Loading...
HomeMy WebLinkAboutWQCS00011_Renewal (Application)_20210223 ROCKY MOUNT WATER RESOURCES THE CENTER OF IT ALL RECEIVED February 12,2021 FB 2 3 2021 Brenton F. Bent NCDEQ/DWR/NPDES Director of Water Resources City of Rocky Mount 331 South Franklin Street Rocky Mount,NC 27804 PERCS Unit Supervisor Water Quality Permitting Section 1617 Mail Service Center Raleigh NC,27699 Subject: System-Wide Wastewater Collection System Permit Renewal City of Rocky Mount. Permit Number; WQCS00001 1 Dear Unit Supervisor, The city of Rocky Mount is hereby submitting for your review and approval all requested documentation pertinent to the renewal of the system-wide wastewater collection system permit. Attached to this cover letter you will find the following documents in their respective order: • Completed System Wide Wastewater Collection System Application Form(CSA 04-16) • Description of the organizational structure as required in Section V(1)(Collection System Administration) • Signed Delegation of Authority Letter • Pump Station List • High Priority Lines List • Annual Budget for Collection System • Capital Improvement Budget • Response Action Plan • Contingency Plan • Comprehensive Collection System Map Please let me know if you have any questions or require any additional information. Respectfully Submitted, 6W4- re trS on Bent Director I Water Resources (2521972-1121 / 331 S.Franklin St.,PO Box 1180,Rocky Mount,NC 27802-1180 / www.rockymountnc.gov State of North Carolina DVVR Department of Environmental Quality Division of Water Resources 15A NCAC 02T.0400-SYSTEM-WIDE WASTERWATER COLLECTION SYSTEMS Division of Water Resources INSTRUCTIONS FOR FORM CSA 04-16& SUPPORTING DOCUMENTATION Documents shall be prepared in accordance with 15A NCAC 02T .0100, 15A NCAC 02T .0400, and all relevant Division Policies. Failure to submit all required items will necessitate additional processing and review time. For more information, visit the System-wide Collection System Permitting website: General—When submitting an application to the Pretreatment,Emergency Response,&Collection Systems(PERCS)Unit, please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of requested additional information. The Applicant shall submit one original and one copy of the application and supporting documentation. RECEIVED A. Cover Letter FEB 23 2021 ❑ Submit a cover letter listing all items and attachments included in the permit application package NCDEQ/DWR/NPDE3 B. No Application Fee Required ➢ No application fee is necessary. The permittee will be billed an annual fee upon issuance of the permit ➢ The appropriate annual fee for systemwide wastewater collection system permits may be found at: ➢ Annual Non-Discharge Fees C. System-Wide Wastewater Collection System (FORM: CSA 04-16)Application: ❑ Submit the completed and appropriately executed System-wide Wastewater Collection System (FORM: CSA 04- 16) application. Any unauthorized content changes to this form shall result in the application package being returned. If necessary for clarity or due to space restrictions, attachments to the application may be made, as long as the attachments are numbered to correspond to the section and item to which they refer. ❑ If the Applicant Type in Section I.3 is a Privately-Owned Public Utility, provide the Certificate of Public Convenience and Necessity(CPCN)from the North Carolina Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the wastewater collection system, or ❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval is expected. ❑ If the Applicant Type in Section I.3 is a corporation or company, provide documentation if it is registered for business with the North Carolina Secretary of State. D. General Information: ➢ The Authorized signing official listed in Section I.4 should match with that of the Applicant certification page in accordance with 1 5A NCAC 02T .0106(b). Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T .0106(b). ➢ NOTE - Public Works Director's are not authorized to sign this permit application according to the rule unless they are delegated. INSTRUCTIONS FOR APPLICATION CSA 04-16&SUPPORTING DOCUMENTATION Page 1 of 5 E. Summary of Attachments Required: Ca Instruction A: Cover Letter 2 Instruction C: Application O Instruction C: Ownership Documentation (i.e. CPCN)(If necessary) E1 Instruction D: Delegation Letter(If necessary for signing official) ® Section IV.3 Pump Station List 6d' Section IV.4 High Priority Lines List • Section V.4 Annual Budget for Collection System (Updated and Approved) 21 Section V.6 Capital Improvement Plan (Updated and Approved) 2 Section VI.2 Response Action Plan 2 Section VI.4 Contingency Plan lid' Section VI.6 Comprehensive Collection System Map O Section VII Note Any Potential Compliance Issues THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND MATERIALS,SHOULD BE SENT TO: NCDEQ-DWR Water Quality Permitting Section PERCS UNIT By U.S. Postal Service: By Courier/Special Delivery: Attn: PERCS Unit Supervisor 512 N.SALISBURY ST.Suite 925 1617 MAIL SERVICE CENTER RALEIGH,NORTH CAROLINA 27604 RALEIGH,NORTH CAROLINA 27699-1617 TELEPHONE NUMBER: (919)807-6300 INSTRUCTIONS FOR APPLICATION CSA 04-16&SUPPORTING DOCUMENTATION Page 2 of 5 I. APPLICANT INFORMATION: 1. Applicant's name(Municipality,Public Utility,etc): CITY OF ROCKY MOUNT 2. Facility Information: Name: Rocky Mount Collection System Permit No.: WQCS000011 3. Applicant type: ® Municipal ❑ State ❑ Privately-Owned Public Utility ❑ County ❑Other: 4. Signature authori 's name: DONALD PERRY per 15A NCAC 02T.0106(b) �SiST 4 r Title: CITY ENGINEER 5. Applicant's mailing address:331 S. FRANKLIN STREET City: ROCKY MOUNT State:NC Zip:27802- 6. Applicant's contact information: Phone number:(252)972-1122 Fax number:(_) - Email address: Donald.perry@rockymountnc.gov II. CONTACT/CONSULTANT INFORMATION: 1. Contact Name:BRENTON BENT 2. Title/Affiliation: DIRECTOR OF WATER RESOURCES 3. Contact's mailing address: 331 S.FRANKLIN STREET 4. City: ROCKY MOUNT State:NC Zip:27802- 5. Contact's information: Phone number:(252)972-1299 Fax number:(_)_- Email address: Brenton.bent@rockymountnc.gov III. GENERAL REQUIREMENTS: 1. New Permit or Premit Renewal? ❑New ® Renewal 2. County System is located in: EDGECOMBE/NASH County 3. Owner&Name of Wastewater Treatment Facility(ies)receiving wastewater from this collection system: Owner(s)&Name(s): CITY OF ROCKY MOUNT CITY OF ROCKY MOUNT TREATMENT FACILITY 4. WWTF Permit Number(s): NC0030317 5. What is the wastewater type? 90%Domestic or 10%Industrial(See 15A NCAC 02T.0103(20)) �i Is there a Pretreatment Program in effect?®Yes or❑No 6. Wastewater flow: 14.62 MGD(Current average flow of wastewater generated by collection system) 7. Combined permitted flow of all treatment plants: 21.0 MGD 8. Explain how the wastewater flow was determined: ❑ 15A NCAC 02T.0114 or®Representative Data-PARTIAL FLUME AT EFFLUENT 9. Population served by the collection system: 80.000 IV. COLLECTION SYSTEM INFORMATION: APPLICATION CSA 04-16 Page 3 of 5 1. Line Lengths for Collection System: Sewer Line Description Length Gravity Sewer 412(miles) Force Main 24(miles) Vacuum Sewer 0(miles) Pressure Sewer 0(miles) 2. Pump Stations for Collection System: Pump Station Type Number Simplex Pump Stations(Serving Single Building) 1 Simplex Pump Stations(Serving Multiple Buildings) 0 Duplex Pump Stations 32 3. Submit a list of all major(i.e.not simplex pump station serving a single family home)pump stations. Include the following information: ➢ Pump Station Name ➢ Physical Location ➢ Alarm Type(i.e.audible,visual,telemetry,SCADA) ➢ Pump Reliability(Can convey peak hourly wastewater flow with largest single pump out of service) ➢ Reliability Source(permanent/portable generator,portable pumps) ➢ Capacity of Station(Pump Station Capacity in GPM) 4. Submit a list of all high priority lines according per 15A NCAC 02T .0402(2)known to exist in the collection system. Head the list with"Attachment A for Condition V(4)"and include the system name. ➢ Use the same line identification regularly used by the applicant ➢ Indicate type of high priority line(i.e.aerial),material and general location V. COLLECTION SYSTEM ADMINISTRATION: 1. Provide a brief description of the organizational structure that is responsible for management, operation and maintenance of the collection system. 2. Indicate the current designated collection system operators for the collection system per 15A NCAC 08G.020I Main ORC Name: NATHANIEL WILLIAMS Certification Number:989593 Back-Up ORC Name: JASON GLOVER Certification Number: 1001663 See the"WQCS Contacts and ORC Report"for a current listing of the ORC(s)the Division has on file for WQCS permit 3. Approximate annual budget for collection system only: $5,657,960 4. Submit a copy of your current annual budget. 5. Approximate capital improvement budge for the collection system only: $ 15,000,000 6. Submit a copy of your current capital improvement plan. 7. Is this collection system currently a satellite system ❑Yes or®No 8. Do any satellite systems discharge to this collection system®Yes or❑No(If yes complete table below) APPLICATION CSA 04-16 Page 4 of 5 Satellite System Contact Information(Name,Address,Phone Number) TOWN OF NASHVILLE RANDY LANSING-499 S. BARNES STREET NASHVILLE NC 27856 PHONE:252-45--4511 TOWN OF SHARPSBURG BRIAN SULLIVAN 110 W. RAILROAD STREET SHARPSBURG NC 27878 PHONE:252-908-3612 Complete for Satellite Systems that have a flow or capacity greater than 200,000 GPD(Average daily flow) 9. List any agreements or ordinances currently in place to address flows from satellite systems: Nashville service contract dated 5/13/1985 Expires 8/3/2025 Town of Sharpsburg Sewer Purchase Contract dated 12/6/2016 Expires 12/6/2056 VI. COLLECTION SYSTEM COMPLIANCE: 1. Is a Response Action Plan currently in place®Yes or❑No 2. If Yes,submit a copy of the Response Action Plan or see table 6 below. 3. Is a pump station contingency plan currently in place?®Yes or❑No 4. If Yes,submit a copy of the pump station contingency plan or see table 6 below. 5. Is a comprehensive collection system map currently in place? ®Yes or❑No 6. Submit a submit a copy of the collection system map(CD or hardcopy)or indicate a schedule for completion 7. Thoroughly read and review the System-Wide Collection System Permit Conditions. Typically compliance schedules are only offered to NEW permit applicants and NOT permit renewals. Any compliance dates must be included within the permit prior to issuance or the permit holder will be found in violation upon inspection. Current If no,Indicate a Typical Permit Condition Compliance Compliance Compliance? Date Schedule I(4)—Grease ordinance with legal authority to inspect/enforce ®Yes ❑No 12— 18 mo. I(5)— Grease inspection and enforcement program ®Yes ❑No 12— 18 mo. I(6)—Three to five year current Capital Improvement Plan. ®Yes ❑No 12— 18 mo. I(8)—Pump station contingency plan ® Yes ❑No 3 mo. I(9)—Pump station identification signs. ® Yes ❑No 3 mo. I(11)—Functional and conspicuous audible and visual alarms. ®Yes ❑No 3—6 mo. II(5)—Spare pumps for any station where one pump cannot handle peak flows alone(in a duplex station,the 2'pump is (ZI Yes ❑No 6—9 mo. the spare if pump reliability is met). II(7)—Accessible right-of-ways and easements. ® Yes ❑No 6— 12 mo. II(9)—Response action plan with Items 9(a—h). ®Yes ❑No 3 mo. III(3)—Comprehensive collection system map ®Yes ❑No 10%per year For conditions not listed,compliance dates are not typically offered. List any permit conditions that may be difficult for the applicant to meet(attach clarification if needed): APPLICATION CSA 04-16 Page 5 of 5 VII. APPLICANT'S CERTIFICATION per 15A NCAC 02T.0106(b): 1, 00 Ar (..60 M F(%(AY attest that this application for c vr( or ocloi M Q U,ty (Signature Authority's Name&Title from Item I.4) (Facility name from Item I.1) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included,this application package will be returned to me as incomplete. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to$25,000 per violation. �� Date: DZ-t 2-2 Signature: — / APPLICATION CSA 04-16 Page 6 of 5 v-. /11 ROCKY MOUNT WATER RESOURCES THE CENTER OF IT ALL Section V:Collection System Administration Provide a brief description of the organizational structure that is responsible for management, operation and maintenance of the collection system The collection system has a staff complement of fifteen(15)full time permanent employees to include Construction Workers,Heavy Equipment Operators,Pump Station Mechanics,Crew Supervisors, General Supervisor and the Superintendent.The Director of Water Resources is responsible for the overall financial management,while the Water and Sewer Superintendent and the team noted in the organizational chart below is responsible for the daily management,operation and maintenance of the system Water Resources Director Brenton Bent Water&Sewer Superintendent Nate Williams Administrative Secretary Tina Manning General Supervisor Operations Jason Glove Lift Station Collection Supervisor Supervisor Barry Griffin Blake Winstead Construction Supervisor Crew Supervisor Jeff Fogleman Blake Fuller (252)972-1121 / 331 S.Franklin St.,PO Box 1180,Rocky Mount,NC 27802-1180 / www.rockymountnc.gov tt��,�✓V►ew . 