Loading...
HomeMy WebLinkAbout20120614 Ver 1_401 Application_20120612@McGM A S S O C I A T E S June 15 2012 20120614 D��i�C PPc�i FD JAN 18 2012 #�ii OEri„� Mr Rob Krebs 'JN Regional Supervisor Surface Water Protection Section NCDENR 610 East Center Avenue Suite 301 Mooresville North Carolina 28115 CRE� B:t�effi�l����e Red PCN & 401 Water Quality Certification Catawba County North Carolina Dear Mr Krebs As stated in our letter dated May 24 2012 we have revised the Preconstruction Notification Form for the subject project On behalf of the City of Conover and Catawba County, we are submitting that revised document as an enclosure with this letter Also included in that enclosure are the associated plan sheets for each individual crossing an overall project map with indices of each stream crossing and detail sheets for use in stream restoration The revisions to the proposed stream crossings modifies their impacts so that only four (4) of the crossings will have a permanent impact and the overall length of permanent impact will be a maximum of 130 linear feet These revisions to the stream crossings will also be reflected in the record drawings submitted to the Division of Water Quality If you have any questions regarding these revisions please do not hesitate to contact me at (828) 328 2024 Sincerely McGILL ASSOCIATES P A R J MOZELEY PE Project Engineer cc Mr Steve Kitchefski Army Corps of Engineers (1/Encl ) Mr Alan Johnson NCDENR Mr Jimmy Clark City of Conover (1/Encl ) Mr Jon Greer Catawba County (1/Encl ) JUN 2 0 2012 F \06822 CATAWBA CO ASST BUNKER HILL HS AREA SEWER \02_Design Phase \Correspondence\ RK 401 404 revisions doc E n g i n e e r i n g o P l a n n i n g i F i n a n c e McGill Associates P A P O Box 1136 Hickory NC 28603 1240 19th St Lane NW Hickort NC 28601 Office 828 328 2024 Far 828 328 3870 O��F W A T Q C 9 20120614 Office Use Only Corps action ID no DWQ project no Form Version 13 Dec 10 2008 Page 1 of 11 PCN Form — Version 13 December 10 2008 Version Pre - Construction Notification PC Form A 1 Processing la Type(s) of approval sought from the Corps ®Section 404 Permit ❑Section 10 Permit 1 b Specify Nationwide Permit (NWP) number 12 or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? N Yes ❑ No 1 d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification — Regular ❑ Non 404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization le Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ® No For the record only for Corps Permit ❑ Yes ® No 1f Is payment into a mitigation bank or in lieu fee program proposed for mitigation of Impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program ❑ Yes ® No 1g Is the project located in any of NC s twenty coastal counties If yes answer 1h below ❑ Yes ® No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2 Project Information 2a Name of project Bunker Hill/ Oxford Schools Sewer Project 2b County Catawba 2c Nearest municipality / town Conover 2d Subdivision name 2e NCDOT only T I P or state project no n/a 3 3a Owner Information Name(s) on Recorded Deed multiple owners see attached list 3b Deed Book and Page No multiple properties see attached list 3c Responsible Party (for LLC if applicable) City of Conover 2 3d Street address IMIR Post Office Box 549 3e City state zip Conover North Carolina 28613 3f Telephone no (828) 465 -8261 3g Fax no 1 (828) 464 5216 3h Email address I donald duncan@conovemc gov Page 1 of 11 PCN Form — Version 13 December 10 2008 Version �� r 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other specify 4b Name 4c Business name (if applicable) 4d Street address 4e City state zip 4f Telephone no 4g Fax no 4h Email address 5 Agent/Consultant Information (if applicable) 5a Name Douglas G Chapman PE 5b Business name (if applicable) McGill Associates P A 5c Street address 124019' Street Lane NW 5d City state zip Hickory North Carolina 28601 5e Telephone no (828) 328 -2024 5f Fax no (828) 328 -3870 5g Email address doug chapman@mcgdlengmeers com Page 2 of 11 PCN Form — Version 13 December 10 2008 Version B Project Information and Prior Project History 1 Property Identification 1a Property identification no (tax PIN or parcel ID) see attached list 1b Site coordinates (in decimal degrees) Latitude 35 7359 Longitude 81 1335 (DD DDDDDD) (DD DDDDDD) 1 c Property size 18 35 acres 2 Surface Waters 2a Name of nearest body of water (stream river etc ) to Lyle Creek proposed project 2b Water Quality Classification of nearest receiving water WS IV 2c River basin Catawba 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Rural residential 3b List the total estimated acreage of all existing wetlands on the property 000 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 3d Explain the purpose of the proposed project Installation of new sewer to serve existing public schools and residential properties 3e Describe the overall project in detail including the type of equipment to be used Installation of new gravity sewer force main sewer sewer pump station and appurtenances Typical excavation and backfill equipment to be used in pipe installation 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property ! ❑Yes ❑ No Unknown project (including all prior phases) in the past? Comments 4b if the Corps made the jurisdictional determination what type ❑ preliminary ❑ Final of determination was made? 4c If yes who delineated the jurisdictional areas? Agency /Consultant Company Name (if known) Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 6 Project History 5a Have permits or certifications been requested or obtained for ® Yes ❑ No ❑ Unknown this project (including all prior phases) In the past? 5b If yes explain in detail according to help file instructions Permits have been obtained for 9 stream crossings During routine inspections by NC DWQ it was determined that a total of 17 crossings permanent and temporary are Included in this project An additional ditch crossing Is included with this application Page 3 of 11 PCN Form — Version 13 December 10 2008 Version 6 Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes explain C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ® Streams tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland Impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (d known) DWQ — non 404 other) (acres) Temporary W1 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ W2 []POT ❑ Yes ❑ No ❑ Corps ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ W6 ❑ P [IT ❑ Yes ❑ No ❑ Corps ❑ DWQ 2g Total wetland impacts 2h Comments Page 4 of 11 PCN Form — Version 13 December 10 2008 Version 3 Stream Impacts If there are perennial or intermittent stream Impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number (PER) or (Corps 404 10 stream length Permanent (P) or Intermittent DWQ — non 404 width (linear feet) Temporary (T) (INT)? other) (feet) S1 ❑ P ®T Excavation and Backfill UT to Lyle Creek ® PER ❑ INT ❑ Corps ❑ DWQ 35 0 S2 ❑ P ®T Excavation and Backfill Lyle Creek ® PER ❑ INT ❑ Corps ❑ DWQ 60 0 S3 ❑ P ®T Excavation and Backfill UT to Lyle Creek ® PER ❑ INT [I Corps ❑ DWQ 35 0 S4 ❑ PST Excavation and Backfill UT to Lyie Creek ❑ PER ® INT [I Corps ❑ DWQ 14 0 S5 [:]PST Excavation and Backfill UT to Lyle Creek ® PER ❑ INT ❑ Corps ❑ DWQ 20 0 S6 []POT Excavation and Backfill UT to Lyle Creek ® PER ❑ INT ❑ Corps ❑ DWQ 35 0 S7 ®P [:IT Excavation and Backfill Mull Creek ® PER ❑ INT [I Corps El DWQ 35 85 S8 [:]POT Excavation and Backfill UT to Lyle Creek ® PER ❑ INT El Corps ❑ DWQ 9 0 S9 ❑ P ®T Excavation and Backfill UT to Lyle Creek ® PER ❑ INT ❑ Corps ❑ DWQ 40 0 S10 ❑ P ®T Excavation and Backfill UT to Lyle Creek ❑ PER ® INT ❑ Corps ❑ DWQ 18 0 S11 [:]POT Excavation and Backfill UT to Lyle Creek ❑ PER ® INT ❑ Corps ❑ DWQ 18 0 S12 ® P ❑ T Excavation and Backfill LIT to Lyle Creek PER ® INT ❑ Corps ❑ DWQ 20 15 S13 ®P ❑ T Excavation and Backfill UT to Lyle Creek ❑ PER ® INT ❑ Corps ❑ DWQ 14 15 S14 ❑ P ® T Excavation and Backfill UT to Lyle Creek ❑ PER ® INT ❑ Corps I ❑ DWQ 13 0 S15 ❑ POT Excavation and Backfill UT to Lyle Creek ❑ PER ® INT 11 Corps ❑ DWQ 6 0 S16 ®P [IT Excavation and Backfill UT to Lyle Creek 11 PER ® INT ❑ Corps [I DWQ 10 15 817 ❑ P ®T Excavation and Backfill UT to Lyle Creek ❑ PER ® INT ❑ Corps ❑ DWQ 3 0 S18 ❑ P ®T Excavation and Backfill LIT to Lyle Creek 11 PER ® INT ❑ Corps ❑ DWQ 3 0 3h Total stream and tributary Impacts 130 3i Comments Permanent Impacts for S7 S12 S13 and S16 All others are temporary impacts only Page 5 of 11 PCN Form —Version 13 December 10 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then Individually list all open water impacts below 4a 4b 4c 4d 4e Open water impact number — Name of waterbody (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Tem ora 01 ❑P 02 ❑P 03 ❑P [IT 04 []P [IT 4f Total open water impacts 4g Comments 6 Pond or Lake Construction If Pond or lake construction proposed then complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded number of pond P1 P2 5f Total 5g Comments 5h is a dam high hazard permit required? ❑ Yes ❑ No if yes permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer Impacts below If any Impacts require mitigation then vou MUST fill out Section D of this form 6a ❑ Neuse ❑ Tar Pamlico ❑ Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number— Reason Buffer Zone 1 impact Zone 2 Impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Tem ra Impact required? ❑Yes B1 ❑P ❑T ❑ No ❑Yes B2 ❑P ❑T D No ❑Yes 63 ❑P ❑T ❑ No 6h Total buffer impacts 61 Comments Page 6 of 11 PCN Form — Version 13 December 10 2008 Version D Impact Justification and Mitigation 1 Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Topography and site issues determined the routing of the sewer line The amount of stream bank disturbance will be restricted as much as possible during construction 1b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques The minimum width necessary for construction equipment/ vehicle passage will be disturbed 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State? ❑ Yes ® No 2b If yes mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes which mitigation option will be used for this protect? ❑ Mitigation bank ❑ Payment to in lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4 Complete if Making a Payment to In lieu Fee Program 4a Approval letter from in lieu fee program Is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete If Using a Permittee Responsible Mitigation Plan 5a if using a permittee responsible mitigation plan provide a description of the proposed mitigation plan Page 7 of 11 PCN Form — Version 13 December 10 2008 Version E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan la Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b If yes then Is a diffuse flow plan Included? If no explain why ❑ Yes ❑ No Comments 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 08% 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan explain why There will be an Increase of impervious surface of approximately 6 200 sf over a project area of 18 35 acres due to the construction of a pump station The remainder of the disturbed area within the project (approximately 18 21 acres) will be returned to its existing conditions 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review 3a In which local government s jurisdiction is this project? ❑ Phase II 3b Which of the following locally implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a Which of the following state implemented stormwater management programs apply ❑ ORW (check all that apply) ❑ Session Law 2006 246 ❑ Other 4b Has the approved Stormwater Management Plan Huth proof of approval been ❑ Yes ❑ No attached? 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 13 December 10 2008 Version F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /stateAocal) funds or the ® Yes ❑ No use of public (federal/state) land? 1b If you answered yes to the above does the project require preparation of an ❑ Yes ® No environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c If you answered yes to the above has the document review been finalized by the State Clearing House? (if so attach a copy of the NEPA or SEPA final approval 0 Yes ❑ No letter) Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ® Yes ❑ No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after the -fact permit application? ® Yes ❑ No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) see attached Notice of Violation issued on May 12 2012 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in Yes ® No additional development which could Impact nearby downstream water quality? 