From: Wylie, Robert R <Robert.Wylie@duke-energy.com>
Sent: Wednesday, February 24, 2021 8:58 AM
To: Gamble, Aana C
Subject: RE: [External] Draft Permit for Your Review
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Thanks Aana.
From: Gamble, Aana C <Aana.Gamble@ncdenr.gov>
Sent: Wednesday, February 24, 20218:51 AM
To: Wylie, Robert R <Robert.Wylie@duke-energy.com>
Subject: RE: [External] Draft Permit for Your Review
Good morning Robert,
As long as there is no industrial activity in the area (other than construction activities covered under NCG01), we concur
with your statements below. Once construction is complete, industrial activity begins, and SW026 begins to discharge,
then the ISW permit requirements for SW026 will be in effect.
Thanks!
Aana Gamble
Environmental Specialist Il, Dam Safety
Division of Energy, Mineral and Land Resources
North Carolina Department of Environmental Quality
Phone: (919) 707-9151
Email: aana.gamble@ncdenr.gov
Physical Address: 512 North Salisbury Street
Mailing Address: 1612 Mail Service Center
Raleigh, NC 27699-1612
er-o Q D,E
uspartwoom rJaRTIla�1.gQ�
d Eryrrw'w"jai Guallby
Email correspondence to and from this address is subjected to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Wylie, Robert R [mailto:Robert.Wylie@duke-energy.com]
Sent: Tuesday, February 23, 2021 11:19 AM
To: Gamble, Aana C <Aana.Gamble@ncdenr.gov>
Subject: RE: [External] Draft Permit for Your Review
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Aana,
MAR-152 (SW026) is still under construction. Once the construction is over and stabilized (probably 3rd quarter 2021)
the outfall will open up and start to discharge. Right now during construction the discharge is from a sediment
basin. The sediment basin is solely for construction activities.
My interpretation is that even if the new ISW permit goes into effect on 5/1/21, since MAR-152 is still under a storm
water construction permit, that quarterly monitoring per the ISW permit for SW026 does not begin until MAR-152's
storm water construction permit is terminated. Once the storm water construction permit is terminated the entire
MAR-152 footprint will then start to discharge out SW026. Up until that time only the portion of the discharge line to
the skimmer basin is being discharged
Please confirm that you concur with this.
Thanks,
Robert Wylie
Duke Energy Corporation
Permitting and Compliance, Carolinas
704 562-8258 (cell)
Robert.Wylie@duke-energy.com
From: Gamble, Aana C <Aana.Gamble@ncdenr.gov>
Sent: Monday, February 22, 2021 10:46 AM
To: Wylie, Robert R <Robert.Wylie@duke-energy.com>
Subject: RE: [External] Draft Permit for Your Review
Hi Robert,
Just wanted to let you know that the draft permit for NCS000548, Marshall Steam Station, went to public notice starting
today, February 22. The public comment period ends March 23, 2021. Barring extensive public comments or a public
hearing, we should still be on track for an effective date of May 1, 2021.
Please let me know if you have any questions.
Thank you, and have a great week!
Aana Gamble
Environmental Specialist II, Dam Safety
Division of Energy, Mineral and Land Resources
North Carolina Department of Environmental Quality