1 1 6-0 ROCKY MOUNT CITY MANAGER'S OFFICE THE CENTER OF IT ALL January 14,2021 Rochelle D. Small-Toney City Manager City of Rocky Mount 331 South Franklin Street Rocky Mount,NC 27804 NCDEQ-DWR • Water Quality Permitting Section PERCS UNIT 1617 Mail Service Center Raleigh,NC 27699-1617 Subject: Delegation of Signature Authority System-Wide Wastewater Collection System Application System Permit No. WQCS000I I To Whom It May Concern: By notice of this letter, I hereby delegate signatory authority to each of the following individuals for all permit applications,reports,and all other information relating to the operations of the city of Rocky Mount's Wastewater Collection System as required by all applicable federal, state, and local environmental agencies specifically with the requirements for signatory authority as specified in 15A NCAC 02T.0106(b), Donald Perry Brenton F. Bent City Engineer Director of Water Resources 331 South Franklin Street 331 South Franklin Street PO Box 1 180 PO Box 1180 Rocky Mount,NC 27802 Rocky Mount,NC 27802 Donald.perry@rockymountnc.gov Brenton.bent@rockymountnc.gov Office:252-972-1122 Office: 252-972-1299 Mobile: 252-230-7937 Mobile: 252-567-6844 If you have any questions regarding this letter,please feel free to contact me at 252-972-1331. Sincer ly, .4,72,47 ochelle D. Small-Toney cc: NC DWR Raleigh Regional Office, Water Quality Permitting Section (252)972-1325 l 331 S_Franklin St-,PO Box i 18o,Rocky Mount,NC 27E2 1180 I www.tockymountnc.gov IV.3 Number Pump Station Name Physical Location GPS Coordinates Alarm Type Pump Reliability Reliability Source Capacity Of Station(GPM) 1 Arbor Lane 930 Bethlehem Road 35.933238,-77.825407 Audible,Visual and SCADA Yes Permanent Generator 285 0 Belaire 3103 Marshland Drive 35.913470,-77.838543 Audible,Visual and SCADA Yes Permanent Generator 400 32 Bloomer Hill 9819 N US 301 Hwy,Whitakers 36.096090,-77.724865 Audible,Visual and SCADA Yes Permanent Generator 500 Brook Valley 144 N Halifax Road 35.966923,-77.871248 Audible,Visual and SCADA Yes Permanent Generator 1300 CDC 9819 N US 301 36.095437,-77.726139 Audible,Visual and SCADA Yes Permanent Pump 900 Church St 1101 N Church Street 35.957332,-77.790634 Audible,Visual and SCADA Yes Permanent Generator 1800 Cokey Rd 200 Parrish CT 35.921739,-77.782539 Audible,Visual and SCADA Yes Permanent Generator 265 Cooley Rd 107 Cooley Road 35.904449,-77.813283 Audible,Visual and SCADA Yes Permanent Generator 260 Deer Run 9886 NC 97 WEST 35.985240,-77.734738 Audible,Visual and SCADA Yes Permanent Generator 250 Drake 8077 Red Oak Battleboro Road 36.038386,-77.817885 Audible,Visual and SCADA Yes Permanent Generator 200 Edinburg 1100 Irene Lane 35.972178,-77.839650 Audible,Visual and SCADA Yes Permanent Generator 175 Flag Marsh 2809 Shreve Road 35.950823,-77.739164 Audible,Visual and SCADA Yes Permanent Generator 325 Fenner Rd 1699 Fenner Road 35.999880,-77.788273 Audible,Visual and SCADA Yes Portable Generator 280 Gold Rock 7370 NC 4,Battleboro 36.060418,-77.812640 Audible,Visual and SCADA Yes Permanent Generator 300 Greyson Grove 1206 Grove Drive 36.002971,-77.804056 Audible,Visual and SCADA Yes Portable Generator 150 Harper St 1741 Harper Street 35.961202,-77.768783 Audible,Visual and SCADA Yes Permanent Generator 280 Hillsdale 1420 Hillsdale Drive 35.955330,-77.774615 Audible,Visual and SCADA Yes Permanent Generator 200 Johnson St 1101 Johnson Street 35.921655,-77.786511 Audible,Visual and SCADA Yes Permanent Generator 550 Leggett Rd.I 1741 Leggett Road 35.963090,-77.758381 Audible,Visual and SCADA Yes Permanent Generator 110 Leggett Rd.II 2013 Leggett Road 35.964123,-77.749358 Audible,Visual and SCADA Yes Permanent Generator 130 MB Hubbard 7917 Red Oak Battleboro Road 36.038250,-77.821793 Audible,Visual and SCADA Yes Permanent Generator 385 Merita 2681 N Church Street 35.977886,-77.783579 Audible,Visual and SCADA Yes Permanent Generator 1080 Nash Community College 522 N Old Carriage Road(NCC) 35.975572,-77.899147 Audible,Visual and SCADA Yes Permanent Generator 260 Nash Central 4279 Nash Central High Road 35.952639,-77.893160 Audible,Visual and SCADA Yes Permanent Generator 200 Old Mill Rd 800 Old Mill Road 35.944926,-77.835651 _Audible,Visual and SCADA Yes Permanent Generator 680 Sharpsburg 3321 S Wesleyan Blvd.(301 N) 35.876541,-77.823671 Audible,Visual and SCADA Yes Permanent Generator 450 Veterans Ct 130 Veterans Circle 35.948192,-77.775249 Audible,Visual and SCADA Yes Permanent Generator 160 I Village Rights 11754 Johnston Road 36.093787,-77.744598 Audible,Visual and SCADA Yes Permanent Generator 400 Walker Town 5384 N Hathaway St.Battleboro 36.053922,-77.749931 Audible,Visual and SCADA Yes Permanent Generator 220 Walter Drive 212 Walter Drive,Battleboro 36.043382,-77.738045 Audible,Visual and SCADA Yes Permanent Generator 200 Webbs 948 S Wesleyan Blvd.(301 S) 35.926375,-77.831047 Audible,Visual and SCADA Yes Permanent Generator 200 Westry Crossing 729 Daffodil Way 35.963172,-77.891095 Audible,Visual and SCADA Yes Permanent Generator 200 ttachment A for Condition V(4)" City of Rocky Mount"High Priority"lines Location Type MLK PARK-INVERTED SIPHON Aerial INTERSECTION OF SHEARIN ST&OLIVE ST IN DITCH Aerial DEADEND OF MATTHEW ST IN DITCH CROSSING TO HOLLY ST Aerial DEADEND OF SCOTT ST ACROSS DITCH TO PUMP STATION Aerial IN MLK PARK ONE VIRGINIA ST IN DITCH Aerial DEADEN°OF SPRINGBROOK DR TO VIRGINIA ST ON BIKE PATH Aerial RALEIGH ST BEHIND ADVANCED AUTO IN DITCH Aerial RALEIGH ST BESIDE FAMILY DOLLAR IN DITCH Aerial BEHIND DOLLAR STORE ON RALEIGH ST ON RIGHT OF WAY Aerial DEADEND OF CARLTON AVE IN DITCH Aerial BEHIND 1800 VERNON RD IN DITCH Aerial BEHIND 852 LINCOLN DRIVE BESIDE FENCE Aerial BEHIND 724 LINCOLN DR IN DITCH Aerial SUTTON RD IN DITCH BY OUTFALL AT CABINET SHOP Aerial SUTTON RD ON RIGHT OF WAY BETWEEN TRANSFORMER AND VANCE ST Aerial 406 KINGSTON AVE-BEHIND HOUSE IN DITCH Aerial OUTFALL AT END OF AZALEA IN DITCH NEAR HWY 301S Aerial CLANCY CT ON OUTFALL Aerial 1509 WEST MOUNT DR-BETWEEN BUILDING AND OUTFALL IN DITCH Aerial HWY 301S AT THE MAPLE CREEK BRIDGE Aerial INTERSECTION OF MAY DR&HWY 301 S ON OUTFALL IN DITCH Aerial BEHIND 1738 LAFAYETTE CIR AT THE TAR RIVER POND Aerial BEHIND 400 WILDWOOD AVE IN EDGE OF TAR RIVER POND Aerial 3220 ZEBULON RD-BEHIND IN STONEY CREEK Aerial 3112 WELLINGTON DR IN DITCH Aerial S WINSTEAD AVE BESIDE SPRING ARBOR RETIREMENT HOME IN DITCH Aerial BEHIND 2108 EDINBOROUGH RD IN DITCH Aerial 1201 NOTTINGHAM DR-BESIDE IN DITCH Aerial 3000 BRASSFIELD DR-BEHIND IN DITCH Aerial 121 JONES RD-IN DITCH BEHIND HOUSE Aerial BEHIND 313 DELANE DR CROSSING STONEY CREEK TO CREEKSIDE DR Aerial BEHIND 137 CANDLEWOOD DR CROSSING STONEY CREEK TO CREEKSIDE DR Aerial ENO OF ABBEY RD ON OUTFALL CROSSING STONEY CREEK Aerial ABBEY RD DOWN PATH AFTER 3197 IN DITCH Awl 161 ENGLISH RD-ON RIGHT OF WAY IN DITCH Aerial BEHIND CRACKER BARREL ON OUTFALL TO IRENE LN Aerial 976 N WINSTEAD AVE-BEHIND BUILDING Aerial AT END OF GOOSE BRANCH ROW-BESIDE FENCE IN DITCH Aerial HUNTER HILL RD&NOELL DR BEHIND RBC CENTURA IN DITCH Aerial COUNTRY CLUB DR BESIDE MOOSE LODGE CROSSING STONEY CREEK Aerial INTERSECTION OF NORTHERN BLVD&RAPER DR IN DITCH Aerial BRIDGEW00D DR-AT CREEK Aerial KATHERINE TRL-AT DEAD END Aerial STONERIDGE LN-AT END ON OUTFALL Aerial JEFFREYS RD AT JEFFREYS CT IN DITCH Aerial 1800 BOB WHITE LN-BEHIND ON SEWER OUTFALL Aerial BEHIND 669 GOLDROCK RD ACROSS FROM BEAVER POND SUED ON SEWER OUTFALL Aerial GOLD ROCK RD&BEAVER POND ON OUTFALL IN DITCH Aerial ACROSS STREET FROM 199 CUNNINGHAM DR IN DITCH Aerial BEHIND 631 GREYSON RD IN DITCH Aerial BEHIND 605 EAGLES TERRACE IN DITCH Aerial DEADEND OF EAGLES TERRACE IN DITCH Aerial BEHIND 708 SHORTSPOON DR ACROSS FAIRWAY IN DITCH Aerial BEHIND 662 TIFFANY SQUARE APTS-IN DITCH IN WOODS Aerial BESIDE MAYFLOWER ON HWY 301 IN DITCH Aerial HWY 301&CONSTRUCTION DR-IN DITCH Aerial FOUNTAIN SCHOOL RD BETWEEN HWY 301&RR TRACKS IN DITCH Aerial HWY 4 BESIDE GOLD ROCK LIFT STATION IN DITCH Aerial NC HWY 4 BEHIND MCLANE DIST CENTER ON OUTFALL Aerial BEHIND CRAPE MYRTLE DR BESIDE RAILROAD TRACKS IN DITCH ON OUTFALL Aerial E BATT LEBORO RD-BESIDE CEMETERY DRIVEWAY IN DITCH Aerial ACROSS FROM 10717 NC 97E IN DITCH BESIDE BARNHILL ASPHALT PLANT Aerial BESIDE 11048 NC 97E IN DITCH Aerial N CHURCH ST BEHIND BEST WESTERN MOTEL IN DITCH Aerial Al CHURCH ST BETWEEN RR TRACKS AND BARCOLOUNGER AT ENCASEMENT Aerial BARNUM RD-ON ROW BESIDE WAREHOUSE Aerial N CHURCH ST BEHIND ANIMAL SHELTER IN DITCH Aerial RIVERSIDE DR BEHIND JACKS USED CARS IN DITCH Aerial END OF 900 COLUMBIA AVE IN DITCH Aerial BATTLE PARK BETWEEN WOODEN BRIDGE AND FALLS RD Aerial BATTLE PARK IN DITCH BY WOODEN BRIDGE Aerial BETWEEN N CHURCH ST.AND R.R TRACKS AT END OF W VIRGINIA ST.IN DITCH Aerial OFF OF COUNTRY CLUB RD AT CURVE IN CREEK Aerial MAERIAL BETWEEN 1221 PAUL ST &NASHVILLE RD IN DITCH Aerial 122/2013 V. � DIVISION SUMMARY(FY 2021Adoprc`d) Sewer Services Description The Sewer Services Division is responsible for the successful supervision and maintenance of approximately 425 miles of sanitary system collection mains,5,500 manholes,and 36 sewer lift stations. Also under their charge is daily surveillance of compliance in the City of Rocky Mount's Sewer Use Ordinance and Fat, Oils,and Grease Program.The measures of successful operation are set forth in our NC DWQ Collection System Permit of which this Division is in responsible charge. FY 2021 Overview The Sewer Services division prepared a fiscally responsible budget for FY 2021. Efforts will continue to reduce incidents of sanitary sewer overflows (SSO) in the collection system through the rehabilitation and replacement of aged sewer lines and manholes.Capital Improvement Projects will also seek to address capacity at the Johnson Street lift station. FY 2020 Highlights • FY2020 saw the continuation of several important infrastructure projects to include manhole rehabilitation and Cured in Place Pipe(CIPP)relining.This effort was consistent with the state mandated requirement to inspect and clean a minimum of 10% of sewer system annually. City-Aligned Objectives&Performance Measures Objective: Aligned Department Goal: Maintain the threshold of unbilled sewer(inflow&infiltration)to less than 40%. Continue an aggressive program to bring inflow/infiltration in the sewer system to a more acceptable level and to reinvest in water and sewer related infrastructure to improve performance and system reliability x ti a 3{ ?L 4 dry* t FY 2019 V FY-zoom't S FY 2020' > , FY 2021 r'' Performance Measure fi7,*Actu'al Adop'tedS ; s1ProlectedE, 4u 3`Adoptedr'; Sewer Manholes Rehab/Repair. The previous 31 31 31 31 numbers were manholes repaired,the new entry is actual footage of manholes combined. Sewer mains TV'ed(Feet) 50,600 65,000 60,000 Sewer Mains Smoke Tested(Miles)annual goal 4.3 4.3 4.3 will be 1%of entire collection system. Objective: Aligned Department Goal: Maintain collections system with minimal interruptions and SSO's Continue an aggressive program to bring inflow/infiltration in the sewer system to a more acceptable level and to reinvest in water and sewer related infrastructure to improve performance and system reliability f 201 y;'> - ,tFY2020 ? '� FY 2020, `t' s L 2021vg Performance Measure <t�` Actual { J 'Adopted Protected' " Adopted Sewer Main Cleaned(Linear Feet) 223,000 230,000 240,000 230,000 5-38 6£-9 I £ II sayso/A uOTaansasuo3 0i - I isuaasaaS anrausasTUTUTp\r II - Z orut goalq uopuaS dwnd ZI - Z soaesad0 auawdrnbg AnraI-I Zi - Z ueTanayoal,ao!nlaS sawoasnJ ZI - i sosrnsadnS masD £I - I sosrnsadns uoponsasuoJ 32m3S 79 saatiA\ bi - I sosrnsadns uonoanoD samaS 9I - I sosrnsadnS aauLuaauN uopeaS dwnd 91 - I suopesadp samaS J8 saaT:A/xosrnsadns IesauDO IZ Uazos j# pazrsagan\T# awl atuuli istr aucjels uolsrnrq OZI`LL4 096'LS9`S 88I`6£6'4 6£8`£80`S 0£8'08I`S 64Z`665'4 moy uols!nla OS4`SZ8 OLO`9££`£ Z6£`L8VZ OZ9`015`Z OZ9`Ols`Z LS8'890`Z agaey;)aa!,uoS aApens!u!wpV 000'06 805118 000'OG 000'OG 869`Z8 aa,l aal.uati 41llnC1 (OOS`££) 000'54 Z8S'84 656'84 0OS`8L 6£9`06 depnQ lcr!dup (009'54Z) 004"11:L £5G`I96 OSZ`1:86 006'996 91,9'646 a3FuaSTgaCI 000'99 6££`LL 0017'16 000`99 IL0`Z9 s1199u4900 (OOZ`Z4) 040`£05 48L`641, 06S`Z£S O4Z`545 1.84'SIS sosuods;l:lunuad0 - - - OOL`£l sa,!Ans(euo!ssajoad O90'9 OSO`6ZZ 1L84L6I 064'SIZ O(6 ZZZ Z£L'OOZ srgoua41 a)Aoldws_l (080'££) OOS'L99 6SL`119 O8S'Z19 08S'OOL 8l4'519 alum Nsauelet aauaaapld paldopV Iemz v papuaury paldopV lenroy 4102areD 'Mfg Ad OZOZ Ad OZOZ Ad OZOZ Ad 6IOZ Ad AL70$01e0 Aq sam tpuadxg saapuaS zannas {n?,dopvrzoz,[.al AIIVIAIb1inS MOISIAIG DIVISION EXPENDITURES(FY 2021 Adopted) Sewer Services FY 2019 FY 2020 FY 2020 FY 2020 FY 2021 Account Actual Adopted Revised Actual Adopted Difference Salaries&Wages SALARIES&WAGES 549,680 646,980 558,980 549,398 605,190 (41,790) WAGES-OVERTIME 24,063 13,500 13,500 25,772 30,000 16,500 WAGES-STANDBY 13,357 13,000 13,000 16,810 13,000 - WAGES-PART"111vME 1,834 4,000 4,000 - 2,000 (2,000) WAGES-LONGEVITY 26,483 23,100 23,100 19,779 17,310 (5,790) Salaries&Wages Total 615,418 700,580 612,580 611,759 667,500 (33,080) Employee Benefits FICA-EMPLOYERS SHARE 43,939 52,070 52,070 43,200 47,230 (4,840) RII'I'IRIEMEN'I' 48,139 51,050 51,050 55,369 62,940 11,890 RETIREMENT-401K GENERAL 16,480 20,420 20,420 16,948 19,410 (1,010) INSURANCE-HOSPITAL 79,685 93,450 85,950 80,273 93,450 - INSURt\NCE-LIFE 1,084 1,280 1,280 1,102 1,300 20 WORKERS COMPENSATION 10,685 4,000 4,000 177 4,000 - CELLULAR TELEPHONE.ALLOWANCE 720 720 720 803 720 - Employee Benefits Total 200,732 222,990 . 