3b If you answered yes to the above submit a qualitative or quantitative cumulative Impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility Conveyance to an existing City of Conover pump station for conveyance through the City's wastewater collection system and eventually the City s Northeast WWTP for treatment and discharge Page 10 of 11 PCN Form — Vernon 13 December 10 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ® Yes ❑ No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? El Raleigh 5c If yes ind icate the USFWS Field Office you have contacted ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? http //www fws gov /nc -es /es /countyfr html 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? http //ocean flondamanne org/effi_corairimstviewer htm 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g National Historic Trust designation or properties significant In North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would Impact historic or archeological resources? http / /gis ncdcr gov/hpoweb/ 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA designated 100 year floodplain? ® Yes ❑ No 8b If yes explain how project meets FEMA requirements No permanent fill will be Installed as a part of this project 8c What source(s) did you use to make the floodplain determination? http / /gis catawbacountync gov /parcel/ Douglas G Chapman, PE ieo 'S /2 Applicant/Agents Printed Name piicant/Ag nts Signature Date (Agents signature acid only if an authonzation letter from the applicant is rovided Page 11 of 11 PCN Form — Version 13 December 10 2008 Version Bunker Hill/ Oxford School Sewer Project PCN Attachment Stream Crossing #1 Owner Fred A Crump Barbara L Crump Latitude/ Longitude 35 7650 811674 Deed Book/ Page 1784/0746 PIN 3754 19 60 9576 Stream Crossing #2 Owner Thomas Watson Danner Jr Latitude/ Longitude 35 7358 811344 Deed Book/ Page 2003E/1007 PIN 3763 04 60 7274 Stream Crossing #3 Owner Freida Spencer Matthews Latitude/ Longitude 35 7411 811310 Deed Book/ Page 1031/0747 PIN 3763 04 718551 Stream Crossing #4 Betty Danner Flatt Owner H Delane Stewart Michael D Stewart Latitude/ Longitude 35 7464 811267 Deed Book/ Page 2237/0962 PIN 3673 04 83 8423 Stream Crossing #5 Owner Latitude/ Longitude Deed Book/ Page PIN Stream Crossing #6 Owner Latitude/ Longitude Deed Book/ Page PIN Byron Archibald Scott Jr Linda S Scott 35 7491 811275 2141/1500 3763 04 84 9343 Steven W Teague 35 7522 811275 2336/1846 3763 02 85 8218 F \06822 CATAWBA CO ASST BUNKER HILL HS AREA SEWER \02_Design Phase \Documents \PCN \Attachment docx Page 1 of 3 Bunker Hill/ Oxford School Sewer Project PCN Attachment Stream Crossing #7 Owner Latitude/ Longitude Deed Book/ Page PIN Stream Crossing #8 Owner Latitude/ Longitude Deed Book/ Page PIN Stream Crossing #9 Owner Latitude/ Longitude Deed Book/ Page PIN Stream Crossing #10 Owner Latitude/ Longitude Deed Book/ Page PIN Stream Crossing #11 Owner Latitude/ Longitude Deed Book/ Page PIN Stream Crossing #12 Owner Latitude/ Longitude Deed Book/ Page PIN James Franklin Moser 35 7361 811360 2007E/1067 3762 07 59 5575 Rock Barn Properties Inc 35 7393 811506 2249/0465 3763 03 40 3022 Rock Barn Properties Inc 35 7408 811577 2017/1853 3753 04 90 5758 Fred A Crump Barbara L Crump 35 7650 811676 1784/0746 3754 19 60 9576 Jason Daniel Little, Alice I Little 35 7643 81167 0978/0115 3753 07 79 3993 Jason Daniel Little Alice I Little 35 7612 811655 0978/0115 3753 07 79 3993 Page 2 of 3 F \06822 CATAWBA CO ASST BUNKER HILL HS AREA SEWER \02_Design Phase \Documents \PCN \Attachment docx Bunker Hill/ Oxford School Sewer Project PCN Attachment Stream Crossing #13 Owner Latitude/ Longitude Deed Book/ Page PIN Stream Crossing #14 Owner Latitude/ Longitude Deed Book/ Page PIN Stream Crossing #15 Owner Latitude/ Longitude Deed Book/ Page PIN Stream Crossing #16 Rock Barn Properties Inc 35 7999 811464 2249/0465 3763 03 40 3022 Rock Barn Properties Inc 35 7381 811394 2249/0465 3763 03 40 3022 Johnny Calvin Kistler Jr 35 7432 811283 2089/1389 3763 04 815596 Merrill D Kistler Owner H Delane Stewart Michael D Stewart Latitude/ Longitude 35 7446 811268 Deed Book/ Page 2237/0962 PIN 3763 04 83 8423 Stream Crossing #17 Owner Donovan R Phillips Rebecca B Phillips Latitude Longitude 35 7521 811258 Deed Book/ Page 2629/0673 PIN 3763 02 95 8396 Stream Crossing #18 Owner Donovan R Phillips Rebecca B Phillips Latitude Longitude 35 7520 811238 Deed Book/ Page 2629/0673 PIN 3763 02 95 8396 F \06822 CATAWBA CO ASST BUNKER HILL HS AREA SEWER \02_Design Phase \Documents \PCN \Attachment docx Page 3 of 3 46wj ► NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Waklld P E Dee Freeman Governor Director Secretary May 15 2012 City of Conover Mr Doug Chapman P O Box 549 Conover NC 28613 Subject Notice of Violation 401 Water Quality Certification NOV 201200178 Construction Stormwater Permit — NCGO 10000 NOV 201200178 Bunker Hill Rd /Oxford School Rd Sewer Project Catawba County North Carolina Dear Mr Chapman On May 9, 2012, staff from the Mooresville Regional Office (MRO) conducted an investigation at the subject site This letter is being issued as a Notice of Violation for the impacts observed at the site and for the failure to comply with your State General Construction Stormwater Permit that was issued along with the approval for the sediment and erosion control plan 401 Water Quality Certification, General Certification #3699 • Violation Failure to properly delineate the streams and obtain a Nationwide Permit #12 for four (4) stream crossings within the construction corridor • Violation Failure to comply with the construction stormwater permit (condition #4) • Violation Failure to bury the nprap so that the natural stream elevation and dimension is maintained (condition #9) • Violation Failure to maintain a 10 ft buffer along top of stream bank and the construction corridor (condition #12) • Corrective Action Submit a PCN showing all stream crossings and the sewer alignment relative to the stream As discussed at the site, if nprap is not required to protect the sewer line, then soft stream stabilization methods should be used (sloping banks coin fiber mattmg, and seedmg) If nprap is to be used it should be shown as a permanent impact in the PCN The nprap that was in place at the time of the site visit shall remain, with the exception of the di r pad located at the second culvert which shall be shortened as discussed O� Mooresville Regional Office One Location 610 East Center Avenue Suite 301 Mooresville NC 28115 V _ n�� NorthCarohna Phone (704) 663 1699Tax (704) 663 6040\ Customer Service 1 877 623 -6748 / a'jR �t�y�� //� Internet www ncwaterauality ora (/ ►� ` ` l An Eaual ODoortunity /Affirmative Action Emolover — 50 A Recvcled/10 /o Post Consumer Paoer Construction