any part of an acre. An express review option is available with additional fees. Sedimentation and erosion control must be addressed in accordance with NCDOT's approved program. Particular (30 days) ❑attention should be even to design and installation of appropriate erimeter sediment trapping g' gp Aping devices as well as stable Stormwater conveyances and outlets. Sedimentation and erosion control must be addressed in accordance with Local Government's approved program. Based on Local ❑ Particular attention should be given to design and installation of appropriate perimeter sediment trapping devices as well as stable Stormwater conveyances and outlets. Program ❑ Compliance with 15A NCAC 2H .0126 - NPDES Stormwater Program which regulates three types of activities: Industrial, 30-60 days Municipal Separate Storm Sewer System & Construction activities that disturb 21 acre. (90 days) Compliance with-1_5A,NCAC 2H.1000-State.Stracmwater Permitting -Programs regulatesite: development, and. post-: 45 days Elconstruction stormwater runoff control. Areas subject to these permit programs include all 20 coastal counties, and (90 days) various other counties and watersheds throughout the state. DEQ INTERGOVERNMENTAL REVIEW PROJECT Form Page 1 of 3 January 2017/lbh 0 LL LL Q 2 State of North Carolina Department of Environmental Quality INTERGOVERNMENTAL REVIEW PROJECT COMMENTS Reviewing Regional Office: RALEiGH Project Number: 17-0372 Due Date: 3 17 17 ( r County: Nash Normal Process PERMITS SPECIAL APPLICATION PROCEDURES or REQUIREMENTS Time (statutory time Limit) On -site inspection usual. Surety bond filed with DEQ Bond amount ❑ Mining permit varies with type mine and number of acres of affected land. Affected 30 days area greater than one acre must be permitted. The appropriate bond (60 days) must be received before the permit can be issued. If permit required, application 60 days before begin construction. Applicant must hire N.C. qualified engineer to: prepare plans, inspect construction, and certify construction is according to DEQ approved ❑ Dam Safety Permit plans. May also require a permit under mosquito control program. And i plans. 30 days 404 permit from Corps of Engineers, An inspection of site is necessary (60 days) to verify Hazard Classification. A minimum fee of $200.00 must accompany the application. An additional processing fee based on a percentage or the total project cost will be required upon completion. ❑ Oil Refining Facilities N/A 90-120 days (N/A) File surety bond of $5,000 with DEQ running to State of NC conditional 10 days ❑ Permit to drill exploratory oil or gas well that any well opened by drill operator shall, upon abandonment, be N/A plugged according to DEQ rules and regulations. ❑ Geophysical Exploration Permit Application flied with DEQ at least 10 days prior to issue of permit. 10 days Application by letter. No standard application form. N/A Application fee based on structure size is charged. Must include 15-20 days ❑ State Lakes Construction Permit descriptions & drawings of structure & proof of ownership of riparian N/A property i Compliance with the T15A 02H .0500 Certifications are required 60 days ❑ 401 Water Quality Certification whenever construction or operation of facilities will result in a (130 days) I discharge into navigable water as described in 33 CPR part 323, Compliance with Catawba, Goose Creek, Jordan Lake, Randleman, Tar Pamlico or Neuse Riparian Buffer Rules is required. ® Buffer requirements l.ta d ,, ,��t uE ' ,� sici����uater -�rurc w p„r n vi- ar pis: c,��latrr Cifca+iC. �`!=£�l-L'i2€Et;lf>-ilfi TP( i{:i" �I!-i ,3 k'I€�.,,,_ hi fB�L� r:�Ct.')n:12 O CCr�lE. Nutrient Offset: Loading requirements for nitrogen and phosphorus in the Neuse and Tar -Pamlico River basins, and in the l Jordan and Falls Lake watersheds, as part of the nutrient -management strategies in these areas. DWR nutrient offset ! ❑ information: re oq r j/ anmini'-ft )gl n tiQJ tic:.. C"i'S I7£.liiYYBPt'it {ti; t-if; € Q'i Sra-. iI5:i7rli;mi!ri �� 1 .........., ..........�.,,.. ❑ CAMA Permit for MAJOR development $250,00 - $475.00 fee must accompany application 75 days (150 days) ❑ CAMA Permit for MINOR development $100.00 fee must accompany application 22 days (25 days) ® Abandonment of any wells, if required must be in accordance with Title 1SA. Subchapter 2C.0100. ED Notification of the proper regional office is requested if "orphan" underground storage tanks (USTS) are discovered during any excavation operation. Plans and specifications for the construction, expansion, or alteration of a public water system must be approved by the Division of Water Resources/Public Water Supply Section priorto the award of a contract or the initiation of construction ❑ as per 1SA NCAC 18C ,0300 et, seq., Plans and