Loading...
HomeMy WebLinkAboutNC0085812_NOV-2021-LV-0088_20210217Strickland, Bev From: Basinger, Corey Sent: Wednesday, February 17, 2021 8:11 AM To: Scheller, Roberto Subject: FW: [External] NOV-2021-LV-0088 Response letter SIGNED Attachments: NOV-2021-LV-0088 Response letter SIGNED.pdf FYI From: Michelle McCarver [mailto:Michelle.McCarver@unioncountync.gov] Sent: Wednesday, February 17, 2021 7:58 AM To: Basinger, Corey <corey.basinger@ncdenr.gov> Cc: Andy Neff <andy.neff@unioncountync.gov>; Hyong Yi <Hyong.Yi@unioncountync.gov>; Josh Brooks <Josh.Brooks@unioncountync.gov>; Bart Farmer <bart.farmer@unioncountync.gov>; Greg Morgan <Greg.Morgan@unioncountync.gov> Subject: [External] NOV-2021-LV-0088 Response letter SIGNED CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. 1 is tip ai'/o .14 a l akaa EST. 1842 February 16, 2021 Department of Public Works Water/Wastewater Division 4600 Goldmine Road Monroe, NC 28110 T. 704-289-1434 F. 704-289-7395 www.unioncountync.gov W. Corey Basinger, Regional Supervisor NCDEQ 610 East Center Avenue, Suite 301 Mooresville, NC 28115 Dear Mr. Basinger, This letter is in response to NOV-2021-LV-0088 outlining the exceedance in monthly flow that was experienced at our Grassy Branch WRF in December 2020. This exceedance was a result of multiple rain events in the system (3.6" for the month) as well as the capacity issues we have discussed in previous conversations. In our meeting on 05/02/2019, we detailed our efforts in reducing the I&I that is entering the Grassy Branch collection system. Since that meeting our Collections team has continued working to improve the system. Such efforts include: • Smoke testing • Camera work and jetting • Visual inspections during rain events • Manhole rehab • Micro -metering In addition to the I&I reduction, we are in the process of obtaining a SOC agreement with NCDEQ and Union County in order to expand the plant. This will allow us to better address the capacity of the WRF to treat the flows. We intend to continue our efforts finding and reducing the I&I in the Grassy Branch basin even as we address the treatment/capacity issues at the Grassy Branch WRF. If you have any questions or concerns please contact me at 704-296-4215. Sincerely, Andrew Neff, PE Water & Wastewater Division Director Cc: Hyong Yi, Public Works Administrator Josh Brooks, Asst. Div. Director, Water & Wastewater Bart Farmer, WRF Superintendent Greg Morgan, Utility Services Superintendent