Loading...
HomeMy WebLinkAbout20210160 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210222Strickland, Bev From: laserfiche@ncdenr.gov Sent: Monday, February 22, 2021 9:44 AM To: Sullivan, William Cc: Goss, Stephanie Subject: Pre -Filing Time Clock has been reached for Aspens - Holly Springs Site - 20210160 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Aspens - Holly Springs Site that you submitted on 1/22/2021. The ID number for that project is 20210160, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20210160 Version* 1 Regional Office* Raleigh Regional Office - (919) 791-4200 Reviewer List* Stephanie Goss Pre -Filing Meeting Request submitted 1/22/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: William Sullivan William.Sullivan@kimley-horn.com Aspens - Holly Springs Site Aspens Senior Living, LLC Wake Street Address 505 Pecan Street Address Line 2 Suite 202 aty Fort Worth Fbstal / Zip Code 76102 Is this a transportation project? * r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express r- Individual Permit F- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No State / Province / Region TX Country USA Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below. * The project proposes to construct a senior living facility within the approximately 8-acre site. The site is composed of 3 individual parcels situated west of S Main Street, south of NC-55, and north of Ralph Stephens Road in the Town of Holly Springs, Wake County, NC. The site has an existing No Permit Required Concurrence Letter from the US Army Corps of Engineers to fill the man-made, non - jurisdictional pond in the center of the site. In addition to filling this non -jurisdictional feature, the project proposes to impact a small portion of a headwater wetland located along the northern boundary of the site. It is assumed that the project will qualify for authorization under Nationwide Permit #29. Previous buffer documentation from the development downstream of the site indicates that there are no Neuse River Basin buffers present within the property parcels; however, a buffer determination will be requested prior to the permit application submittal. Please give a couple of dates you are available for a meeting. 2/17/2021 2/22/2021 Please attach the documentation you would like to have the meeting about. Figure1_Vicinity_Aspens.pdf 643.88KB Fig ure2_USGS_Aspens.pdf 677.2KB Figure3_JDFeatures_Aspens.pdf 5.64MB Fig u re4_NRCS_Aspens. pdf 968.88KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 1/22/2021