Stormwater Permit — NCGO10000 • Violation Failure to install a ram gauge at the site • Violation Failure to keep of record of rain events • Violation Failure to keep a record of the inspection of the sediment and erosion control measures • Corrective Action Install a ram gauge at the site If necessary install as many as required to properly document ram events along the construction corridor Begin maintaining a record of ram events and the inspection of the sediment and erosion control measures These must be recorded and maintained and available for review by the state upon request Tins Office requires that the violations as stated above, be abated immediately It is requested that a written response be submitted by May 30, 2012 indicating the actions taking to resolve the violations and a tnmehne for submitting the PCN Please note, these violations and any future violations may be subject to civil penalty assessments of up to $25 000 00 per day, per violation Should you have any questions regarding this matter please contact Alan Johnson at (704) 663 1699 Sincerely Robert B Krebs Regional Supervisor Surface Water Protection Section cc Shelton Sullivan Comphance/Enforcement Steve Kitchefski Army Corp Asheville Land Quality MRO, Catawba County McGill Associates R J Mozeley 1240 19`" St, Lane NW Hickory NC 28601 PLAN 40 D 20 40 80 GRAPHIC SCALE I INCH = 40 FEET PROPOSED SANITARY SEWER (TYP) I �� TOP OF BANK (TYP) i PROPOSED LIMITS OF`1 DISTURBANCE (TYP) / 'C PROPOSED MANHOLE (TYP ) FlL"3 9 c� FA i� lja� I II I / I I ' PROPOSED TEMPORARY PERENNIAL STREAM CROSSING 1 1 1 I (TYP) SEE DETAIL SHEET C -121 25 LF MAXIMUM IIII! II ALLOWABLE TEMP DISTURBANCE r I I iI �' ' l I / c� FA i� lja� I II I / I I ' PROPOSED TEMPORARY PERENNIAL STREAM CROSSING 1 1 1 I (TYP) SEE DETAIL SHEET C -121 25 LF MAXIMUM IIII! II ALLOWABLE TEMP DISTURBANCE I I iI �' ' l I / lIII 111 I l 1/ PROPOSED SEWER FOR Joe NO YSezz DATE MAY 2012 SHEET BUNKER HILU OXFORD DESIGNED BY Sww CARD BY RLC qMcGifl DESIGN REVIEW _ A S S O C I A T E S SCHOOL SEWER PROJECT CONST REVIEW_ CREEK CROSSING #1 C-102 ENGINEERING PLANNING FINANCE umPaes�ulmplP �PZtcna PfLomn m Himu m cow CATAWBA COUNTY NORTH CAROLINA SASE fa 401404 ev I RAS &g PLAN ao 0 20 ao so GRAPHIC SCALE 1 INCH = 40 FEET PROPOSED MANHOLE (TYP ) PROPOSED SANITARY SEWER (TYP ) I ftwo ON pl l llllll l � LIMITS OF DISTURBANCE (TYP ) 11 111 � Ill s � CREE K Sri j TOP OF BANK (TYP) J PROPOSED TEMPORARY PERENNIAL STREAM CROSSING (TYP) SEE DETAIL SHEET �C-121 50 LF MAX TEMP j DISTURBANCE ,1--< PROPOSED SEWER FOR DAM Yea22 SHEET @McGinDATE MAY 2072 BUNKER HILU OXFORD DESIGNED BY BWW CADD BY RLC A s s o C I A T E s SCHOOL SEWER PROJECT DESIGN RE%nEW _ CREEK CROSSING #2 CONST REVI EW- ER INO PLANNING FINANCH CATAWBA COUNTY NORTH CAROLINA SASEf 401404 17pN1Effl�IAmNw mm wNcnm moans G F umm COLA .181 m RAS Mwg PLAN 40 0 20 40 80 GRAPHIC SCALE 1 INCH = 40 FEET N TOP OF BANK (TYP) / � \ ` — \ PROPOSED SANITARY SEWER (TYP ) INSTALLED BELOW /I 40k \� ��1 \\ I ROCK SHELF It PROPOSED TEMPORARY PERENNIAL STREAM CROSSING (TYP) SEE DETAIL SHEET C -121 50 LF MAX ALLOWABLE ail (TEMP DISTURBANCE / LIMITS OF DISTURBANCE (TYP ) i PROPOSED MANHOLE (TYP ) It I PROPOSED SEWER FOR DATE Yaezz SHEET McGifl DATE MAY 2072 BUNKER H1LU OXFORD DESIGNEDHY SLAIN CADD BY RLC CHOOL SEWER PROJECT CONST REVIEW _ CREEK CROSSING #3 ASSOCIATES S ONST REVIEW_ C-104 ENGINBBRING PLANNING FINANCE �sEt ao�aaa .,,,�,� Lmmw �,c�, lmommm P,� � CATAWBA COUNTY NORTH CAROLINA � �, ,� ,�, PLAN 40 0 20 40 80 GRAPHIC SCALE 1 INCH = 40 FEET N \ \ � i \ \\ \\ PROPOSED SEWER (TY SANITARY TOP OF BANK (TYP ) -61b N PROPOSED MANHOLE (TYP ) \ \ \ �' \ --REMOVE RIP RAP PLACED DURING CONSTRUCTION (TYP ) �r-- aL - -- EXISTING CULVERT BY I PROPERTY OWNER TO II REMAIN PROPOSED TEMPORARY INTERMITTENT STREAM CROSSING '(TYP) SEE DETAIL SHEET C -121 I DISTURBANCE TO BE KEPT TO THE MINIMUM REQUIRED P) lIII( � I \ \ \1\ I I LIMITS OF DISTURBANCE (TYP) @cGm PROPOSED SEWER FOR DAM Y 201 SHEET M DATE MAY C BUNKER HILLI OXFORD DESIGNED BY Sww CADD BY MC DESIGN REVIEW _ CREEK CROSSING #4 A S S o C i A T E S SCHOOL SEWER PROJECT CONST REVIEW_ BuioNnmQmIffiNBu PLANNING FINANCE �, C -105 mmw Em �luam aogmmm �»m cs CATAW13ACOUNW NORTH CAROLINA ,.. 401404 AS d.9 PLAN 40 0 20 40 80 GRAPHIC SCALE 1 INCH = 40 FEET 0 PROPOSED SANITARY I SEWER (TYP ) t i !.I TOP OF BANK (NP) 1' i REMOVE CREEK CROSSING PROPOSED MANHOLE (NP) REMOVE RIP RAP FOR TEMPORARY CROSSING of C. rl / cy C LIMITS OF DISTURBANCE (TYP) w I I 1 I � I — 1 I I 1 I 1 I I � 1 I 1 1 11 1 r PROPOSED TEMPORARY r PERENNIAL STREAM CROSSING (TYP ) SEE DETAIL SHEET C -121 t DISTURBANCE TO BE KEPT _ TO THE MINIMUM REQUIRED pSS114G CREEK �R CR \' -- eMcGfll PROPOSED SEWER FOR JOB NO Yeezz SHEET DATE MAY REVIEW BUNKER HILLI OXFORD DESIGNED BY Bwuv CADD BY RLC oesicN REVIEW_ CREEK CROSSING #5 A s S o C i A T E s SCHOOL SEWER PROJECT CONST REVIEW_ C -106 BNGIN BERING PLANNING FINANCE BASEL 451454 u„�,�t mww �Nc2, mmm, mot= c m CATA VBA COUNTY NORTH CAROLINA o , �, RPB aw PLAN 40 0 20 40 80 GRAPHIC SCALE I INCH = 40 FEET \ I 1 \ PROPOSED CREEK \ \I \ \ CROSSING NO 17 \ 1 \ \ SEE SHEET C -118 Iona I \— SSj ,' I PROPOSED SANITARY SEWER (TYP ) 1 \ ` \ PROPOSED MANHOLE (TYP ) PROPOSED TEMPORARY ?A* PERENNIAL STREAM CROSSING (TYP) SEE DETAIL SHEET C -121 DISTURBANCE TO BE KEPT TO THE MINIMUM REQUIRED LIMITS OF DISTURBANCE (TYP ) TOP OF BANK (TYP ) Ilk PROPOSED SEWER FOR JOB NO eW2" SHEET McGfil DATE MAY 2012 BUNKER HILLI OXFORD DESIGNED BY SWW CARD BY RLC DESIGN REVIEW CREEK CROSSING #6 �-� O� A s s o C i A T E s SCHOOL SEWER PROJECT CONST REVIEW ENGINEERING PLANNING FINANCE Baser noaoa l=N&0 lA=N„ �NCUM m�,mM =� � CATAWM COUNTY NORTH CAROLINA .,sc' PLAN 40 0 20 40 80 GRAPHIC SCALE I INCH = 40 FEET N PROPOSED SANITARY SEWER (TYP ) l y� F C-14 85 LF OF PROPOSED PERMANENT IMPACT FOR RIP -RAP � PERENNIAL STREAM CROSSING (TYP) SEE DETAIL SHEET C -122 a P OF BANK (TYP ) V,,.,, , - -I -I- , JPRANCE (TYP ) • PROPOSED SEWER FOR DAB 'MAY �1z SHEET C G BUNKER HILLI OXFORD CADDBEDBY SWW CARD BY RLC A s S o C I A T E s SCHOOL SEWER PROJECT CONST REVIEW CONST REVIENF_ CREEK CROSSING #7 C-108 ENGINEERING PLANNING FINANCE __ —Now CATAWBACOUNTY NORTH CAROLINA BASE 401404 mmq4>4m MM>MM C40 .wsi RABrawg PLAN 40 0 20 40 80 GRAPHIC SCALE 1 INCH = 40 FEET N . 