HomeMy WebLinkAboutNC0085812_NOV-2021-LV-0088_20210217Strickland, Bev
From: Basinger, Corey
Sent: Wednesday, February 17, 2021 8:11 AM
To: Scheller, Roberto
Subject: FW: [External] NOV-2021-LV-0088 Response letter SIGNED
Attachments: NOV-2021-LV-0088 Response letter SIGNED.pdf
FYI
From: Michelle McCarver [mailto:Michelle.McCarver@unioncountync.gov]
Sent: Wednesday, February 17, 2021 7:58 AM
To: Basinger, Corey <corey.basinger@ncdenr.gov>
Cc: Andy Neff <andy.neff@unioncountync.gov>; Hyong Yi <Hyong.Yi@unioncountync.gov>; Josh Brooks
<Josh.Brooks@unioncountync.gov>; Bart Farmer <bart.farmer@unioncountync.gov>; Greg Morgan
<Greg.Morgan@unioncountync.gov>
Subject: [External] NOV-2021-LV-0088 Response letter SIGNED
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
1
is tip ai'/o .14 a l
akaa
EST. 1842
February 16, 2021
Department of Public Works
Water/Wastewater Division
4600 Goldmine Road
Monroe, NC 28110
T. 704-289-1434
F. 704-289-7395
www.unioncountync.gov
W. Corey Basinger,
Regional Supervisor
NCDEQ
610 East Center Avenue, Suite 301
Mooresville, NC 28115
Dear Mr. Basinger,
This letter is in response to NOV-2021-LV-0088 outlining the exceedance in monthly flow that
was experienced at our Grassy Branch WRF in December 2020. This exceedance was a result
of multiple rain events in the system (3.6" for the month) as well as the capacity issues we have
discussed in previous conversations.
In our meeting on 05/02/2019, we detailed our efforts in reducing the I&I that is entering the
Grassy Branch collection system. Since that meeting our Collections team has continued
working to improve the system. Such efforts include:
• Smoke testing
• Camera work and jetting
• Visual inspections during rain events
• Manhole rehab
• Micro -metering
In addition to the I&I reduction, we are in the process of obtaining a SOC agreement with
NCDEQ and Union County in order to expand the plant. This will allow us to better address the
capacity of the WRF to treat the flows.
We intend to continue our efforts finding and reducing the I&I in the Grassy Branch basin even
as we address the treatment/capacity issues at the Grassy Branch WRF. If you have any
questions or concerns please contact me at 704-296-4215.
Sincerely,
Andrew Neff, PE
Water & Wastewater Division Director
Cc: Hyong Yi, Public Works Administrator
Josh Brooks, Asst. Div. Director, Water & Wastewater
Bart Farmer, WRF Superintendent
Greg Morgan, Utility Services Superintendent