215,490 197,871 229,050 6,060 Professional Services TEMPORARY HELP SERVICES 13,700 - - - - _ Professional Services Total 13,700 - - - - - Operating Expenses UNIFORMS i 3,144 3,000 3,100 3,015 5,000 2,000 FUEL, 53,397 60,400 55,400 40,517 48,320 (12,080) SMALL.,TOOLS 1,229 2,500 2,500 2,318 2,250 (250) SUPPLIES-SEWER 111,591 70,000 65,000 65,752 70,000 - '1'RAVEL.MILEAGE REIMBURSEMENT - 200 - - 50 (150) TRAVEL-CONFERENCE/SCHOOLS 3,656 4,500 2,800 2,703 1,120 (3,380) UTfLI'l'IES 161,102 152,000 152,000 146,155 150,000 (2,000) REPAIRS-STREETS 26,265 75,000 65,000 22,289 60,000 (15,000) REPAIRS-BUILDING 5,111 25,000 1,000 545 5,000 (20,000) REPAIRS-EQUIPMENT 8,750 10,000 4,000 3,472 10,000 - REPAIRS-RADIO 10,374 8,740 8,740 8,409 17,400 8,660 REPAIRS-PUMP 56,649 71,500 66,500 55,844 71,500 - REPAIRS-VEHICLE 74,219 61,000 105,100 98,674 61,000 - PERMI'1'S - 1,400 1,400 90 1,400 - Operating Expenses Total 515,487 545,240 532,540 449,784 503,040 (42,200) Obligations MAIN'l'&SERVICE CON'l'RACI' 56,091 55,000 87,900 76,834 55,000 - MAINT'ENANCE-TECH SOF1'WARI. 5,980 6,000 1,000 505 6,000 - DAMAGES&JUDGI'21MEN'1:S - 5,000 2,500 - 5,000 - Obligations Total 62,071 66,000 91,400 77,339 66,000 - Debt Service LEASE PAYMENTS 193,413 331,000 346,350 346,147 491,200 160,200 LEASE PYM'I'S-I EXCAVATOR 42,666 - - - - - LEASE PYM'I:S-SYSTEM UPGRADES 713,567 635,900 635,900 635,807 230,100 (405,800) Debt Service Total 949,646 966,900 982,250 981,953 721,300 (245,600) Capital Outlay MOTOR VEIIICI..ES 42,882 25,000 29,559 29,559 - (25,000) OTHER EQUIPMENT 35,600 30,000 17,042 16,665 30,000 - SEWER EQUIPMENT 12,157 16,500 2,358 2,357 15,000 (1,500) BI.,DGS STRUCTURES IMPROVE - 7,000 - - - (7,000) Capital Outlay Total 90,639 78,500 48,959 48,582 45,000 (33,500) 5-40 V G CIP OVERVIEW (FY 2021 Adopted Budget) Water Resources - Sewer Current Year 1 2021-2025 CIP Funding Period I FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Revenues Enterprise Fund 1,374,000 1,188,000 1,813,000 858,000 1,410,000 1,075,000 5,010,300 6,344,000 Installment Debt 1,312,400 1,835,000 2,360,000 3,060,000 1,310,000 170,000 10,689,250 8,735,000 Project Loan - - - 3,250,000 - - - 3,250,000 Fund Balance 2,955,000 900,000 2,000,000 - - - - 2,900,000 Total Revenues $5,641,400 $3,923,000 $6,173,000 $7,168,000 $2,720,000 $1,245,000 $15,699,550 $21,229,000 Major Capital Investment Projects & Council Priorities (Order of Priority) 1 Springfield Road Widening-U-4762-Utility Coordination 600,000 - - - - - 600,000 2 Johnson Street Pump Station Rehab - 1,000,000 - - - - - 1,000,000 3 Wastewater Treatment Plant Road Paving - 540,000 - 500,000 - - 1,040,000 4 Replace Backwash Troughs for Tertiary Filters 260,000 - - - - - 260,000 11 5 WWTP Switch Gear 300,000 200,000 200,000 - - - - 400,000 6 Electrical Control Cabinets,Tertiary and Rectangular Clarifiers 200,000 300,000 - - - - - 300,000 7 Tertiary Filter Rehab 60,000 120,000 - - - - - 120,000 8 Basin C Grit Collector Encasement - 75,000 - - - - - 75,000 9 Retangular Clarifiers Festoon - 60,000 - - - - - 60,000 10 Beech Branch Outfall Rehabilitation 2,300,000 - 2,000,000 - - - - 2,000,000 11 Screw Pump Replacement 624,000 - 350,000 - - - - 350,000 12 Old Mill Rd Pump Station - - 1,500,000 - - - - 1,500,000 13 Blowers and Motor Inspection/Rehabilitation-VPSA system - - 70,000 - - - - 70,000 14 54"Outfall Rehabilitation - - - 2,250,000 - - - 2,250,000 15 Sharpsburg Pump Station - - - 1,000,000 - - - 1,000,000 16 Arbor Lane Pump Station - - - 1,000,000 - - - 1,000,000 17 Concrete Repairs on Basins and Clarifiers - - - 1,000,000 - - - 1,000,000 18 Replace Gearboxes on Screw Pumps - - - - 500,000 - - 500,000 19 Roof Replacement for Administration Building at WWTP - - - - - 350,000 - 350,000 20 SC:Maple Creek Pump Station and Forcemain - - - - - - 3,400,000 - 21 Gold Rock Lift Station Rehab - - - - - - 3,000,000 - 22 AMR/AMI Metering Project(Sewer) - - - - - - 2,500,000 - 15-Jan-2021 16:02 Sewer-1 CIP OVERVIEW (FY 2021 Adopted Budget) Water Resources - Sewer Current Year I 2021-2025 CIP Funding Period I FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total 23 Replace Webbs Lift Station - - - - - - 1,500,000 - 24 SC:Compass Creek Outfall,Phase 2 - - - - - - 1,300,000 - 25 SC:Cokey Road/Glendale Drive Sewer(Former Annex Area 7B) - - - - - - 600,000 - 26 Johnson Street Force Main - - - - - - 500,000 - 27 Leggett Park Sanitary Sewer Improvements,Phase 3 - - - - - - 382,550 - 28 SC:Grape Branch Sewer - - - - - - 267,000 - 29 WWTP Generators,PURPA Additions - - - - - - 250,000 - 30 SC:College Road Sewer(Formerly Annex Area 4A) - - - - - - 175,000 - 31 Ash Pond Mitigation - - - - - - 150,000 - 32 WWTP SCADA - - - - - - 100,000 - 33 Scum Trough Replacement - - - - - - 100,000 - 34 WWTP Storage Shelter - - - - - - 85,000 - 35 Hypochlorite System 799,000 - - - - - - - 36 Wesleyan Boulevard Widening Utility Relocation and Betterment 455,000 - - - - - - - 37 NC 97 Switch Gear 115,400 - - - - - - - Annual Capital Maintenance (Order of Funding, by Yearl Aeration Basin Rehabilitation - 375,000 525,000 680,000 550,000 - - 2,130,000 Sewer Automated Meter Reading 250,000 350,000 350,000 350,000 350,000 350,000 800,000 1,750,000 Sewer Rehabilitation Program 250,000 250,000 250,000 250,000 300,000 300,000 300,000 1,350,000 Sewer Asset Management Plan - 150,000 145,000 150,000 150,000 - 145,000 595,000 SC:Minor Enhancements and Main Extensions 75,000 75,000 75,000 75,000 75,000 75,000 75,000 375,000 Back up Compressor for the Vacuum Pressure Swing Absorption(VPSA)Oxygen System - 75,000 - - - - - 75,000 Computerized Maintenance Management System(CMMS)Acquisition and Implementation(Sewer) - 33,000 33,000 33,000 35,000 - - 134,000 Construction Equipment-Sewer 98,000 - 135,000 380,000 260,000 170,000 - 945,000 Vertical Turbine Pump/Motor Replacements - - - - - - 70,000 - C&D RAS pump rehab 65,000 - - - - - - - Chlorinator&Sulfonator Replacement 50,000 - - - - - - - Total Expenditures $5,641,400 $3,923,000 $6,173,000 $7,168,000 $2,720,000 $1,245,000 $15,699,550 $21,229,000 15-Jan-2021 16:02 Sewer-2 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Springfield Road Widening - U-4762 - Utility Coordination Description Widening of Springfield Road from US 64 Business to Legget Road Justification Category 05-Current level of service cannot be continued unless work is done Past Progress FY2017 - Utility Coordination planning FY2018-Project to be let, Construction to begin Current& Future Plans FY2021 - Payment scheduled Current I 2021-2025 CIP Funding Period l Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Fund Balance - 600,000 - - - - - 600,000 Total Revenues S. $600,000 $- $- 5- $- $- $600,000 Current i 2021-2025 CIP Funding Period i Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction - 600,000 - - - - - 600,000 Total Expenditures $- $600,000 $- $- $- $- $- $600,000 15-Jan-2021 16:19 Sewer-3 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Johnson Street Pump Station Rehab Description Based on 2019 engineering study, this pump station is operating at its maximum capacity and requires a timely upgrade. This is an area of the city that is at risk for sanitary sewer overflows and an upgrade would negate/reduce these incidents. Justification This project will also support the upcoming housing development planned for the town of Sharpsburg which if not address has the potential to overload the pump station. Category 07- Extends life of facility more than five (5)years Current l 2021-2025 CIP Funding Period Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Installment Debt - 1,000,000 - - - - - 1,000,000 Total Revenues $- $1,000,000 $- S- S- s- $- $1,000,000 Current I_, * 2021-2025 CIP Funding Period — Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction - 1,000,000 - - - - - 1,000,000 Total Expenditures $- $1,000,000 $- 5- $- $- $- $1,000,000 15-Jan-2021 16:19 Sewer-4 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Wastewater Treatment Plant Road Paving Description This project will continue the repaving of roads within the Wastewater Treatment Plant (WWTP). Light duty roads were built in 1980 when the plant was constructed. Sub-grade needs work as well as repaving roads surfaces. Now 75,000 pound tractor trailers which haul sludge and septage travel these roads and the wear and tear has become extensive. Justification Project is consistent with the Community Facilities Section of the Comprehensive Plan; Objective B-1 in that it provides for utility master planning for expansion and maintenance needs. Category 10- Expansion of service is deemed necessary Past Progress FY2018-Additional paving work. FY2018 - Request delay on paving until FY19 due to electrical upgrade project. FY2020 - Infrastructure maintenance has been postponed for several years and failures are becoming more and more pronounced. Project year cost increases reflect the additional failures which will need additional attention. Current I 2021-2025 CIP Funding Period Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Enterprise Fund - - 540,000 - 500,000 - - 1,040,000 Total Revenues $- $- $540,000 $- $500,000 $- $- $1,040,000 Current I 2021-2025 CIF Funding Period t Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction - - 540,000 - 500,000 - - 1,040,000 Total Expenditures $- $- $540,000 $- $500,000 $- $- $1,040,000 15-Jan-2021 16:19 Sewer-5 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Replace Backwash Troughs for Tertiary Filters Description There are six (6) backwash troughs that carry the water that is backwashed up through the tertiary filters to a line that goes back to the head of the plant. These troughs were originally made of carbon steel and have been regularly painted. The inside of the troughs handles water with a high grit content which results in wear and tear. Justification Troughs are approximately 30 years old and the carbon steel is significantly worn and corroded. The plan is to replace the troughs with stainless steel which is more durable. Project is consistent with the Community Facilities Section of the Comprehensive Plan; Objective B-1 in that it provides for utility master planning for expansion and maintenance needs. Category 06- Current level of service cannot be assured unless work is done Current l 2021-2025 CIP Funding Period t Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Installment Debt - 260,000 - - - - - 260,000 Total Revenues $- $260,000 S- $- $- $- $- $260,000 Current i 2021-2025 CIP Funding Period 1 Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction - 260,000 - - - - - 260,000 Total Expenditures S- $260,000 $- E- $- $- S. $260,000 15-Jan-2021 16:19 Sewer-6 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer WWTP Switch Gear Description The switch gear at the WWTP has experienced significant corrosion to its internal components over the years. The potential for electrical failure at the screw pumps is high and requires a rebuilt or replacement project to address this concern immediately. Justification As determined by the asset management study, reliability of the electrical system at the plant is of the highest priority. Failure of this system will render the plant useless which potentially could create widespread sewer overflows and damages to property. Category 06-Current level of service cannot be assured unless work is done Past Progress FY2018-Cost estimate was submitted by Engineering Firm FY2020- Bids were received in FY 19 but due to the high cost, the project was delayed wit the intention to rebid in three phases in the Spring of 2020 Current 2021-2025 CIP Funding Period Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Installment Debt 300,000 200,000 200,000 - - - - 400,000 Total Revenues $300,000 $200,000 $200,000 $- $- $- $- $400,000 Current 2021-2025 CIP Funding Period Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Equipment/Furnishing 300,000 200,000 200,000 - - - - 400,000 Total Expenditures $300,000 $200,000 $200,000 $- S. $- $- $400,000 15-Jan-2021 16:19 Sewer-7 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Electrical Control Cabinets,Tertiary and Rectangular Clarifiers Description All cabinets, Eight (8) Tertiary and Four (4) Rectangular Clarifiers have exceeded their expected lifespan. The existing technology(switches and relays) must be upgraded to newer electronic systems in all cabinets Justification The Asset Management Study identified the electrical system at the Wastewater Plant as the most critical of all assets. This project seeks to rehabilitate these hard use pieces of electrical control equipment to maintain the electric grid throughout a key portion of the treatment process. Category 06-Current level of service cannot be assured unless work is done Current 1 2021-2025 CIP Funding Period 1 Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Fund Balance 200,000 300,000 - - - - - 300,000 Total Revenues $200,000 $300,000 $- $- S. $- $- $300,000 Current I 2021-2025 CIP Funding Period Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Equipment/Furnishing 200,000 300,000 - - - - - 300,000 Total Expenditures $200,000 $300,000 $- $- $- $- $- $300,000 15-Jan-2021 16:19 Sewer-8 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Tertiary Filter Rehab Description The third treatment method of wastewater are beds of several size media that performs a final filtration prior to disinfection. We have added media over the years as needed to the final filters and the media size ratio has been altered to a point whereby the gallons/square foot design flows have dropped below the facilities treatment capacities. On high flow days, this will cause staff to by-pass the final filters with a portion of the flow. Areas of deterioration in the media containment have also become evident. A reconstruction of the media ratio and repairs to containment should be addressed in a four year plan. Justification We must notify NCDEQ each time we are forced to bypass the tertiary filters and document a trend signaling a weakness/flaw in our process. While we have not been assessed with a NPDES violation for