000 r— TOP OF BANK (TYP ) LYLE CREEK aL REMOVE RIP —RAP INSTALLED DURING CONSTRUCTION PROPOSED TEMPORARY PERENNIAL STREAM CROSSING SEE DETAIL SHEET C -121 90 LF MAX ALLOWABLE TEMP DISTURBANCE EXISTNG RCP BY PROPERTY OWNER TO REMAIN LIMITS OF DISTURBANCE (TYP) PROPOSED SANITARY SEWER (TYP ) @cGin PROPOSED SEWER FOR DATE Y 01 SHEET M DATE MAY C BUNKER HILU OXFORD DESIGNED BY Swuv CADD BY RLC oESIGNaEVIEW_ CREEK CROSSING #8 A s s o C z A T E s SCHOOL SEWER PROJECT CONST REVIEW_ C -109 ENGINEERING PLANNING FINANCH 1wlw�ru SASEI 4014 04 mllw �rm:2= oomm 4[1m can CATAWM COUNTY NORTH CAROLNA eIs1, RAS dw g PLAN 40 0 20 40 80 GRAPHIC SCALE I INCH = 40 FEET 0 TOP OF BANK (TYP ) REMOVE TEMPORARY CREEK CROSSING & RIP -RAP FOLLOWING CONSTRUCTION �rftft.� PROPOSED TEMPORARY PERENNIAL STREAM CROSSING SEE DETAIL SHEET C -121 50 LF MAX ALLOWABLE TEMP DISTURBANCE LIMITS OF DISTURBANCE (TYP ) PROPOSED SANITARY SEWER (TYP ) a\ • PROPOSED SEWER FOR on�vMav 2012 SHEET MC G BUNKER HILU OXFORD DESIGNED BY SWW CARD BY me A s S O C I A T E s SCHOOL SEWER PROJECT DESIGN REVIEW _ CONST REVIEW _ CREEK CROSSING #9 C-1 10 PLANNINd PINANCH EN(iINEmnw CATAWMWUNW NORTH CAROLINA —"I "%1404 I3olAlSl�utBN6 �ita9mt ta�puaw 1�1t�m caw mm evi RA&dW PLAN 40 0 20 40 80 GRAPHIC SCALE 1 INCH = 40 FEET PROPOSED TEMPORARY INTERMITTENT STREAM CROSSING SEE DETAIL SHEET C -120 DISTURBANCE TO BE KEPT TO THE MINIMUM REQUIRED EXISTING CULVERT BY PROPERTY OWNER TO BE ' I RESTORED FOLLOWING SEWER LINE INSTALLATION REMOVE RIP —RAP INSTALLED DURING CONSTRUCTION PROPOSED SANITARY SEWER (TYP) PROPOSED MANHOLE (TYP) \ PROPOSED WA `E TOP OF BANK (TYP) \ o LIMITS OF DISTURBANCE (TYP) PROPOSED SEWER FOR D JOB NO Y 201 @McGRI DATE MAY LC SHEET BUNKER HILU OXFORD DESIGNED BY Sww CADD BY RLC A s s o C I A T E s SCHOOL SEWER PROJECT CONST REwEw_ CREEK CROSSING #10 CONST REVIENh_ C-1 11 .NW PLANNING FINANCE CATAWMCOUNTY NORTH CAROLINA SASEa01 uavma�rwmxn �ricami tagmaw ��M couv PLAN 40 0 20 40 s0 GRAPHIC SCALE 1 INCH = 40 FEET TOP OF BANK (TYP ) \ \\ PROPOSED TEMPORARY INTERMITTENT \ STREAM CROSSING SEE DETAIL SHEET C -121 \ DISTURBANCE TO BE KEPT TO THE MINIMUM REQUIRED PROPOSED WATTLE PROPOSED MANHOLE (TYP ) 11 ,0 EXISTING CULVERT BY \ \ V PROPERTY OWNER TO �� ` REMAIN EXTENSION FOR CONSTRUCTION PHASE TO BE REMOVED REMOVE RIP -RAP INSTALLED DURING \\ \ \ CONSTRUCTION PROPOSED SANITARY SEWER (TYP) LIMITS OF DISTURBANCE (TYP)_/l\ \ 1 amcGiff PROPOSED SEWER FOR JOB NO Y 201 SHEET DATE MAY LC BUNKER HILLI OXFORD DESIGNED BY Sww CADD BY RLC A S s o C I A T E s SCHOOL SEWER PROJECT DESIGN REVIEW _ CREEK CROSSING #11 CONST REVIEW_ C -112 ENGINEERING PLANNING FINANCE eASEr aoiaaa ,®N„ ���, m�, CATAWBACOUNTY NORTH CAROLINA NJ I RAe Mg PLAN 40 0 20 40 80 GRAPHIC SCALE 1 INCH = 40 FEET N 1 ' RMANCWT INSTALL 15 LF OF 18 HDPE CULVERT FOR PERMANENT PROPOSED PE ' INTERMITTENT STREAM CROSSING SEE DETAIL SHEET C -122 i 15 LF MAX ALLOWABLE PERMANENT IMPACT �I ' I PREMOVE TEMPORARY CREEK - - - CROSSING AFTER ' CONSTRUCTION IS COMPLETE PROPOSED SANITARY \ I SEWER (NP) --\\ II • A D jQ11 • ►� RIP-RAP DURING CONSTRUCTION `\ PROPOSED SEWER FOR °° °z SHEET " MCG BUNKER HILL/ OXFORD ATE " r,�Y �,L/ DESIGNED BY Sww in CARD BY KC A s s o c i A T E s SCHOOL SEWER PROJECT oesicNREwEw_ CREEK CROSSING #12 CONST REVIEW_ C/ -113 EN6INHERINd PLANNINd PINANCH CATAWBACOUNTY NORTH CAROLINA �E' 4° 404 Utl�9uS=1Al®lav �7lacamt PHo9m�1 P.tlJl� cam PROPOSED MANHOLE (TYP ) 1 TOP OF BANK (TYP ) \A\ LIMITS OF DISTURBANCE (NP) i �CD T481 t18 RABr Qv10 PLAN 40 0 20 40 80 GRAPHIC SCALE 1 INCH = 40 FEET N N v TOP OF BANK (TYP ) PROPOSED PERMANENT INTERMITTENT STREAM CROSSING SEE DETAIL SHEET C -122 15 LF PERMANENT IMPACT MAX TEMP IMPACT TO BE KEPT TO A MINIMUM INSTALL 15 LF 24 HDPE CULVERT FOR PERMANENT CROSSING I REMOVE TEMPORARY CREEK CROSSING FOLLOWING CONSTRUCTION PROPOSED SANITARY SEWER (TYP) o LIMITS OF DISTURBANCE (TYP ) JOB PROPOSED SEWER FOR DAM Dean SHEET eMcGH1 DATE MAY LC BUNKER HILLI OXFORD DESIGNED BY Sww CARD BY RLC A s s o C I A T E s SCHOOL SEWER PROJECT CONST REVIEW'_ CREEK CROSSING #13 ONST REVIEIM_ n � 14 BNGINEERING PLANNING FINANCE BASEL amnoa v CATAWM COUNTY NORTH CAROLINA „Y,,, % RAe may PLAN 40 0 20 40 s0 GRAPHIC SCALE 1 INCH = 40 FEET N TOP OF BANK (TYP ) PROPOSED WATTLE REMOVE RIP -RAP ADDED DURING CONSTRUCTION,, _ - -- I I I I I � I I REMOVE TEMPORARY CREEK CROSSING FOLLOWING CONSTRUCTION LIMITS OF DISTURBANCE (TYP ) PROPOSED TEMPORARY -'INTERMITTENT STREAM CROSSING SEE DETAIL SHEET C -120 DISTURBANCE TO BE KEPT TO THE MINIMUM I REQUIRED PROPOSED SANITARY SEWER (TYP ) 0 PROPOSED SEWER FOR 1— SHEET DATE @McGiff MAY 2012 BUNKER HILU OXFORD DESIGNED BY SWW CADD BY RLC DESIGN REVIEW_ CREEK CROSSING #14 A s s o C i A T E s SCHOOL SEWER PROJECT CONST REVIEW_ C -115 HNGINHHRING PLANNING PINANCH SASE 10 40 404 pW191hdItB��A,mNN Saaaymm momma mmr� ems CATAWMCOUWY NORTHCAROLINA rAW m wOrdwg PLAN 40 0 20 40 s0 GRAPHIC SCALE 1 INCH = 40 FEET N Lu TOP OF BANK (TYP) PROPOSED MANHOLE (TYP PROPOSED INTERMITTENT STREAM CROSSING / SEE DETAIL SHEET C -120 DISTURBANCE TO BE KEPT / PROPOSED WATTLE TO THE MINIMUM REQUIRED J , ale / i oloo 00/o/ _'oo Ile EXISTING CULVERT BY PROPERTY OWNER TO 'REMAIN 000 / / REMOVE TEMPORARY CREEK �/ CROSSING FOLLOWING CONSTRUCTION WOO/ REMOVE RIP -RAP ADDED DURING CONSTRUCTION LIMITS OF DISTURBANCE (TYP ) PROPOSED SANITARY SEWER (TYP ) PROPOSED SEWER FOR JOB NO MAY DATE MAY 2012 SHEET / \/'�_' 1• Mme/ BUNKER HILLI OXFORD DESIGNED BY SVNN CADD BY RLC DESIGN REVIEW _ CREEK CROSSING #15 iii A s s o C I A T E s SCHOOL SEWER PROJECT CONST REVIEW _ C-1 16 HNdINEmyw mm PLANNING FINANCE CATAMACOUNTY NORTHCAROLINA uallna>ffi,ulmmr �rwcmm tatogami. Pmtl7�im cas &15E fo 401 04 evl i � RAB dvq PLAN 40 0 20 40 80 GRAPHIC SCALE I INCH = 40 FEET N TOP OF BANK (TYP) � III I � III I PROPOSED SANITARY IIIII I ' SEWER (TYP ) cv %III I PROPOSED 15 LF OF II II 1 ' 24" CMP FOR 1111 ' I PERMANENT CROSSING i � 1► II 1 PROPOSED PERMANENT INTERMITTENT STREAM CROSSING SEE DETAIL SHEET C -122 15 LF MAX ALLOWABLE PERM DISTURBANCE PROPOSED WATTLE ' cv 1 PROPOSED MANHOLE (TYP) ' EXISTING TREE TO BE I / PROTECTED C I LIMITS OF DISTURBANCE (TYP) 1 / _' ecGifl PROPOSED SEWER FOR -DB NO ' 8.1 SHEET M DATE MAY LC BUNKER HILV OXFORD DESIGNED BY SWAI CADD BY RLC ASSOCIATES SCHOOL SEWER PROJECT DESIGN REVIEW_ CREEK CROSSING #16 CONST REVIEW HNGIN88RING PLANNING FINANCE SASEfo aot4od C-1 17 IMN, � „c„m momzs , mum= Gm CATAWBA COUNTY NORTH CAROLINA , , % ,,,,� e„9 PLAN 40 0 20 ao so GRAPHIC SCALE 1 INCH = 40 FEET PROPOSED TEMPORARY \ INTERMITTENT STREAM CROSSING (TYP) SEE DETAIL SHEET C -120 DISTURBANCE TO BE / / KEPT