specifications should be submitted to 1634 Mail Service Center, Raleigh, 30 days North Carolina 27699-1634. All public water supply systems must comply with state and federal drinking water monitoring requirements, For more information, contact the Public Water Supply Section, (919) 707-910D. If existing water lines will be relocated during the construction, plans for the water line relocation must be submitted to ❑ the Division of Water Resources/Public Water Supply Section at 1634 Mail Service Center, Raleigh, North Carolina 27699- 30 days 1634. For more information, contact the Public Water Supply Section, (919) 707-9100. Plans and specifications for the construction, expansion, or alteration of the water system must be approved ❑ through the delegated plan approval authority, Please contact them at for further information, DEQ INTERGOVERNMENTAL REVIEW PROJECT Form Page 2 of 3 January 2017/lbh O J 4 75 LL LL 0 r CD C04 CD M V to M State of North Carolina Department of Environmental Quality INTERGOVERNMENTAL REVIEW PROJECT COMMENTS Reviewing Regional Office: RALEIGH Project Number: 17-0372 Due Date: 3/17/17 E ](I County: Nash Other Comments (attach additional pages as necessary, being certain to comment authority) Division initials No Comments Date comment Review DAQ DDM ❑ 2/27/17 DWR-WQROS DS &RB ❑ Fresh Air Energy It, ILC 26 MW 3/16/17 (Aquifer & Surface) - A project that disturbs 1 acre or greater is required to secure an erosion 3/17/17 and sedimentation control plan and must comply with construction stormwater permit conditions (NCG010000) Footprint of project includes unnamed tributary to Sapony Creek Class C -- NSW in the Tar River basin. Riparian buffer rules DO apply to these stream features. The USGS Topographic map did depict topographic crenulations, indicating streams may be within or adjacent to the project footprint. (Note: the soil survey was not reviewed.) If wetland, riparian buffers or stream impacts are proposed, this project will need to comply with/secure a 404 permit from the USAGE, obtain a 401 Water Quallty Certification authorization and a riparian buffer authorization. & DWR-PWS NA ❑ NA DEMLR (LQ & SW) CDA ❑ 2/27/17 DWM — UST MRP 3/17/17 Other Comments I REGIONAL OFFICES Questions regarding these permits should be addressed to the Regional Office marked below. ❑ Asheville Regional Office ❑ Fayetteville Regional Office ❑ Mooresville Regional Office 2090 U.S. 70 Highway 22S Green Street, Suite 714, 610 East Center Avenue, Suite 301, Swannanoa, NC 28778-8211 Fayetteville, NC 28301-5043 Mooresville, NC 28115 Phone:828-296.4500 Phone:910-433-3300 Phone:704-663-1699 Fax: 828-299-7043 Fax: 910-486-0707 Fax: 704.663-6040 ® Raleigh Regional Office 3800 Barrett Drive, Raleigh, NC 27609 Phone:919-791-4200 Fax: 919-571-4718 ❑ Washington Regional Office 943 Washington Square Mall, Washington, NC 27889 Phone: 252-946-6481 Fax:252-975-3716 ❑ Winston-Salem Regional Office 450 Hanes Mill Road, Suite 300, Winston-Salem, NC27105 Phone: 336-776-9800. Fax:336-776-9797 ❑ Wilmington Regional Office 127 Cardinal Drive Ext., Wilmington, NC 28405 Phone:910-796-7215 Fax:910-350-2004 DEQ INTERGOVERNMENTAL REVIEW PROJECT Form Page 3 of 3 January2017/lbh 0 LL LL 0 r- r O �V O V M N NORTH CAROLIN A STATE CLEARINGHOUSE DEPARTMENT OF ,ADMINISTRATION � INTERGOVERNMENTAL REVIEW IL COUNTY c NASH H11 a ENERGY RRLATED FACILITIES/ACTIVTTIES MS RENEE GLEDHILL-EARLEY CLEARINGHOUSE COORDINATOR. DEPT OF NATURAL, & CULTURAL RESOURCE STATE 1:11STORIC PRESERVATION OFFICE MSC 461-7 - ARCHIVES DUILDING RALEIGH NC REVIEW DISTRIBUTION DEPT OF AGRICULTURE DEFT OF ENVIRONMENTAL QUALTTY DEPT OF NATURAL & CULTURAL RESOURCE DEFT OF TRANSPORTATION DNCR NATURAL HERITAGE PROGRAM DPS - DIV OF EMERGENCY MANAGEMENT UPPER COASTAL PLAIN COG PROJ'8CT INFORMATION APPLICANT: North Carolina Department of Commerce TYPE: State Environmental Policy Act Environmental Review 0 STATE DER: 1`7-E-4600-037 DATE RECEIVED: 02/20/2017 � AGENCY RESpoNsEP 03/17/2017 REVIEW CLOSED: 03/22/2017 LL LL 0 a DESC: Application of Fresh Air Energy II, LLC for Certificate to construct a 26 MW Solar Facility in Nash Co. Docket ##SP-2665, Sub 41. - View document at http://starwl.ncuc.net/NCUC/partal/ncuc/page/Dockets/portal.aspx, Type SP-2665 Sub 41 in the Docket Number search line. Located at 913 E. Nash Street, Spring Hope, NC The attached project has been submitted to the N. C. State Clearinghouse for -ntergovernmental review. Please review and submit your response by the above indicated elate to 1301 Mail Service Center, Raleigh NC 27699-1301. If additional review time is needed, Please contact this office at (919)807-2425. AS A RESULT OF THIS REVIEW THE FOLLOWIIVTG IS SUBMITTED: 9NO COMMENT ❑ COMMENTS ATTACHED SIGNED BY: DATE - RECEIVED Secretary's MAP S 0 209 (Xfice DOA