these bypasses to date, the door is open for NCDEQ to implement a special order of consent to comply with our permit. Our preference is to address the problem before it becomes a liability. Category 05- Current level of service cannot be continued unless work is done Past Progress FY2016- Filter media (sand) was replaced in 4 of the 8 filters but under drain inspection and remedial work will be necessary in the coming years. FY2016 - Replacement of filter sand is ongoing FY2017-Continue sand replacement as needed. FY2017- Funds will be utilized to replace remaining four tertiary troughs with stainless. FY2018-Continue filter assessment to determine operational efficiency. FY2020- Funds will be utilized to replace four tertiary troughs with stainless. Current 2021-2025 CIP Funding Period Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Enterprise Fund 60,000 120,000 - - - - - 120,000 Total Revenues $60,000 $120,000 $- $- $- $- $- $120,000 Current I 2021-2025 CIP Funding Period Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Equipment/Furnishing 60,000 120,000 - - - - - 120,000 Total Expenditures $60,000 $120,000 $- $- $- $- $- $120,000 15-Jan-2021 16:19 Sewer-9 CIP PROJECT SUMMARY(FY2021 Adopted Budget) Water Resources - Sewer Basin C Grit Collector Encasement Description The discharge point encasement of the Basin C Grit Collector was initially constructed of carbon steel which has eroded to the point of replacement. Justification This unit is critical to the process of removing grit, sand and other untreatable materials from the wastewater prior to microbial activities. Failure to remove these materials will cause excess wear and tear on pumps further down in the process which could result in additional and costly repairs. Category 06-Current level of service cannot be assured unless work is done Current l _ 2021-2025 CIP Funding Period i Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Enterprise Fund - 75,000 - - - - - 75,000 Total Revenues $- $75,000 $- $ 7 S- $- $- $ 5,000 Current I 2021-2025 CIP Funding Period l Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total - 75,000 - - - - - 75,000 Total Expenditures $- $75,000 $- $- $- $- $- $75,000 15-Jan-2021 16:19 Sewer-10 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Retangular Clarifiers Festoon Description Project will replace the electrical cables that powers the travelling bridge on the retangular clarifiers and tertiary filters. The cables are cracking after almost 40 years of wear. Justification Project is consistent with the comprehensive facilities plan to continue to provide good service and eliminate hazard to persons and equipment. Category 02- Eliminates hazards to persons Current I 2021-2025 CIP Funding Period I Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Enterprise Fund - 60,000 - - - - - 60,000 Total Revenues $- $60,000 $- $- $- $- $- $60,000 Current I 2021-2025 CIP Funding Period I Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction 60,000 - - - - 60,000 Total Expenditures $- $60,000 $- $- $- S- $- $60,000 15-Jan-2021 16:19 Sewer-11 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Beech Branch Outfall Rehabilitation Description Rehabilitation and replacement of 27" corrugated metal outfall line. Justification The first phase of this project is underway and will include the relining of approximately 9500 linear feet of the sewer outfall. The second phase will include the remaining portion from seven bridges road to HWY 301. This sewer line is a major source of inflow/infiltration during high rain events, which create operational challenges at the treatment plant due to sudden increase in volumes. Category 07- Extends life of facility more than five (5)years Past Progress FY2018-Address immediate line needs. FY2019-Planning and design. FY2020- Project approved and awarded to contractor. Current& Future Plans FY2022 -Complete second phase of project. Current 2021-2025 CIP Funding Period Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Fund Balance 2,300,000 - 2,000,000 - - - - 2,000,000 Total Revenues $2,300,000 $- $2,000,000 $- $- $- $- $2,000,000 Current 2021-2025 CIP Funding Period Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction 2,300,000 - 2,000,000 - - - - 2,000,000 Total Expenditures $2,300,000 $- $2,000,000 $- $- $- $- $2,000,000 15-Jan-2021 16:19 Sewer-12 1 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Screw Pump Replacement Description Screw pumps lifts large volumes of water to the head of the plant. The four pumps at the plant were replaced in FY 16 and 17. The 4 pumps at the 97 lift station are in need of replacement as well due to excessive wear and lost in pumping capacity. This will be accomplished in 2 phase starting in FY 20 and with plans to complete it in FY 22.This project will also include trough relining and replacement of the lower bearing. The screw flights will be constructed with stainless steel, which is more durable to the corrosive nature of wastewater. Justification Replacement of these pumps is expected to significantly reduce the incidents of sanitary sewer overflows on the Nash County side of River Side Drive. Project is consistent with the Community Facilities Section of the Comprehensive Plan; Objective B-1 in that it provides for utility master planning for expansion and maintenance needs. Category 06-Current level of service cannot be assured unless work is done Past Progress FY2018-Screw Pump Maintenance scheduled. FY2018-Screw pump maintenance scheduled. FY2018- Pump 3 and 4 at the WWTP main wet well were completed. Construction of pumps 1 and 2 is on going with installation in January 2018. FY2020-Contractor was selected for the replacement of two screw pumps at the HWY 97 pump station and work will commence in the spring of 2020. Current I 2021-2025 CIP Funding Period I Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Enterprise Fund 624,000 - 350,000 - - - - 350,000 Total Revenues $624,000 $- $350,000 $- $- $- $- $350,000 Current 2021-2025 CIP Funding Period Expenditures FY 2020i FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Equipment/Furnishing 624,000 - 350,000 - - - - 350,000 1 Total Expenditures $624,000 $- $350,000 $- $- $- $- $350,000 15-Jan-2021 16:19 Sewer-13 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Old Mill Rd Pump Station Description Engineering study of our pump stations and current flow capacity indicate the need to upgrade this pump station in the near future. Justification This pump station was constructed in the 1960's. No major upgrade has since being performed and this project will ensure its efficiency to meet growing demands. Project is consistent with comprehensive facilities plan in that it will continue to provide quality service. Category 07- Extends life of facility more than five (5)years Current f 2021-2025 CIP Funding Period I Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Installment Debt - - 1,500,000 - - - - 1,500,000 Total Revenues $- S. $1,500,000 $- $- 5- $- $1,500,000 Current I 2021-2025 CIP Funding Period l Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction - - 1,500,000 - - - 1,500,000 Total Expenditures $- $- $1,500,000 $- $- $- $- $1,500,000 15-Jan-2021 16:19 Sewer-14 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Blowers and Motor Inspection/Rehabilitation-VPSA system Description The inspection and possible rebuilding of the blowers and motor for the VPSA system was highly recommended by the manufacturer to be conducted after five years of operation. System was commissioned in 2012. Justification This system is the primary supplier of oxygen to the microrganisms in the basins at the treatment plant. Failure of the motor and blowers would render the system inoperable and would create a major disruption in operations. Category 07- Extends life of facility more than five (5)years Past Progress FY2018- Rebuilding of the motor was suspended following the decision to install a "TAP" to monitor the performance of the unit. The blowers will be serviced as scheduled. Current t ._ 2021-2025 CIP Funding Period i Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Enterprise Fund - - 70,000 - - - - 70,000 Total Revenues $- $- $70,000 $- $- $- $- $70,000 Current l 2021-2025 CIP Funding Period l Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction - - 70,000 - - - - 70,000 Total Expenditures $- $- $70,000 $- $- $- $- $70,000 15-Jan-2021 16:19 Sewer-15 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer 54" Outfall Rehabilitation Description Rehabilitation of 54"outfall line that originally failed in 2014. The line runs along Atlantic Avenue. Justification Emergency repairs were conducted on a failed section of the 54" sewer line in 2014 followed by the rehabilitation of the section that runs under the Fire Training Ground in FY2018. Based on the hydraulic modelling of the system, there are two sections before and after the HWY 97 lift station that requires a similar rehabilitation effort. This project will address that section and upon completion, is expected to significantly preserve the integrety of the pipe and reduce incidences of sanitary sewer overflows. Category 07- Extends life of facility more than five (5)years Past Progress FY2018- Rehabilitation work Current i 2021-2025 CIP Funding Period t Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Project Loan - - - 2,250,000 - - - 2,250,000 Total Revenues $- $- $- $2,250,000 $- S. $- $2,250,000 Current I 2021-2025 CIP Funding Period Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction - - - 2,250,000 - - - 2,250,000 Total Expenditures S. $- $- $2,250,000 5- 5- 5- $2,250,000 15-Jan-2021 16:19 Sewer-16 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Sharpsburg Pump Station Description Based on engineering study conducted in 2019, this sewer pump station is nearing its operational capacity and requires an upgrade. Justification The entire town of Sharpsburg sewer lines empties into this lift station. The town is anticipating population growth and this station is among the older stations and requires an upgrade to keep up with demand. Project is consistent with the comprehensive facilities plan in that it will continue to provide good service Category 07- Extends life of facility more than five (5)years Current __..... 2021-2025 CIP Funding Period Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Installment Debt - - - 1,000,000 - - - 1,000,000 Total Revenues $- $- $- $1,000,000 $- $- $- $1,000,000 Current { 2021-2025 CIP Funding Period Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction - - - 1,000,000 - - - 1,000,000 Total Expenditures $- $- $- $1,000,000 $• $- $- $1,000,000 15-Jan-2021 16:19 Sewer-17 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Arbor Lane Pump Station Description Replacement/rehabilitation of pump station and equipment. Justification This pump station is very old and is the only brick construction wet well remaining in the sewer system. It was evaluated during an engineering study in 2019 and found to be operating at almost full capacity. The recommended upgrade is expected to address this issue as well as prevent sanitary sewer overflows. This project is consistent with the comprehensive facilities plan in that it will continue to provide good service. Category 07- Extends life of facility more than five (5)years Current l 2021-2025 CIP Funding Period Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Installment Debt - - - 1,000,000 - - - 1,000,000 Total Revenues $- $- $- $1,000,000 $- $- $- $1,000,000 Current 2021-2025 CIP Funding Period 1 Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction - - - 1,000,000 - - - 1,000,000 Total Expenditures $- $- $- $1,000,000 $- $- $- $1,000,000 15-Jan-2021 16:19 Sewer-18 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Concrete Repairs on Basins and Clarifiers Description Basins, chambers, clarifiers and tanks are made of concrete. Over time, the cement in the concrete physically and chemically deterioates exposing the agregate (stones) in the concrete. These stones will fall into the process system creating additional problems for moving parts and machinery. The integrity of the structures are slowly declining. The surface of the concrete will be assessed and covered over with the appropriate material. Justification Project is consistent with the Community Facilities Section of the Comprehensive Plan; Objective B-1 in that it provides for utility master planning for expansion and maintenance needs. Category 06-Current level of service cannot be assured unless work is done Current ! 2021-2025 CIP Funding Period 1 Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Project Loan - - - 1,000,000 - - - 1,000,000 Total Revenues $. $- $- $1,000,000 $- $- $- $1,000,000 Current 2021-2025 CIP Funding Period Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction - - - 1,000,000 - - - 1,000,000 Total Expenditures $- $- $• $1,000,000 $- $- $- $1,000,000 15-Jan-2021 16:19 Sewer-19 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Replace Gearboxes on Screw Pumps Description All Screw pumps have gearboxes that convert the electrical power of a 100 HP motor to mechanical power for rotating the screw. There is a significant amount of torque on these gearboxes. Lubrication oil is monitored and analysed for metals which would indicate metal breakdown. Justification Gearboxes are approximately 30 years old. They run continously and if a gearbox fails, pumping capability would be negatively impacted. Project is consistent with the Community Facilities Section of the Comprehensive Plan; Objective B-1 in that it provides for utility master planning for expansion and maintenance needs. Category 06-Current level of service cannot be assured unless work is done Current I 2021-2025 CIP Funding Period l Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Installment Debt - - - - 500,000 - - 500,000 Total Revenues $- $- $- $- $500,000 $- $- $500,000 Current i 2021-2025 CIP Funding Period i Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Equipment/Furnishing - - - - 500,000 - - 500,000 Total Expenditures $- $- $- $- $500,000 $- $- $500,000 1. 