TO THE MINIMUM REQUIRED / / PROPOSED MANHOLE (TYP) PROPOSED SANITARY \\ / `: N,\ �,'� i SEWER (TYP) 000 �.' Mown S S—\ mom , ,PROPOSED STREAM CROSSING #6 SEE SHEET C -107 LIMITS OF DISTURBANCE (TYP ) TOP OF BANK ( TYP ) PROPOSED SEWER FOR JOB NO Ysazz SHEET @McGH1 DATE MAY 2012 BUNKER HILU OXFORD DESIGNED BY Sww CARD BY RLC DESIGN REVIEW_ CREEK CROSSING #17 A s s o C i A T E s SCHOOL SEWER PROJECT CONST REVIEW— C -118 BNGINBBRING PLANNING FINANCE CATAWBA COUNTY NORTH CAROLINA BASE rw 401404 171D1A47!ffi.W)MNW mmoum:aml laQmmm === coca vls� RA&dvg PLAN 40 0 20 40 80 I 000000000L— GRAPHIC SCALE 1 INCH = 40 FEET I — `-- - - -_ —_- EXISTING MANHOLE PROPOSED SANITARY_ -_ `_- -� -- SEWER (TYP) PROPOSED DITCH CROSSING / DISTURBED AREA TO BE / RESTORED IN ACCORDANCE / ' WITH DETAIL SHEET C -120 LIMITS OF DISTURBANCE (TYP) \ I I -_� N \ I I PROPOSED SEWER FOR JOB No Y 201 SHEET McGfll DATE MAY 2012 BUNKER HILU OXFORD DESIGNED BY Sww CADD BY RLC DESIGN REVIEW CREEK CROSSING #18 ASSOCIATES SCHOOL SEWER PROJECT CONST REVIEW-- C% -119 ENGINEERING PLANNING FINANCH BASE' ""' ,nift mtmNw �rnc= mommaw ,mamm cas CATAWBACOUNTY NORTH CAROLINA i , RAS dM NOTE FOR USE AT STREAM CROSSINGS WITHOUT LIVE FLOW I-�-- VAR I ES-- -� ry TOP OF BANK (TYP ) LIMITS OF DISTURBANCE (TYP ) 0 O J LL. LL_ O Z O U ry PROPOSED SEWER - 0 �-- -VAR I Ems- --►I STREAM BED (TYP ) WATTLE ENTIRE DISTURBED AREA TO BE SEEDED IN ACCORDANCE WITH SCHEDULE INSTALL NA GREEN C125 BN (OR APPROVED EQUAL) ON DISTURBED AREA PROPOSED SEWER FOR DAB ru,Y �o,2 SHEET BUNKER HILU OXFORD DESIGNED BY sww CARD BY RLC TEMPORARY STREAM IMPACT @McGml DESIGN RenEW_ RESTORATION DETAIL DRY A S S O C I A T E s SCHOOL SEWER PROJECT oNSr REwEw, CONST INTERMITTENT STREAMS Cj -120 ENGINEERING PLANNING FINANCE CATAWM COUNTY NORTH CAROLINA BASEf �� xi,- �, ,m= i.m„� mum= cam .A i ,,, ,� � NOTE 1 FOR USE AT STREAM CROSSINGS WITH LIVE FLOW 2 ALL RESEEDING IN AREAS WITH STREAM DISTURBANCE SHALL BE PERFORMED ACCORDING TO NOTE # 6 ON SHEET D4 OF THE CONSTRUCTION PLANSET 3 ADDITION OF LIVE STAKES ACCORDING TO SHEET D4 OF THE CONSTRUCTION PLANSET TO BE PERFORMED IN AREAS AS DIRECTED BY THE ENGINEER RIES —►I Do cb i Ld ry co �� I TOP OF BANK (TYP ) LIMITS OF DISTURBANCE (TYP ) 0 LL_ LL_ 0 z 0 I= 0 Lv 0 NOTE STREAM CROSSING SHALL CONFORM TO THE DETAILS OF THE CONSTRUCTION PLANSET (SHEETS D3 & D4) FOR INSTALLATION OF COFFER DAMS PROPOSED SEWER �--- -VAR I ES►i 71/ �I \ \l/ \V \1/ WATER SURFACE (TYP ) � ENTIRE AREA TO BE SEEDED IN ACCORDANCE WITH PLANS INSTALL NA GREEN C125 BN (OR APPROVED EQUAL) ON DISTURBED AREA • PROPOSED SEWER FOR DAW'MAY 2012 TEMPORARY STREAM IMPACT SHEET M /'� (V_ BUNKER HILLI OXFORD DESIGNED BY SVWV CADDBY w.c RESTORATION DETAIL WET A S S O C I A TES SCHOOL SEWER PROJECT CONST REVIEW— CONST REVIEW— INTERMITTENT & PERENNIAL STREAMS C/ 121 ENdINEERINd PLANNINd FINANCE CATAWBA COUNTY NORTH CAROLINA BASEf wlcoa IM„,� �Ncn, mo,» mu� � ,,,, i ' � NOTE 1 FOR USE AT STREAM CROSSINGS WITH LIVE FLOW 2 ALL RESEEDING IN AREAS WITH STREAM DISTURBANCE SHALL BE PERFORMED ACCORDING TO NOTE # 6 ON SHEET D4 OF THE CONSTRUCTION PLANSET 3 ADDITION OF LIVE STAKES ACCORDING TO SHEET D4 OF THE CONSTRUCTION PLANSET TO BE PERFORMED IN AREAS AS DIRECTED BY THE ENGINEER 4 ADD CULVERT PIPES AS INDICATED ON INDIVIDUAL PLAN SHEETS 5 ALL RIPRAP INSTALLED BELOW THE WATER SURFACE SHALL BE IMBEDDED IN THE STREAM BOTTOM TO ALLOW UNIMPEDED STREAM FLOW — PROPOSED SEWER –I i m ch Ld , cy- NOTE STREAM CROSSING SHALL CONFORM TO THE DETAILS OF THE CONSTRUCTION PLANSET (SHEETS D3 & D4) FOR INSTALLATION OF COFFER DAMS 0 J Li o ENTIRE AREA TO BE SEEDED IN ACCORDANCE o WITH PLANS INSTALL F- NA GREEN C125 BN w (OR APPROVED EQUAL) 0 ON DISTURBED AREA R I ES ---►� MA .. .�.�� 10 � t L TOP OF BANK (NP ) LIMITS OF DISTURBANCE (TYP ) WATER SURFACE (TYP ) i 12 -18 CLASS B RIP RAP RESLOPE STREAM BANK TO ORIGINAL CONTOURS (TYP ) PROPOSED SEWER FOR DATE MAY 2012 SHEET @McGin BUNKER HILLI OXFORD DESI BY DESIGNED BY SVJW caoosY Ric PERMANENT STREAM IMPACT A S S o C i A T E s SCHOOL SEWER PROJECT DESIGN REVIEW _ coNST REVIEW _ RESTORATION DETAIL C 122 SNGINBERING PLANNING FINANCE CATAWBA COUNTY NORTH CAROLINA SASE 1, 401404 -I L ynrom� — � wcam mamm&= HIM== C40 w 1 rt RABrft 8' MAX FOR STD. STRENGTH FABRIC WITH WIRE MESH REINFORCEMENT SYNTHETIC FILTER FABRIC ATTACHED TO POSTS WITH APPROVED FASTENERS. PLACE I UPHILL SIDE OF FENCE. 11 SYNTHETIC FILTER FABRIC SHALL BE i I BACKFILLED A MIN. OF 8" u u SILT FENCE POST - SYNTHETIC FILTER FABRIC 18" GROUND MAX. u 8» EXCAVATE 8 "x8" TRENCH UPSLOPE ALONG LINE OF POSTS. EXTEND FILTER FABRIC INTO TRENCH, BACKFILL TRENCH AND COMPACT SOIL NOTES: 1. FILTER BARRIERS SHALL BE INSPECTED 3. SEDIMENT DEPOSITS SHALL BE REMOVED IMMEDIATELY AFTER EACH RAINFALL AND AFTER EACH STORM EVENT AND WHEN DAILY DURING PROLONGED RAINFALL. DEPOSITS REACH APPROXIMATELY 1/3 REPAIR SHALL BE MADE AS NECESSARY. HEIGHT OF BARRIER. 2. FABRIC SHALL BE REPLACED PROMPTLY 4. SILT FENCE SHALL HAVE A WOVEN FABRIC IF FOUND TO BE IN DISREPAIR. REINFORCEMENT. t-\ A %/A=n AA ATC0I At 01 AOC7n PRECAST CONCRETE BARRIER - A CREEK WATER FLOW PIPE SANDBAGS AT ANY r- OPENINGS m )• CREEK J \- STREAM 3 BED PIPE NOTES: SECTION AA 1. COFFER DAM WI'-L BE BUILT SO THAT APPROXIMATELY ONE -HALF (1/2) 4. STREAM BED SHALL BE DISTURBED THE MINIMUM REQUIRED FOR OF THE STREAM. CHANNEL IS OPEN AT ALL TIMES. CONSTRUCTION OF PIPE LINE AND WILL BE RESTORED TO ORIGINAL 2. MATERIAL FROM, STREAM BED SHALL NOT BE USED FOR COFFER DAM. CONTOURS WHEN WORK IS COMPLETE. 3, NO EARTHEN MAJERIAL SHALL BE USED FOR COFFER DAM OR PLACED 5. ALTERNATIVE COFFER DAM MATERIAL IS ACCEPTABLE BUT SHALL IN STREAM FOR ANY REASON. BE APPROVED BY THE ENGINEER. CR K OR RIVER CROSSING- (LARGE CREEKS AND RIVER) EXISTING GRADE (SEE TRENCHING DE ",a1L) STREAM PROTETI ING EX VATI NOTES: 1. THIS DETAIL SHALL BE USED WHERE NOTL_D ON THE PLANS OR ANYWHERE SEPARATION BETWEEN THE SEWER OR WATER LINE AND STREAM IS LESS THAN 25 FEET. 2. SILT FENCE IN THESE AREAS SHALL BE ':' STALLED PRIOR TO BEGINNING EXCAVATION FOR THE PROPOSED LINE. 3. EXCAVATED MATERIAL SHALL BE PLACED ON SIDE OF TRENCH AWAY FROM STREAM. 