Loading...
HomeMy WebLinkAboutNCS000548_Email RE Outfall SW026 Status_20210224Gamble, Aana C From: Wylie, Robert R <Robert.Wylie@duke-energy.com> Sent: Wednesday, February 24, 2021 8:58 AM To: Gamble, Aana C Subject: RE: [External] Draft Permit for Your Review CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Thanks Aana. From: Gamble, Aana C <Aana.Gamble@ncdenr.gov> Sent: Wednesday, February 24, 20218:51 AM To: Wylie, Robert R <Robert.Wylie@duke-energy.com> Subject: RE: [External] Draft Permit for Your Review Good morning Robert, As long as there is no industrial activity in the area (other than construction activities covered under NCG01), we concur with your statements below. Once construction is complete, industrial activity begins, and SW026 begins to discharge, then the ISW permit requirements for SW026 will be in effect. Thanks! Aana Gamble Environmental Specialist Il, Dam Safety Division of Energy, Mineral and Land Resources North Carolina Department of Environmental Quality Phone: (919) 707-9151 Email: aana.gamble@ncdenr.gov Physical Address: 512 North Salisbury Street Mailing Address: 1612 Mail Service Center Raleigh, NC 27699-1612 er-o Q D,E uspartwoom rJaRTIla�1.gQ� d Eryrrw'w"jai Guallby Email correspondence to and from this address is subjected to the North Carolina Public Records Law and may be disclosed to third parties. From: Wylie, Robert R [mailto:Robert.Wylie@duke-energy.com] Sent: Tuesday, February 23, 2021 11:19 AM To: Gamble, Aana C <Aana.Gamble@ncdenr.gov> Subject: RE: [External] Draft Permit for Your Review CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Aana, MAR-152 (SW026) is still under construction. Once the construction is over and stabilized (probably 3rd quarter 2021) the outfall will open up and start to discharge. Right now during construction the discharge is from a sediment basin. The sediment basin is solely for construction activities. My interpretation is that even if the new ISW permit goes into effect on 5/1/21, since MAR-152 is still under a storm water construction permit, that quarterly monitoring per the ISW permit for SW026 does not begin until MAR-152's storm water construction permit is terminated. Once the storm water construction permit is terminated the entire MAR-152 footprint will then start to discharge out SW026. Up until that time only the portion of the discharge line to the skimmer basin is being discharged Please confirm that you concur with this. Thanks, Robert Wylie Duke Energy Corporation Permitting and Compliance, Carolinas 704 562-8258 (cell) Robert.Wylie@duke-energy.com From: Gamble, Aana C <Aana.Gamble@ncdenr.gov> Sent: Monday, February 22, 2021 10:46 AM To: Wylie, Robert R <Robert.Wylie@duke-energy.com> Subject: RE: [External] Draft Permit for Your Review Hi Robert, Just wanted to let you know that the draft permit for NCS000548, Marshall Steam Station, went to public notice starting today, February 22. The public comment period ends March 23, 2021. Barring extensive public comments or a public hearing, we should still be on track for an effective date of May 1, 2021. Please let me know if you have any questions. Thank you, and have a great week! Aana Gamble Environmental Specialist II, Dam Safety Division of Energy, Mineral and Land Resources North Carolina Department of Environmental Quality Phone: (919) 707-9151 Email: aana.gamble@ncdenr.gov Physical Address: 512 North Salisbury Street Mailing Address: 1612 Mail Service Center Raleigh, NC 27699-1612