15-Jan-2021 16:19 Sewer-20 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Roof Replacement for Administration Building at WWTP Description The roof over portions of the administrative building has deterioated with cracks and fissures resulting in leaks. Justification The existing administration building has a build up roof (BUR) over tapered insulation and metal decking. The original building comprised of 7,630 sf. In 2005, two additions to the original building were made totalling 3,480 sf. Current plan is to remove and replace the BUR with either a low-sloped standing seam metal roof (SSMR) or a combination of low-sloped SSMR and single-ply membrane. This will address the leaks and protect the integrity of the building. Category 03- Eliminates hazards to property Current l 2021-2025 CIP Funding Period i Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Enterprise Fund - - - - - 350,000 - 350,000 Total Revenues $. $. $- $- $- $350,000 $- $350,000 Current l 2021-2025 CIP Funding Period i Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction - - - - - 350,000 - 350,000 Total Expenditures $- $- S. 5- S. $350,000 $- $350,000 15-Jan-2021 16:19 Sewer-21 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer SC:Maple Creek Pump Station and Forcemain Description Remediation of wet weather inflows in the sewer shed and upgrades to the Maple Creek Pump Station and forcemain to provide additional pumping capacity to meet future anticipated demand resulting from extension of the Maple Creek Outfall. Justification Significant increase in flow due to the extensions of the Maple Creek Outfall will require increases in the station's capacity. Category 08- Improves efficiency or generates additional revenue with initial cost being recovered by savings within less than five (5)years Current I 2021-2025 CIP Funding Period I Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Installment Debt - - - - - - 3,400,000 - Total Revenues S- S. S- $- E- S. $3,400,000 5- Current I 2021-2025 CIP Funding Period I Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction - - - - - - 2,950,000 - Land Acquisition - - - - - - 200,000 - Planning/Design - - - - - - 250,000 - Total Expenditures S- S- S- E- S- S- $3,400,000 $- 15-Jan-2021 16:19 Sewer-22 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Gold Rock Lift Station Rehab Description In order to provide capacity for planned industrial development in the Gold Rock Area, the Gold Rock pump station and force main will need to be upsized. The pump station would be upgraded from 400 gpm to 1000 gpm capacity (with the potential to increase to 1,300 gpm as the area develops) and the force main (5,600 ft)would be upsized from 6"to 12." Justification Project is consistent with the Community Facilities Section of the Comprehensive Plan; Objective D-1 in that it provides for utility growth into un-served or underserved areas of Nash and Edgecombe Counties. Category 06- Current level of service cannot be assured unless work is done Past Progress FY2019- Engineering firm is currently preparing a study to evaluate the potential sanitary sewer, force main, and pump station improvements to support future build out of the industrial center. Report is anticipated to be submitted in early spring. Current r- 2021-2025 CIP Funding Period Revenues tFY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Enterprise Fund - - - - - - 3,000,000 - Total Revenues $- $- S. $- $- $- $3,000,000 $- Current I ._. 2021-2025 CIP Funding Period Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction - - - - - - 3,000,000 - Total Expenditures $- $- $- $- $- $- $3,000,000 S- 15-Jan-2021 16:19 Sewer-23 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer AMR/AMI Metering Project (Sewer) Description This project will entail upgrading the metering technology for the sewer utility (which relies on water consumption data from water meters) in order to provide for remote reading and improved customer awareness regading utility consumption. Justification This project will inprove operational efficiency and better equip the customer to assess and monitor end user consumption. This project will also be coordinated with a similar project in electric and in gas. Category 12-Other as needed Current I 2021-2025 CIP Funding Period I Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Installment Debt - - - - - - 2,500,000 - Total Revenues S- S- $- S- S- S- $2,500,000 5- Cur rent i 2021-2025 CIP Funding Period _- Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Equipment/Furnishing - - - - - - 2,500,000 - Total Expenditures S- S- S- S- S- S- $2,500,000 S- 15-Jan-2021 16:19 Sewer-24 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer 1 Replace Webbs Lift Station Description Design and construct a new duplex lift station to replace the existing outdated facility. Justification Replace below grade lift station which is flood prone and is in excess of 33 years old. Category 06- Current level of service cannot be assured unless work is done Current & Future Plans FY2022-Allocate funding to design and construct replacement lift station. Current 1 2021-2025 CIP Funding Period Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Installment Debt - - - - - - 1,500,000 - 1 Total Revenues S- S- S- S- S- S- $1,500,000 5- Current _ 2021-202u CIF Funding Period Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction - - - - - - 1,500,000 - Total Expenditures S- S. S- S- S- S- $1,500,000 5- 15-Jan-2021 16:19 Sewer-25 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer SC:Compass Creek Outfall, Phase 2 Description This project provides for the extension of the Compass Creek Outfall sewer to Fenner Rd. and removal of the I pump station on Fenner Road. The pump station is currently running at capacity and needs to be reconstructed or removed to be able to handle projected flow increases due to pending development projects. This project was recommended in the Sewer Master Plan. Justification Upgrade of the pump station was initially identified in the 2003 Sewer Master Plan. The need to provide sewer service in annexation area 4b and reduce flow on the S. Church Street pump stations has caused a re-evaluation of project resulting in construction of a new outfall sewer that will allow for abandonment of the pump station. Category 12- Other as needed Current& Future Plans FY2021 - Planning scheduled. FY2022 -Scheduled construction. Current 2021-2025 CIP Funding Period Revenues . 1 i FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Enterprise Fund - - - - - - 50,000 - Installment Debt - - - - - - 1,250,000 - Total Revenues S_ S_ $. S. S. S- S1,300,000 S- Current I 2021-2025 CIP Funding Period i Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction - - - - - - 1,250,000 - Planning/Design - - - - - - 50,000 - Total Expenditures S- $- S- $- S- S- S1,300,000 S- 15-Jan-2021 16:19 Sewer-26 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer SC:Cokey Road/Glendale Drive Sewer (Former Annex Area 7B) Description This project will establish the Cokey Road Pump Station near the intersection of Cokey Road and S. Glendale Ave and an 8"sewer collection system along Glendale Drive and Cokey Road to serve annexation area 7B. Justification This collector system is required to adequately serve the area; however, there were no supplemental request for annexed property owners. Category 10- Expansion of service is deemed necessary Current I 2021-2025 CIP Funding Period } Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Enterprise Fund - - - - - - 50,000 - Installment Debt - - - - - - 550,000 - Total Revenues $- $- $- $- S. $- $600,000 6- Current t 2021-2025 CIP Funding Period Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction - - - - - - 550,000 - Planning/Design - - - - - - 50,000 - Total Expenditures S- $- $- $- S- $- $600,000 $- 15-Jan-2021 16:19 Sewer-27 CIP PROJECT SUMMARY(FY2021 Adopted Budget) Water Resources - Sewer Johnson Street Force Main Description In order to meet compliance with DENR 2T regulations, a new force main from the Johnson Street Lift Station to an intercept at Cokey Road must be addressed within a two-year period. Pumps are being replaced in this fiscal year, but the amendments to the force main is also required to meet our permit requirements Justification Project is consistent with the Community Facilities Section of the Comprehensive Plan; Objective D-3 in that it provides for sewer line upgrades and replacement to minimize overflows and infiltration in wet weather. It also opens the avenue of further development of Sharpsburg and Nash County. Category 05-Current level of service cannot be continued unless work is done Past Progress FY2017 - Due to l&I repairs and data collected from the Lift Station SCADA system, the $400,000 project can be postponed until new development forces an upgrade. FY2018-Begin Design/Scope of force main upgrade Current 2021-2025 CIP Funding Period Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Installment Debt - - - - - - 500,000 - Total Revenues $- s- $- $- S- S- $500,000 5- Current 2021-2025 CIP Funding Period Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction - - - - - - 500,000 - Total Expenditures $- $- $- $- $- S- $500,000 $- 15-Jan-2021 16:19 Sewer-28 __ 1 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Leggett Park Sanitary Sewer Improvements, Phase 3 Description CWSRF approved project for low interest loan to complete sewer service extension and septic tank abandonment project in the Leggett Park area. Project will connect 18 existing residents to sewer that were deleted from the CWMTF grant project due to funding shortfall in the original grant. Justification Eliminates public health hazard. Category 02- Eliminates hazards to persons 2021-2025 CIP Funding Period Revenues FY 2020 FY 2021 FY 2022 FY 0 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Enterprise Fund - - - - - - 10,300 - Installment Debt - - - - - - 372,250 - Total Revenues 5- 5- 5- $- $- 5- $382,550 5- Current 2021-2025 CIP Funding Perky, Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction - - - - - - 372,250 - Planning/Design - - - - - - 10,300 - Total Expenditures $- 5- 5- 5- 5- $- 5382,550 5- 15-Jan-2021 16:19 Sewer-29 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer SC:Grape Branch Sewer Description This project will provide for the extension of the Grape Branch 12" sewer line approximately 2,200 feet from the end of the existing line to Beechwood Drive. This project will provide gravity sewer service to the Beechwood Drive area. Justification Project is consistent with the Community Facilities Section of the Comprehensive Plan; Objective D-1 in that it provides for utility growth into un-served or underserved areas of Nash and Edgecombe Counties. Category 10- Expansion of service is deemed necessary Current I— 2021-2025 CIP Funding Period I Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Enterprise Fund - - - - - - 75,000 - Installment Debt - - - - - - 192,000 - Total Revenues S- $- S- S- S- S- 5267,000 5- Current I 2021-2025 CIP Funding Period Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction - - - - - - 192,000 - Land Acquisition - - - - - - 45,000 - Planning/Design - - - - - - 30,000 - Total Expenditures S- S- S- S- S. S- $267,000 5- 15-Jan-2021 16:19 Sewer-30 CIP PROJECT SUMMARY(FY2021 Adopted Budget) Water Resources - Sewer WWTP Generators, PURPA Additions Description In order for the WWTP generators to meet the requirements of the City's contracts with ElectriCities and the Power Agency, it will be necessary to provide for additional operational purpose. It is proposed to use the waste heat from the generators to warm the plant process water. Warm water is more conducive to a high level of biological activityin the aeration basins. 