4. STREAM PROTECTION AREA SHALL BE SEEDED IMMEDIATELY AFTER INSTALLATION OF PROPOSED LINE. 5. SILT FENCE SHALL BE MAINTAINED UNTIL VEGETATIVE COVER IS ESTABLISHED. WASHED STONE v )NCRETE MANHOLE CONE 0 PRECAST VHOLE RISER SECTION FORCE MAIN IN OVERSIZED )CONTACT PE AND MANHOLE iii lj�pr 171111 In � TOP RIP RAP WITH 4" OF RAILROAD BALLAST BACKFILL AROUND CULVERT WITH RIP RAP 30" DIAMETER CMP (LENGTH ,�AS REQUIRED) TO BE USED ONLY AS TEMPORARY CROSSING IN DITCHES WITH UVE FLOW '. . ,._L� <�..: ill a 3000 PSI COKICRETE WITH _.,,. � I I TE RY CREEK CROSSING �� MANHOLE < .,. OJ T — _I_ — STEPS -fi — nrt d CROSSING OF DITCHES OR STREAMS WITHOUT THE INSTALLATION OF :..' a THE TEMPORARY PIPING CROSSING IS NOT ALLOT C CROSSINGS TO ' I" �Q �� REMAIN IN PLACE UNTIL SEWER LINE IS PLACED INTO SERVICE, THEN J i 3 ? 1 . ° i ; J a a ® THE CONTRACTOR MUST REMOVE THE CROSSING AND PLACE RIP RAP CLASS B CONCRETE : Q U. ,.. PROTECTION IN ALL DISTURBED AREAS OF CHANNEL AND BANKS ,A4 . e • .a a, p F_3'-0"----j TYPICAL DETAIL FOR CONCRETE BLOCKING AT AERIAL SEWER LINE AND CREErI\ CROSSINGS CONCRETE BLOCKING TO BE PART OF PRICE FOR AERIAL OR CREEK CROSSING ITEM A ° : SEWER v -d a PIPE a MANHOLE STEPS e4: SECTIONAL PLAN 4'- 0" a: MINIMUM STANDARD d °' FITTINGS FOR FORCE MAIN CONNECTION, MANHOLE - IF REQUIRED, SHALL BE MADE WITH 45° BENDS OR LESS. T 3000 PSI COKICRETE WITH ° . W 16„ 1— J I.LI T — _I_ — I -fi — nrt #6 BARS @ 12" O.C. E /W. PLACE #6 BA! S @ 45° TO w I( 4. a.I I" �Q �� I. Q. I OPENING- (TY ?ICAL BOTH SIDES) J a a d . Q U. ,A4 . e • .a Li W Co ♦ ' 4 0 .• a �, = L-Lj cn Q-:z p 4'"- .. mss. ' a I ( ( I I PROPOSED DUCTILE IRON 14 I ° { GRAVITY SEWERS - SEE I a I ° PLAN FOR SIZE -- 4'- 0" TYPICAL DETAIL FOR CONCRETE BLOCKING AT AERIAL SEWER LINE AND CREErI\ CROSSINGS CONCRETE BLOCKING TO BE PART OF PRICE FOR AERIAL OR CREEK CROSSING ITEM A ° : SEWER v -d a PIPE a MANHOLE STEPS e4: SECTIONAL PLAN 4'- 0" a: MINIMUM STANDARD d °' FITTINGS FOR FORCE MAIN CONNECTION, MANHOLE - IF REQUIRED, SHALL BE MADE WITH 45° BENDS OR LESS. UNEXCAVATED 4. 3" MIN. . d a. �\ CLASS B CONU RETE s, a XIBLE MANHOLE SLEEVE OR ENTRANCE JOINT BASE FOUNDATION ONSTRUCTED LEVEL UNEXCAVATED WITH EXISTING MATERIAL OR WITH STONE STONE AS REQUIRED BY SPECIFICATIONS NOTE: IF FORCE MAIN CONNECTION IS MADE TO EXISTING MANHOLE, INVERT FOR FORCE MAIN 5-HALL BE CONSTRUCTED ON TOP OF EXISTING INVERT BENCH - .SECTION A- A_ FORCE MAIN CONNECTION BACKFILL MATERIAL COMPACTED IN 6" LIFTS BACKFILL MATERIAL COMPACTED IN 3" LIFTS ISSUE""' FOR CONSTRU CTION APPROVED WARNIN'G TAPE 24 ABOVE PIPE (PVC (ONLY) BACKFILL MATERIAL COMPACTED IN a LIFTS BACKFILL MATERIAL COMPACTED IN 3" LIFTS 2 COATED 'ER TRACING WIRE : ONLY) EARTH NOTE: BELL HOLES NOT SHOWN STANDARD EXCAVATION \ V 12" MAX 6" MIN / 6" UNDISTURBED -� EARTH OVERCUT EXCAVATION NO I E: 1. CONS I RUC Z ION OF I BENCHES SHALL COMPLY WITH ALL 'FEDERAL, STATE AND LOCAL SAFETY AND HEALTH REGULATIONS WHICH HAVE JURISDICTION AT THE PROJECT SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BE FAMILIAR WITH THE APPLICABLE RE3ULATIONS AND FOLLOW THEM ACCORDINGLY. 2. PAYMENT FOR ROCK EXCAVATION AND SELECT BACKFILL IN TRENCH SHALL BE FOR ACTUAL QUANITIES AND SHALL NOT EXCEED THE WIDTH OF TRENCH" SHOWN ON THIS DETAIL. TYPICAL TRENCHING DETAILS SEWER FORCE MAIN NO. I DATE I BY I REVISION DESCRIPTION ma SHEET cn d ° . W 16„ 1— J I.LI " 4. w I( 4. d . Q U. ,A4 . e • .a Li W Co ♦ ' 4 0 .• a �, = L-Lj cn Q-:z p 4'"- .. mss. ' a UNEXCAVATED 4. 3" MIN. . d a. �\ CLASS B CONU RETE s, a XIBLE MANHOLE SLEEVE OR ENTRANCE JOINT BASE FOUNDATION ONSTRUCTED LEVEL UNEXCAVATED WITH EXISTING MATERIAL OR WITH STONE STONE AS REQUIRED BY SPECIFICATIONS NOTE: IF FORCE MAIN CONNECTION IS MADE TO EXISTING MANHOLE, INVERT FOR FORCE MAIN 5-HALL BE CONSTRUCTED ON TOP OF EXISTING INVERT BENCH - .SECTION A- A_ FORCE MAIN CONNECTION BACKFILL MATERIAL COMPACTED IN 6" LIFTS BACKFILL MATERIAL COMPACTED IN 3" LIFTS ISSUE""' FOR CONSTRU CTION APPROVED WARNIN'G TAPE 24 ABOVE PIPE (PVC (ONLY) BACKFILL MATERIAL COMPACTED IN a LIFTS BACKFILL MATERIAL COMPACTED IN 3" LIFTS 2 COATED 'ER TRACING WIRE : ONLY) EARTH NOTE: BELL HOLES NOT SHOWN STANDARD EXCAVATION \ V 12" MAX 6" MIN / 6" UNDISTURBED -� EARTH OVERCUT EXCAVATION NO I E: 1. CONS I RUC Z ION OF I BENCHES SHALL COMPLY WITH ALL 'FEDERAL, STATE AND LOCAL SAFETY AND HEALTH REGULATIONS WHICH HAVE JURISDICTION AT THE PROJECT SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BE FAMILIAR WITH THE APPLICABLE RE3ULATIONS AND FOLLOW THEM ACCORDINGLY. 2. PAYMENT FOR ROCK EXCAVATION AND SELECT BACKFILL IN TRENCH SHALL BE FOR ACTUAL QUANITIES AND SHALL NOT EXCEED THE WIDTH OF TRENCH" SHOWN ON THIS DETAIL. TYPICAL TRENCHING DETAILS SEWER FORCE MAIN NO. I DATE I BY I REVISION DESCRIPTION ma SHEET lw w 40' -0" 12' -0" NOTE: SECURITY FENCE SHALL CONTAIN FIVE (5) STRANDS OF BARBED WIRE EVENLY SPACED BEGINNING 6" ABOVE GRADE UP TO A HEIGHT 42" ABOVE GRADE FENCE/G&TE DETAIL SCALE : NOT TO SCALE NOTES: '2 -3 FEET IN LENGTH ANGLE CUT 30 -45 DEGREES PROPOSED 4" X 4" PRESSURE TREATED WOODEN POST (TYP.) FOR SINGLE SPAN FENCE GATE AND FENCE POSTS NOTE: STAKING MAY BE REQUIRED THROUGH MATTING, ROCK, OR COMPACTED SOILS. ` REQUIRE STARTER HOLE IF THE CASE. LIVE STAKES NORMAL DEPTH 1. LIVE :STAKES SHALL BE EVENLY SPACED 4 FEET APART. 2. LIVE .STAKES SHALL BE DRIVEN UNTIL APPROXIMATELY % OF LIVE STAKE IS WITHIN GROUND. 3. IF STARTER HOLE IS NEEDED, MINIMIZE AIR POCKET AS MUCH AS POSSIBLE. 4. UTILIZE ON SITE TRANSPLANT MATERIALS MADE AVAILABLE BY THE OWNER. ONCE SOUR E OF TRANSPLANT MATERIAL HAS, BEEN HARVESTED, UTILIZE LIVE STAKING. NORTH CAROLINA LAND QUALITY SECTION EROSION CONTROL NOTES GENERAL: ALL EROSION CONTROL MEASURES ARE TO BE PERFORMED IN STRICT ACCORDANCE WITH REQUIREMENTS OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, DIVISION OF LAND RESOURCES. LAND QUALITY SECTION. THE FOLLOWING CONSTRUCTION SEQUENCE SHALL BE COMPLIED WITH FOR ALL WORK. 1. PRIOR TO BEGINNING WORK ON THE PROJECT THE CONTRACTOR SHALL OBTAIN FROM THE OWNER A COPY OF THE "EROSION AND SEDIMENT CONTROL APPROVAL" FROM THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, DIVISION OF LAND QUALITY, OR THE LOCAL AUTHORIZED PROGRAM. THE APPROVAL NOTICE MUST BE AVAILABLE ON -SITE DURING ALL GRADING AND CONSTRUCTION ACTIVITIES. 2. INSTALL ALL EROSION CONTROL MEASURES AS REQUIRED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, DIVISION OF LAND RESOURCES, LAND QUALITY SECTION. NOTE: ALL UTILITY INSTALLATION WITHIN 25' OF A RIVER OR STREAM BANJO SHALL BE INSTALLED PER STREAM BANK PROTECTION DETAIL. SEEDING AND MULCHING SHALL BE COMPLETED DAILY IN AREAS NOTED AS STREAM PROTECTION AREAS. SILT FENCE IN THESE AREAS SHALL NOT BE INSTALLED CLOSER THAN 6 FROM CREEK BANK UNLESS FIELD CONDITIONS PREVENT SUFFICIENT CLEARANCE. ALL SILT FENCES SHALL BE INSPECTED AND CLEANED AS NEEDED AFTER EACH RAIN. 3. OBTAIN CERTIFICATE OF COMPLIANCE THROUGH ON -SITE INSPECTION BY A REPRESENTATIVE OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, DIVISION OF LAND RESOURCES, LAND QUALITY SECTION. 