9 Justification Meet PURPA requirements for use of generators other than for emergencies. Category 12- Other as needed Past Progress FY2018-Project was re-evaluated and moved to future years. Current I 2021-2025 CIP Funding Period i Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Installment Debt - - - - - - 250,000 - Total Revenues $- $- $- S- $- $- 5250,000 $- Current I 2021-2025 CIP Funding Period I Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction - - - - - - 225,000 - Planning/Design - - - - - - 25,000 - Total Expenditures S- S- 5- 5- 5- S- $250,000 $- 15-Jan-2021 16:19 Sewer-31 CIP PROJECT SUMMARY(FY2021 Adopted Budget) Water Resources - Sewer SC:College Road Sewer (Formerly Annex Area 4A) Description This project would extend a 10" gravity sewer approximately 1400 feet along College Road from US301 to the golf course (driving range) property. Currently, this property is the only requesting property within the annexation area, and its average daily flow would be less than 250 gpd. If no further interest is within Annexation Area 4A, the property could be served via a private grinder pump pumping into a 2" public force main along College Road. Below are the cost for each option 10" Gravity Line: $175,000 2" Public FM: $35,000 Justification Project is consistent with the Community Facilities Section of the Comprehensive Plan; Objective D-1 in that it provides for utility growth into un-served or underserved areas of Nash and Edgecombe Counties. Category 10- Expansion of service is deemed necessary Current l 2021-2025 CIP Funding Period Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Installment Debt - - - - - - 175,000 - Total Revenues $- $- $- $- S- $- $175,000 S- Current l 2021-2025 CIP Funding Period l Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction - - - - - - 160,000 - Planning/Design - - - - - - 15,000 - Total Expenditures S- S- S- S- S- S- S175,000 S- 15-Jan-2021 16:19 Sewer-32 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Ash Pond Mitigation Description Decades ago, the City of Rocky Mount abandoned the process of burning the sludge product and began land applying. A component of this abandoned process was the two ash ponds located on the north side of the facility. At the time of the furnace closure, the ash was not removed from the ponds. These ponds have been tested as inert and the ash may be simply spread on the City's Farm at this time of regulations. We propose that this be placed in the CIP at future years, as the Ash Ponds become a valuable piece of infrastructure when the City employs a water reuse program. Justification Project is consistent with the Community Facilities Section of the Comprehensive Plan; Objective B-1 in that it provides for utility master planning for expansion and maintenance needs. Category 03- Eliminates hazards to property Current 2021-2025 CIP Funding Period Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Enterprise Fund - - - - - - 150,000 - Total Revenues s- $- s. s- $- s- $150,000 $- Czl>rent _ 2021-2025 CIP Funding Period Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction - - - - - - 150,000 - Total Expenditures $- $- $- $- $- $. $150,000 $. 15-Jan-2021 16:19 Sewer-33 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer WWTP SCADA Description 1 Project proposes to develop an in-house SCADA system allowing monitoring and control of operating equipment and recording control parameters at WWTP. The NC97 lift station would be a part of this network. Observation of operational basins and storage tank levels, start and stopping of pumps, and instrumental monitoring of control parameters would be possible with current radio communication and computer equipment. This system would be done on a build it by pieces, much as the Water Plant SCADA has been done. Justification This project is consistent with the Community Facilities Section of the Comprehensive Plan; Objective D-2 in that it provides for insuring regulatory permit compliance. Category 10- Expansion of service is deemed necessary Past Progress FY2016-This project was completed. Current _® 2021-2025 CIP Funding Period l Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Enterprise Fund - - - - - - 100,000 - Total Revenues $- $- $- $- $- $- $100,000 $- Current r 2021-2025 CIP Funding Period _ --___ i Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction - - - - - - 100,000 - Total Expenditures $- $- $- $- $- $- $100,000 $- 15-Jan-2021 16:19 Sewer-34 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Scum Trough Replacement Description Scum troughs for circular clarifiers (4) the thickener clarifiers (2) and the reclaim clarifiers (2) need to be replaced due to excessive corrosion Justification Category 06-Current level of service cannot be assured unless work is done Current l 2021-2025 CIP Funding Period Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Enterprise Fund - - - - - - 100,000 - Total Revenues s- s- s- s- s- s- $100,000 S- Current I 2021-2025 CIP Funding Period I Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total - - - - - - 100,000 - Total Expenditures $- $- $- $- $- $- $100,000 $- 15-Jan-2021 16:19 Sewer-35 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer WWTP Storage Shelter Description Construction of a 6 bay open air shelter to house and protect the heavy equipment of the Division. Justification Division has used every available space in abandoned buildings and still has key equipment exposed to the elements. Category 07- Extends life of facility more than five (5)years Past Progress FY2017-Construction of shelter will be delayed due to competing projects Current 2021-2025 CIP Funding Period Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Enterprise Fund - - - - - - 85,000 - Total Revenues $- $- $- 5- $- $- $85,000 5- Current t..�. ..... 2021-2025 CIP Funding Period l Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction - - - - - - 85,000 - Total Expenditures $- $- $- $- $- $- $85,000 $- 15-Jan-2021 16:19 Sewer-36 CIP PROJECT SUMMARY(FY2021 Adopted Budget) Water Resources - Sewer Hypochlorite System Description Replacement of gas chlorine feeds system @ Tar River Regional WWTP with a bleach feed system. Basically, this will eliminate our need for a Risk Management Program and the liability to our neighbors. This project displaces the 8 tons of gas chlorine which the facility keeps in stock for disinfection of the wastewater effluent. Justification Project is consistent with the Community Facilities Section of the Comprehensive Plan; Objective B-3 in that it updates the CIP, to continue to providing quality utility service. Category 02- Eliminates hazards to persons Past Progress FY2019-As of November 2018 at 60% engineering design completed. Will have 90% by Jan 2019. FY2020- Project approved and awarded Current I 2021-2025 CIP Funding Period I Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Installment Debt 799,000 - - - - - - - Total Revenues $799,000 $- $- S- $- $- $- $- Current I 2021-2025 CIP Funding Period I Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Planning/Design 799,000 - - - - - - - Total Expenditures $799,000 $- $- $- $- S. $- $- 15-Jan-2021 16:19 Sewer-37 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Wesleyan Boulevard Widening Utility Relocation and Betterment Description Reimbursement to NCDOT of expenses associated with relocation and betterment of utility lines for Wesleyan Boulevard widening project. Justification Category 01 - Legally mandated Past Progress FY2017- Project in Utility Coordination/Planning stage currently FY2018 -Project to be advertised /let Current l 2021-2025 CIP Funding Period l Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Fund Balance 455,000 - - - - - - - Total Revenues $455,000 $- $- $- $- $- $- $- Current i 2021-2025 CIP Funding Period l Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction 455,000 - - - - - - - Total Expenditures $455,000 $- $- $- $- $- $- $- 15-Jan-2021 16:19 Sewer-38 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer NC 97 Switch Gear Description The switch gear at the 97 lift station has experienced significant corrosion to its internal components and will require a rebuilt or replacement project in the near future. Justification Project is ongoing. Category 06- Current level of service cannot be assured unless work is done Past Progress FY2018- Replace and rebuild electrical components for switch gear. FY2018-Cost estimate submitted by Engineering Firm FY2020 -Project will be completed in FY 20 Current l 2021-2025 CIP Funding Period I Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Installment Debt 115,400 - - - - - - - Total Revenues $115,400 $- $- $- $- $- 5- 5- Current I 2021-2025 CIP Funding Period I Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Equipment/Furnishing 115,400 - - - - - - - Total Expenditures $115,400 $- $- $- $- $- $- 5- 15-Jan-2021 16:19 Sewer-39 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Aeration Basin Rehabilitation Description Project will address the removal of inert material from the aeration basins to increase rentention time and capacity. Ancillary equipment will also be evaluated and replaced if necessary. These basins have never been cleaned out. Inordinate amounts of sand and grit are getting into the system and it is important that this is cleaned as it is most likely the source of much of the sand and grit. Justification This project will improve efficiency and treatment capacity at the plant. Category 07- Extends life of facility more than five (5)years Current 2021-2025 CIP Funding Period Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Installment Debt - 375,000 525,000 680,000 550,000 - - 2,130,000 Total Revenues $- $375,000 $525,000 $680,000 $550,000 $- $- $2,130,000 Current 2021-2025 CIP Funding Period Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction - 375,000 525,000 680,000 550,000 - - 2,130,000 Total Expenditures $- $375,000 $525,000 $680,000 $550,000 $- $- $2,130,000 15-Jan-2021 16:19 Sewer-40 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Sewer Automated Meter Reading Description This project will share with the Water Fund the cost of installation of electronic water meters in conjunction with electronic gas and electric meters. Cost are shared with Water Fund: 55% Water Fund / 45% Sewer Fund. Funding request provided in this account reflects that cost share. Justification Project is consistent with the Community Facilities Element of the Comprehensive Plan; Strategy B-2 & F-1 in that it upgrades existing utility service and improves the management of utilities. Category 11 - Needed to implement a new program or activity being requested in an upcoming operating budget Past Progress FY2017- Funds scheduled to continue AMR conversions. FY2018- Funds scheduled to continue AMR conversions. FY2019- Funds scheduled to continue AMR conversions. FY2020- Funds scheduled to continue AMR conversions. Current& Future Plans FY2021 - Funds scheduled to continue AMR conversions FY2022- Funds scheduled to continue AMR conversions FY2023-Funds scheduled to continue AMR conversions FY2024- Funds scheduled to continue AMR conversions FY2025- Funds scheduled to continue AMR conversions Current 2021-2025 CIP Funding Period Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Enterprise Fund 250,000 350,000 350,000 350,000 350,000 350,000 800,000 1,750,000 Total Revenues $250,000 $350,000 $350,000 $350,000 $350,000 $350,000 $800,000 $1,750,000 Current I 2021-2025 CIP Funding Period 1 Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Equipment/Furnishing 250,000 350,000 350,000 350,000 350,000 350,000 800,000 1,750,000 Total Expenditures $250,000 $350,000 $350,000 $350,000 $350,000 $350,000 $800,000 $1,750,000 15-Jan-2021 16:19 Sewer-41 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Sewer Rehabilitation Program Description This project will continue the Infiltration/Inflow reduction program currently in progress through renovation and repairs to old sewer system to reduce groundwater infiltration and stormwater inflow. These funds are used for purchase of replacement piping, contracting of grouting services, amendments to MH Elevations, and other ongoing rehabilitation projects. Justification Project is consistent with the Community Facilities Section of the Comprehensive Plan; Objective D-3 in that it provides for sewer line upgrades and replacement to minimize overflows and infiltration in wet weather, minimizing the chance for treatment plant overloading. Category 07- Extends life of facility more than five (5)years Past Progress FY2016 - Needs identified and addressed with project funds FY2017 - Needs identified and addressed with project funds FY2018- Needs identified and addressed with project funds FY2019- Needs identified and addressed, continue with projected funds Current& Future Plans FY2021 -Continue with manhole rehab and main CIPP relining FY2022-Continue with manhole rehab and main CIPP relining FY2023-Continue with manhole rehab and main CIPP relining Current 2021-2025 CIP Funding Period Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Enterprise Fund 250,000 250,000 250,000 250,000 300,000 300,000 300,000 1,350,000 Total Revenues $250,000 $250,000 $250,000 $250,000 $300,000 $300,000 $300,000 $1,350,000 Current 2021-2025 CIP Funding Period Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction 250,000 250,000 250,000 250,000 300,000 300,000 300,000 1,350,000 Total Expenditures $250,000 $250,000 $250,000 $250,000 $300,000 $300,000 $300,000 $1,350,000 15-Jan-2021 16:19 Sewer-42 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Sewer Asset Management Plan Description Project would compile information on sewer pump station equipment, condition, inflow and capacity in standardized electronic format readily accessible to appropriate staff. Data would then be used to develop a sewer system model asset management and master plan to evaluate impacts of new flows to the system and guide investment decisions on system rehab and expansion. Justification Improved operation and maintenance capabilities. Meet statutory requirements for certifying that the system has the capacity to accept new permitted flow. Category 09- Improves efficiency or generates additional revenue with initial cost being recovered by savings within less than ten (10)years Past Progress FY2017 -Wrapped up Phase 3 of AMP- (CMMS Software Selection, Build R&R Model) Current I 2021-2025 CIP Funding Period Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Enterprise Fund - 150,000 145,000 150,000 150,000 - 145,000 595,000 Total Revenues $- $150,000 $145,000 $150,000 $150,000 S. $145,000 $595,000 Current I 2021-2025 CIP Funding Period Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Planning/Design - 150,000 145,000 150,000 150,000 - 145,000 595,000 Total Expenditures $- $150,000 $145,000 $150,000 5150,000 $- $145,000 $595,000 15-Jan-2021 16:19 Sewer-43 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer SC:Minor Enhancements and Main Extensions Description This project provides for small scale system enhancement projects and sewer main extensions requests as approved by the City Council through the petition process and funding of developer agreements for the extension or oversizing of sewer mains installed as part of a development project. Justification Project is consistent with the Community Facilities Section of the Comprehensive Plan; Objective D-1 in that it provides for utility growth into un-served or underserved areas of Nash and Edgecombe Counties. Category 07- Extends life of facility more than five (5)years Past Progress FY2017 -Complete identified priority improvements and extensions FY2018 -Complete identified priority improvements and extensions FY2019 -Complete identified priority improvements and extensions FY2020 -Complete identified priority improvements and extensions Current I 2021-2025 CIP Funding Period I Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Enterprise Fund 75,000 75,000 75,000 75,000 75,000 75,000 75,000 375,000 Total Revenues $75,000 $75,000 $75,000 $75,000 $75,000 $75,000 $75,000 $375,000 Current i 2021-2025 CIP Funding Period I Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Construction 75,000 75,000 75,000 75,000 75,000 75,000 75,000 375,000 Total Expenditures $75,000 $75,000 $75,000 $75,000 $75,000 $75,000 $75,000 $375,000 15-Jan-2021 16:19 Sewer-44 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Back up Compressor for the Vacuum Pressure Swing Absorption (VPSA) Oxygen Systen Description Procurement of a compressor to serve as back-up for this system. Justification The VPSA system is the primary supplier of oxygen to the microorganisms in the basins at Wastewater Treatment Plant. The compressor is a key component of this system and runs continuously. A back up compressor would address any failure in order to maintain a steady operation. Category 06-Current level of service cannot be assured unless work is done Current I 2021-2025 CIP Funding Period I Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Enterprise Fund - 75,000 - - - - - 75,000 Total Revenues $- $75,000 $- $- $- S. $- $75,000 Current I 2021-2025 CIP Funding Period I Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Equipment/Furnishing - 75,000 - - - - - 75,000 Total Expenditures S. $75,000 $- S- S. $- $- $75,000 15-Jan-2021 16:19 Sewer-45 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Computerized Maintenance Management System (CMMS) Acquisition and Implementatio Description This project entails acquiring, populating, training, and then implementing a CMMS for use in Water Resources. Justification This system once implemented will assist the department in developing/tracking work orders and equipment efficiency and life cycle. Category 08- Improves efficiency or generates additional revenue with initial cost being recovered by savings within less than five (5)years Current l 2021-2025 CIP Funding Period i Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Enterprise Fund - 33,000 33,000 33,000 35,000 - - 134,000 Total Revenues $- $33,000 $33,000 $33,000 $35,000 S. 5- $134,000 Current 2021-2025 CIP Funding Period I Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Equipment/Furnishing - 33,000 33,000 33,000 35,000 - - 134,000 Total Expenditures $- $33,000 $33,000 $33,000 $35,000 5- $- $134,000 15-Jan-2021 16:19 Sewer-46 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Construction Equipment - Sewer Description Funding for this project is intended to schedule large equipment replacement. Such equipment includes rubber-tire backhoes, tracked backhoe, dump trucks, bulldozers, and a sewer jet. Replacement is scheduled from data compiled by the Public Works Department, including frequency of use and age. Opportunities are also realized in addition of new equipment, which will increase productivity and efficiency. Justification Project is consistent with the Community Facilities Section of the Comprehensive Plan; Objective B-3 in that it updates the CIP to continue providing quality utility service. Category 05-Current level of service cannot be continued unless work is done Past Progress FY2016- Equipment purchased according to expenditure schedule below. FY2017- Equipment purchased according to expenditure schedule below, replace unit 8436 with vac unit. FY2018- Equipment purchased according to expenditure schedule below, unit#8617 and 8601 FY2019- Replace unit#8437 Vac Truck and addition of Skid Steer Current& Future Plans FY2021 - Replace unit#8616 mini excavator, Replace unit#8404, 4Cy dump truck and unit 8616, mini excavator. FY2022 - Purchase camera van for sewer FY2022 - Replace unit#8603, back-hoe and unit#8408 12 CY tandem dump truck FY2023 -Addition of a tandem dump truck Current l 2021-2025 CIP Funding Period Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Installment Debt 98,000 - 135,000 380,000 260,000 170,000 - 945,000 Total Revenues $98,000 $- $135,000 $380,000 $260,000 $170,000 $- $945,000 Current I 2021-2025 CIP Funding Period I Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total 4CY Dump Truck[R] 98,000 - - - - - - - Camera Van - - 135,000 - - - - 135,000 Mini Excavator[RI - - - 95,000 100,000 - - 195,000 RT Backhoe - - - 135,000 - - - 135,000 Tandem Dump Truck - - - 150,000 160,000 170,000 - 480,000 Total Expenditures $98,000 $- $135,000 $380,000 $260,000 $170,000 $- $945,000 15-Jan-2021 16:19 Sewer-47 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Vertical Turbine Pump/Motor Replacements Description The Wastewater Treatment Facility uses a massive amount of water for washing, de-foaming, and pressure blasting. At the effluent following chlorination are four (4) vertical turbine pumps which direct flow to the 200,000 gallon elevated tank. These pumps are 30 years old and are in need of replacement. We are seeking the new technology VFD motors and new bowl assembles for this improvement. Justification Motors are high electrical cost and bowls are beyond rebuilding. Category 06-Current level of service cannot be assured unless work is done Past Progress FY2020 -Project was re-evaluated and moved to 2021 after failure on 2 pumps Current I 2021-2025 CIP Funding Period i Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Enterprise Fund - - - - - - 70,000 - Total Revenues S- S- S- S- S- S- $70,000 S- - Current I 2021-2025 CIP Funding Period i Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Equipment/Furnishing - - - - - - 70,000 - Total Expenditures S- S- $- $- S- S- $70,000 S- 15-Jan-2021 16:19 Sewer-48 1 CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer C&D RAS pump rehab Description Due to the abrasive nature of the material passing through these pumps, the casings must be replaced before the pumps fail. Justification WWTP operates 24/7 every day. These pumps are an integral part of the plant operation. Category 06- Current level of service cannot be assured unless work is done Current l 2021-2025 CIP Funding Period - t Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Enterprise Fund 65,000 - - - - - - - Total Revenues $65,000 S- S- S- S- S. S- S- Current 1 2021-2025 Clio Funding Period 1 Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total 65,000 - - - - - - - Total Expenditures $65,000 S- S- S- $- $- $- 5- 11 15-Jan-2021 16:19 Sewer-49 r CIP PROJECT SUMMARY(FY 2021 Adopted Budget) Water Resources - Sewer Chlorinator & Sulfonator Replacement Description The chlorinator and Sulfonator are critical pieces of equipment that delivers chlorine and sulfur dioxide gases for disinfection and dechlorination at the wastewater plant. The units are obsolete and spare parts are no longer available for repairs. Justification Category 06-Current level of service cannot be assured unless work is done Past Progress FY2018- The Chlorinator portion of the project was suspended to evaluate alternative disinfection solutions. However the need to replace the sulfonator will proceed as planned. Current I2021-2025 CIP Funding Period _ $ Revenues FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Enterprise Fund 50,000 - - - - - - - Total Revenues $50,000 $- $- $- $- $- $- $- Current 1 2021-2025 CIP Funding Period l Expenditures FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Future CIP Description Proj Prop Prop Prop Prop Prop Years Total Equipment/Furnishing 50,000 - - - - - - - Total Expenditures $50,000 $- $- $- $. $- $- $- 15-Jan-2021 16:19 Sewer-50 VL2 CITY OF ROCKY MOUNT Department of Water Resources Water and Sewer Division Sanitary Sewer Overflow (S.S.O.) Water and Sewer Division Response Procedures 1. Sanitary Sewer Overflows endanger our environment and potentially the health of any citizens or employees that come into contact with an S.S.O. Unchecked S.S.O.'s can result in significant penalties from State and Federal environmental regulatory agencies as well. The procedures below were designed to protect our environment,citizens,and employees from a S.S.O. event. These procedures apply to City of Rocky Mount Water and Sewer Division personnel. 2. Upon discovery by CRM personnel or reported by outside citizen or agency of an S.S.O. an initial response will be made by the "on call" Supervisor in the Water and Sewer Division immediately, (one hour or less). The supervisor will make an immediate assessment to determine if an S.S.O. event has taken place. If an event has taken place, or is in progress, the supervisor will attempt to eliminate the source of the S.S.O. and contact the City of Rocky Mount Water and Sewer Services General Supervisor or Superintendent. 3. The General Supervisor or his alternate will respond to the location withoutdelay(less than one hour). Upon arrival, the General Supervisor will make an assessment of the S.S.O. and determine what is required to mitigate the event and establish a course of action for clean-up and restoration of the S.S.O. site. 4. If a blockage has occurred and overflow is in progress the General Supervisor will: a. Contact the On-Call Utility Repair Crew for mobilization of personnel and equipment. b. Contact the Water and Sewer Department General Supervisor for assistance in mobilizing manpower resources; if necessary. c. Set up contain mentfor S.S.O. and establish work zone with "Danger, Do Not Enter" and barricades. 5. The General Supervisor will contact the Superintendent and he will record all events as per the City of Rocky Mount S.S.O. Clean-up Procedures 1 Instruction and will be the primary contact to Nash or Edgecombe County and State of North Carolina authorities. PURPOSE The purpose of this document is to establish written procedures for responding to Sanitary Sewer Overflows (S.S.O.) in the City of Rocky Mount. This procedure applies to all Water Resources Department employees who in the course of their work may deal with S.S.O.'s. These procedures will be reviewed at least semi- annually,or whenever revised guidance from county,state or federal authorities dictate a revision is necessary. Adherence to these procedures will provide consistency of response for protection of the environmentand the citizens of Rocky Mount. OPEN GROUND OR PAVED AREAS 1. Setup containment at or near the storm drainage system; do not let the spill enter the storm drainage system. 2. Put up tape, black on red, "Danger Do Not Enter," around the S.S.O. area. 3. Spread lime and sand (or equivalent material)on spillage to a depth of one inch.Allow this stand for one hour and sweep up. If moisture or grease is still present, repeat procedure. If volume is sufficient,use vacuum truck to remove as much liquid as possible. 4. After removing the contaminated material, wash down the area with high water pressure and Chlorinated bleach. Pump this back into the sewer system. Transport wet sand/lime to boxes at grit channels at the Tar River Regional Wastewater Facility. 5. If this spill goes into the storm drainage system, refer to creek procedure. WATERCOURSES(storm sewers, ditches, flowing streams) 2 1. Barricade area using warning tape, black on red, "Danger Do Not Enter," from the S.S.O. site to the pump site on both sides of the creek in populated areas. In unpopulated areas restrict access where there is any chance of humans coming in contact with the S.S.O. 2. Contact WWTP Personnel to take conductivity readings downstream and fecal coliform samples at the S.S.O. site. Coliform samples should be taken 100 feet above the S.S.O. site and at 400-foot downstream intervals until reaching the pump site. Pull samples every 24 hours until readings of 500 colon ies/100m1,or less are obtained. 3. Construct a dam, using soil that is capable of handling creek flow. The dam should be constructed near a manhole or at a location which is accessible to the jet/vacuum truck whenever possible. Placement of the dam should be at a point where the lowest conductivity reading is measured if possible. Use one pump for backup. Always provide a backhoe at site with extra material in order to construct a dam, can be reconstructed if a breach occurs. There should always be a minimum of two employees at the pump site during pumping operations. Pump effluent from behind the dam into the manhole. Use conductivity measurements to determine contaminated areas of watercourses. 4. Flush stream with water from a sufficient number of hydrants to remove waste product from the creek. Continue to pump and flush stream until all fecal coliform tests come back 500 colon ies/100m1 or less. Pull samples every 24 hours until this reading is obtained. Pull samples 100 feet above the S.S.O. site, at the site, and at 400-foot intervals until reaching the pump site. Notify water treatment plant when starting and stopping of stream flushing. 