4. PROCEED WITH GRADING, CLEARING AND GRUBBING. NOTE: NO OFF SITE DISPOSAL OF MATERIAL IS ALLOWED UNLESS THE DISPOSAL SITE HAS AN APPROVED EROSION CONTROL PLAN. 5. ALL TEMPORARY STREAM AND CREEK CROSSINGS FOR EQUIPMENT DURING CONSTRUCTION SHALL BE MADE USING TEMPORARY BRIDGES. NO STREAM BANK OR STREAM BED DISTURBANCE SHALL BE ALLOWED FOR EQUIPMENT CROSSINGS. 6. SEED AND MULCH DENUDED AREA WITHIN 15 DAYS AFTER FINISHED GRADE IS ESTABLISHED. SEED AND SOIL AMENDMENTS SHALL BE PLACED ON A PREPARED SEEDBED AT THE FOLLOWING RATES PER ACRE. AMENDMENTS SHALL BE PLACED ON A PREPARED SEEDBED AT THE FOLLOWING RATES PER ACRE. LIME: ( COARSE TEXTURED) 1 -1.5 TONS /ACRE ( FINE TEXTURED) 2 - 3 TONS /ACRE FERTILIZER (10- 10 -10) 800 -1200 LB /ACRE STRAW MULCH ACHIEVE 75 % GROUND COVER TEMPORARY SEEDING WILL BE AVOIDED DURING THE MONTHS OF DECEMBER OR JANUARY. IF NECESSARY TO SEED AT THESE TIMES, CONTRACTOR SHALL USE RYE GRAIN AND A SECURELY TACKED HYDRO MULCH. CONTRACTOR SHALL SELECT THE APPROPRIATE TEMPORARY SEED MIX FROM THE FOLLOWING TABLE: MOUNTAINS ABOVE 2500' BELOW 2500' PIEDMONT COASTAL PLAIN 1 KOREAN LESPEDEZA WITH ... ........... 50 LS/ACRE RYE GRAIN .............. ............................120 LB/ACRE 2 KOBE LESPEDEZA WITH ....................50 LBJACRE RYE GRAIN .............. ............................120 LB/ACRE 3 GERMAN MILLET OR ..........................40 LB/ACRE SUDAN GRASS ...... .............................50 LB/ACRE 4 GERMAN MILLET ... .............................40 LB/ACRE 5 RYE GRAIN .. ... ..120 LB/ACRE FOR SEEDING BETWEEN MAY 1 AND AUGUST 31 ADD ( ONE) TO THE ABOVE: GERMAN MILLET 10 LBS SUDAN GRASS 15 LBS FOR SEEDING BETWEEN SEPTEMBER 1 AND APRIL 30 ADD TO THE ABOVE RYE GRAIN 40 LBS FOR ALL SLOPES 2:1 OR STEEPER ADD TO THE ABOVE: SERICEA LESPEDEZA 40 LES 'AFTER AUGUST 15TH USE UNSCARIFIED SEED FOR SERICEA LESPEDEZA. - A PREMIUM HYDROMULCH MAY BE USED, INSTEAD OF STRAW MULCH, AT A RATE OF 3000 LBS PER ACRE INCLUDING A JUMP START FORMULA ADDED AT A RATE PER MANUFACTURES RECOMMENDATIONS. - IF HYDRO SEEDING, WOOD CELLULOSE MAY BE USED IN ADDITION TO STRAW MULCH AT THE RATE OF 1.000 LBS PER ACRE. - ALL SEEDING SHALL BE MAINTAINED, WATERED ETC., UNTIL A PERMANENT VEGETATIVE GROUND COVER IS ESTABLISHED OVER ALL DISTURBED AREAS. - ALL SLOPES 2:1 OR STEEPER SHALL BE COVERED BY EROSION CONTROL MATTING. NATIVE PLANT SEEDING MIX FOR STREAM STABILIZATION SEEDING FOR STREAM STABILIZATION SHALL BE A MIXTURE OF NATIVE GRASSES, PLANTS AND TREES. NATIVE PLANT MIX VARIATIONS SHALL BE APPROVED BY ENGINEER AND INCLUDE THE FOLLOWING: GRASSES BIG BLUESTEM (Andorpogon geradiD 4 LBS /ACRE LITTLE BLUESTEM (Schizachyrium scoparium) 4 LBS /ACRE INDIANGRASS (Sorghastrum nutans) 4 LBS /ACRE SWITCHGRASS (Panicum virgatum) 4 LBWS /ACRE PURPLE LOVE GRASS ( Eragrostis spectabilis) 3 LBS /ACRE DEER TOUNGE ( Panicum clandestinum) 3 LBS /ACRE PURPLE TOP (Tridens flavus) 3 LBS /ACRE FOR SEEDING BETWEEN MAY 1 AND AUGUST 31 ADD TO THE ABOVE MILLET 25 LBS /ACRE FOR SEEDING BETWEEN SEPTEMBER 1 AND APRIL 30 ADD TO THE ABOVE RYE ( GRAIN) 25 LBS /ACRE TREES SILKY DOGWOOD (CORNUS AMONUM) , SILKY WILLOW (SALIX SERICEA) , HAZEL ALDER (ALMUS SERRULATA) ELDERBERRY (SAMBUEUS CANADENSIS) NOTE: NO FERTILIZER SHALL BE USED WITHIN 10' OF TOP OF STREAM BANK. 7. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 8. REMOVE SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREAS. 9. REQUEST FINAL APPROVAL BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, DIVISION OF LAND RESOURCES, LAND QUALITY SECTION. REVISION DESCRIPTION Chi ^ i Cam. 2L• • ce r- •. :r 00 ® N 3 J( 1 I I ® Z Z (A n: q M �aa m ■moo La S 1 KOREAN LESPEDEZA WITH ... ........... 50 LS/ACRE RYE GRAIN .............. ............................120 LB/ACRE 2 KOBE LESPEDEZA WITH ....................50 LBJACRE RYE GRAIN .............. ............................120 LB/ACRE 3 GERMAN MILLET OR ..........................40 LB/ACRE SUDAN GRASS ...... .............................50 LB/ACRE 4 GERMAN MILLET ... .............................40 LB/ACRE 5 RYE GRAIN .. ... ..120 LB/ACRE FOR SEEDING BETWEEN MAY 1 AND AUGUST 31 ADD ( ONE) TO THE ABOVE: GERMAN MILLET 10 LBS SUDAN GRASS 15 LBS FOR SEEDING BETWEEN SEPTEMBER 1 AND APRIL 30 ADD TO THE ABOVE RYE GRAIN 40 LBS FOR ALL SLOPES 2:1 OR STEEPER ADD TO THE ABOVE: SERICEA LESPEDEZA 40 LES 'AFTER AUGUST 15TH USE UNSCARIFIED SEED FOR SERICEA LESPEDEZA. - A PREMIUM HYDROMULCH MAY BE USED, INSTEAD OF STRAW MULCH, AT A RATE OF 3000 LBS PER ACRE INCLUDING A JUMP START FORMULA ADDED AT A RATE PER MANUFACTURES RECOMMENDATIONS. - IF HYDRO SEEDING, WOOD CELLULOSE MAY BE USED IN ADDITION TO STRAW MULCH AT THE RATE OF 1.000 LBS PER ACRE. - ALL SEEDING SHALL BE MAINTAINED, WATERED ETC., UNTIL A PERMANENT VEGETATIVE GROUND COVER IS ESTABLISHED OVER ALL DISTURBED AREAS. - ALL SLOPES 2:1 OR STEEPER SHALL BE COVERED BY EROSION CONTROL MATTING. NATIVE PLANT SEEDING MIX FOR STREAM STABILIZATION SEEDING FOR STREAM STABILIZATION SHALL BE A MIXTURE OF NATIVE GRASSES, PLANTS AND TREES. NATIVE PLANT MIX VARIATIONS SHALL BE APPROVED BY ENGINEER AND INCLUDE THE FOLLOWING: GRASSES BIG BLUESTEM (Andorpogon geradiD 4 LBS /ACRE LITTLE BLUESTEM (Schizachyrium scoparium) 4 LBS /ACRE INDIANGRASS (Sorghastrum nutans) 4 LBS /ACRE SWITCHGRASS (Panicum virgatum) 4 LBWS /ACRE PURPLE LOVE GRASS ( Eragrostis spectabilis) 3 LBS /ACRE DEER TOUNGE ( Panicum clandestinum) 3 LBS /ACRE PURPLE TOP (Tridens flavus) 3 LBS /ACRE FOR SEEDING BETWEEN MAY 1 AND AUGUST 31 ADD TO THE ABOVE MILLET 25 LBS /ACRE FOR SEEDING BETWEEN SEPTEMBER 1 AND APRIL 30 ADD TO THE ABOVE RYE ( GRAIN) 25 LBS /ACRE TREES SILKY DOGWOOD (CORNUS AMONUM) , SILKY WILLOW (SALIX SERICEA) , HAZEL ALDER (ALMUS SERRULATA) ELDERBERRY (SAMBUEUS CANADENSIS) NOTE: NO FERTILIZER SHALL BE USED WITHIN 10' OF TOP OF STREAM BANK. 7. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 8. REMOVE SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREAS. 9. REQUEST FINAL APPROVAL BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, DIVISION OF LAND RESOURCES, LAND QUALITY SECTION. REVISION DESCRIPTION Chi ^ i Cam. 2L• • ce r- •. :r 00 ® N 3 J( 1 I I ® Z Z (A n: q M m La S LLJ S w Q O o w Co � � m V) Z ml--Q ti.! Z wov)z Z t= J )OW O V O V p ��l I