5. If riprap is in creek, wash down with high water pressure until there is no waste residue remaining on,or within the riprap structure. If sludge is in creek, vacuum creek bottom and sides until there is no waste residue remaining. 6. If creek flows into a body of water used for recreation, and /or drinking, notify the locally affected officials as soon as the problem is discovered. If this happens, refer to pond,lake procedure. IN POND OR LAKE 1. Barricade area with warning tape, black on red, "Danger Do Not Enter," on the shoreline at the contaminated area. 3 2. In a pond, collect fecal coliform samples and Dissolved Oxygen (D.O.) readings around the entire circumference. Set up pumping operations below the dam. 3. In a large lake, collect fecal samples two feet off the bottom. D.O. readings are to be done one foot under the surface. Take equal sampling amounts around the circumference of the structure. 4. When the first sampling results come in,contact the Water and Sewer Division Su perintendentfor appropriate action if the fecal coliform counts area greater than 8,000 colon ies/100m1. 5. Continue pumping until 500 colon ies/100m1 orless is obtained in the structure. 6. Continue monitoring coliform counts until the North Carolina Division of Water Quality says that monitoring is no longer required. OUT FALLS OR REMOTE AREAS 1. Put up warning tape,"Danger Do Not Enter,"around the S.S.O. site. 2. In open area, lime (powder) heavily and till. Repeat procedure. Seed and apply a layer of wheat straw. 3. In an area where there is undergrowth or small trees, wash area with large amounts of water, push into creek towards the pump site. Do this until no waste remains, after 12 to 24 hours; if precipitation is not forecast, apply lime to the area. Use all cautions to not get lime in the waterway! POPULATED AREAS 1. In addition to procedures for open ground. 2. Till the area whenever possible. Apply lime, seed, and straw. 3. If tilling is not possible, apply lime and two inches of topsoil and mix thoroughly,lime again lightly,then seed and cover with straw. S.S.O. REPORTING PROCEDURES 1. Upon discovery of a possible S.S.O. site during normal duty hours, notify the S.S.O. Contact Monitor(s) at the telephone numbers below: Jason Glover, General Supervisor-252-903-8991 4 1 Or Nate Williams, Superintendent-252-469-5686 2. After normal duty hours,contact Nate Williams on mobile number 252- 469-5686 In the event that he cannot be reached, contact Jason Glover on mobile number 252-903-8991. In the event that these individuals cannot be reached, contact Blake Winstead, Collections Supervisor at 252-904- 4591. 3. S.S.O. On Call Supervisors, General Supervisor or Superintendent of the Water and Sewer Division will be the primary interface between the City of Rocky Mount and the State of North Carolina Department of Water Quality and Nash or Edgecombe County Health Departmenton all S.S.O. matters. 4. S.S.O. Contact Monitors will report overflows from any sewer line or pump station, or the bypass of any wastewater treatment system or any component thereof.This requirement applies in the following cases: ➢ Any spill of 1000 gallons or more or any spill; regardless of the volume, if any waste reaches the surface water of the State. Please note that conveyances such as drainage ditches and storm sewer are considered waters of the State. 5. S.S.O. Contact Monitor General; General Supervisorwill notify the Superintendent of Water and Sewer of any S.S.O. that falls within the parameters listed below. After normal duty hours, he can be reached at 252-903-8991. The Superintendent of Water and Sewer will be responsible for notifying the Director of Public Utilities Water Resources. S.S.O. Contact Monitors are required to provide an oral report regarding reported spills to the appropriate Regional Office at 919-791-4200, as soon as possible but in no case later than 24 hours following the spill event. If a spill occurs after normal business hours,which reaches surface waters and/or it may be considered as either an environmental or health hazard, it shall be reported to the N.0 Division of Emergency Management at 1-800-858-0368. 800-858-0368. Their office will contact appropriate Division of Water Quality staff. A full report must be submitted to the appropriate regional office through the BIMS Portal Report System within five(5) days of the time that the City of Rocky Mount reported the SSO. All parts of the form must be completed in detail and submitted either at the time of the oral report or within the required five(5) days. 5 S.S.O. Emergency Contact Numbers State of North Carolina 919-791-4200 Division of Environmental Quality (DEQ) State of North Carolina 1-800-858-0368 Division of Emergency Management (For after hour spills that reach a waterway) Nash County Emergency Services 252-459-9805 Edgecombe County Emergency Services 252-641-7843 Jason Glover, General Supervisor 252-903-8991 Water and Sewer Division Radio Call # 801 Nate Williams, Superintendent 252-469-5686 Water and Sewer Division Radio call # 800 On Call Crew Supervisor 252-467-4800 Brenton Bent, Director 252-567-6844 Water Resources/Public Works Wastewater Treatment Plant 252-972-1400 Chuck Braswell Ed Braswell and Son's Contractor 252-985-8029 Eastern Environmental Management 252-443-2224 CITY OF ROCKY MOUNT WATER AND SEWER DIVISION S.S.O. COLLECTION SYSTEM "ON CALL" SUPERVISORS 6 Jeff Fogleman 252-822-2788 Construction Supervisor Blake Winstead 252-343-3162 Crew Supervisor Marvin Gorham 252-343-3162 Crew Supervisor Dustin Baker 252-343-3162 Crew Supervisor Taylor Joyner 252-467-5258 Crew Supervisor PUMP STATION "ON CALL" PERSONNEL 11 Barry Griffin 252-955-7871 Pump Station Maintenance Supervisor Charles Wood 252-813-7895 Pump Station Mechanic Randy Smith 252-883-1212 Pump Station Mechanic S.S.O. CONTACT MONITORS Jason Glover 252-467-4884 (Office) General Supervisor 252-903-8991 (Mobile) Nathaniel Williams 252-467-4919 (Office) Superintendent 252-469-5686 (Mobile) 1 SSO Emergency Response Equipment Availability • 1 - High pressure Sewer Jet Truck • 2 - Combination Vacuum/Jet Combo Unit— 1800 (10cyd) Gallon Vacuum tan k • 1 — 8" Bypass Pump Trailer Mounted • 1 — 6" Bypass Pump Skid Mounted • 1- 6 "Bypass Trailer Mounted Pump • 2 — 3" Hi - Velocity Pumps • 2 — 4" Hi —Velocity Pumps • 3000'- 6" Lay Flat Hose • 300' -6" Rigid Aluminum Pipe • Sewer Plugs(pneumatic)variable fit sizes to accommodate 4" — 30" lines • 1 — New Holland 50 HP tractor with landscaping attachments • 2-New Holland Woods Boss heavy vegetation mowing tractors with rotary cutters. • 1 — Kobelco 14-ton Excavator with interchangeable buckets • 1 — Yammer, 8-ton Excavator with interchangeable buckets • 1 — Hyundai, 18-ton Excavator w/ interchangeable buckets • 4 — Rubber Tire Backhoe loaders • 1 — Bobcat T870 Skid Steer and attachments • 5— 185 CFM air compressors and accessories • Portable Generator Sets: 1 — 5600 W AC Generator, 8 2 — 80,000 KW Portable Generator with variable voltage 240-480 • 4 — Crew Cab Trucks w/compliment of tools, 3 —4wd trucks with towing capabilities • 5— 5 yd. dump trucks • 3— 12 yd tandem dump truck • 1 — John Deere 644 Loader • Semi-Truck w/ Lowboy Trailer for equipment transport • 3 - 10 / 15-ton utility trailers • 18' material trailer • 1 — ATV 4x4 • Extenda-Jet, hose extender with tracks • Tri-pod Retrieval System • Confined space ventilation system • Bagged Hydrated Lime • Bailed Wheat Straw • Access to "Pig" Containment Tubes(contact WWTP) • Various resources from Streets / Storm Water Division,as well as our Gas and Electrical division. 9 VI .1 CITY OF ROCKY MOUNT EMERGENCY WASTEWATER PUMP FAILURE PLAN CONTINGENCY PLAN FOR PUMP FAILURE SEWER IFT-STATION SECTION PLAN This contingency planprovides detailed information to Public Works employees in the event of a failure at a wastewater pumping station such that p p g the employee(s) can take immediate action to prevent a potential S SO from occurring. The information in this document protects the citizens and environment of the City of Rocky Mount and its'Extraterritorial Jurisdiction,by establishing written procedures for responding to a Pump Station failure in accordance with Condition I (7) of Permit WQCS 00011. A copy of this plan,site specific, shall be located at each sewer lift station. EMERGENCY RESPONSE PERSONNEL Brad Kerr P.E,Director of Engineering Darryl Strother Electric Department Director Brenton Bent Director Public Works/Water Resources Donald Perry P.E,Assistant Engineer PWWR Nate Williams W/S Systems Superintendent, ORC Collections Jason Glover W/S Systems Supervisor,Backup ORC Barry Griffin Pump Station Supervisor Charles Wood Pump Station Mechanic Randy Smith Pump Station Mechanic ESS (Jerry or Phillip) Emergency Electrical Contractors Bowden Electric Electrical Troubleshooting RM Electric Motor Motors and Electrical Troubleshooting CONTACT NUMBERS HOME OFFICE MOBLE Brad Kerr 972-1120 Darryl Strother 972-1273 Breton Bent 972-1299 567-6844 Nate Williams 467-4919 343-3160 Jason Glover 467-4911 903-8991 Barry Griffin 467-4918 955-7871 Blake Winstead 343-0152 904-4591 ESS 567-8826 813-6727 Bowden Electric 908-4017 446-4203 903-9060 RM Electric Motor Shop 446-1510 EQUIPMENT LIST 2 Pump mechanic service trucks with all the necessary power,hand and diagnostic tools. 1 Pumps Maintenance Supervisor's service truck with all necessary tools 1 80kw Variable voltage output,mobile Emergency Generator 1 1 Jet Truck 2 Vacuum Combo Truck 2 6" By-Pass Pump,Portable 1 8" By-Pass Pump, Portable 2 Vent Blower with hoses 3 Personal body harnesses 2 Confined Space Tripods with hand wench 1 Portable Lay Flat Hose Systems for By-Pass Pumping PUMP PARTS & BACKUP LIST 1 Backup Pumps 2 Rebuilt Rotating Assembly''s 3. All electrical repair items (fuses breakers motor starters etc....) PUMP PARTS IN STOCK AT WATER & SEWER 1 All Wear Parts in Stock NOTE: IF ANY OF THE PUMPS,MOTORS,OR PARTS ARE USED OUT OF THE BACKUP LIST,THEY ARE TO BE SENT TO THE REPAIR SHOP IMMEDIATELY OR REPLACED. THESE PARTS SHOULD GO BACK INTO PARTS&PUMPS LIST. Troubleshooting Chart Trouble Cause Plan Both Pumps fail to start in 1. Utility power failure 1. Notify Power Company 1 either Auto or Manual mode 2. Control circuit breaker tripped. 2. Reset Circuit Breaker 3. Both motor overload 3. Check line conditions& relays tripped. report to power company if 4. Main power fuse blown, or out of range. After circuit breaker tripped. corrections reset operations. 4. Replace fuse or reset circuit breaker. A. Float Rod Hung Both pumps fail to start in auto mode only. B. Float Rod A. Free Rod,check for C. Float weighed with binding, lube. rags and grease. B. Replace D. Loose connections in C. Clean with scraper pole control wiring D. Check and tighten all connections. II. BUBBLER SYSTEM A. Air Pump Broken A. Replace B. Bubbler panel quit B. Run in hand,call supervisor or ESS C. Air line leak C. Replace line D. Loose connection in D. Check& tighten all control wiring. connections. III. MERCURY FLOATS A. Control switch not in A. Turn on on position. B. Over temp tripped B. Reset C. Float bad C. Replace D. Loose connection in D. Check& tighten all control wiring Connections One Pump Operates,but other 1. Hand-off-auto switch not 1. Operate switch to auto or fails to run in either manual or in required position. hands as required. auto mode. 2. Loose connections 2. Tighten Connections 3. Motor overload relay 3. Correct cause of overload tripped and reset overload relays. 4. Pump circuit breaker 4. Reset pump circuit tripped breaker 5. Pump jammed preventing 5. Free pump impeller impeller rotation. 6. Defective motor starter 6. Repair or Replace motor starter. Trouble Cause Plan 7. Defective hand-off-auto 7. Replace switch switch 8. Defective pump motor or 8. Repair or replace motor pump, or pump. One pump operates but other 1. See I,II,III 1. See I,II,III fails to run in automatic mode. 2. Loose Connections 2. Tighten Connections 3. Alternator relay defective 3. Replace Alternator Relay 4. Hand-Off-Auto switch 4. Change position of not in Auto switches to Auto Pump starts, runs short while, 1. Pump jammed with 1. Free jammed pump then stops though liquid level debris causing overload in wet remains high condition. 2. Defective pump bearings 2. Replace pump bearings or seals causing overload. and/or seals. 3. Defective pump motor 3. Replace pump motor. causing overload. Both Pumps run continuously 1. Hand-Off-Auto switches 1. Place switches in Auto though wet well is empty. in hand position. position. 2. See I,II,III 2. See I,II,III One Pump runs but Pump fails 1. Belt or Shaft broken 1. Adjust Belt or replace Belt to deliver rated discharge. or Shaft 2. Pump Not Primed. 2. Prime Pump. 3. Pump or Piping clogged. 3. Clear debris from pump and piping. 4. Suction Leak 4. Correct leak in suction piping. 5. Check Valve of opposite 5. Free Check Valve. Pump not properly seated. Pump Fail to Alternate 1. One Hand-Off-Auto 1. Position both switches to switch is not properly Auto. positioned. 2. Motor overload relay of 2. Correct cause of overload one motor is tripped. and reset relay. 3. One Pump Circuit 3. Position Circuit Breaker Breaker not properly set. with handle in ON position. 4. Loose Connections 4. Tighten Connections 5. Alternate Relay Defective 5. Repair or Replace Alternator Relay. Pumps Start and Stop at wrong 1. Wet Well levels are 1. Adjust Pressure Switch Wet Well levels. improperly adjusted. 2. See I,II,III 2. See I,II,III