HomeMy WebLinkAbout20210160 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210222Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Monday, February 22, 2021 9:44 AM
To: Sullivan, William
Cc: Goss, Stephanie
Subject: Pre -Filing Time Clock has been reached for Aspens - Holly Springs Site - 20210160
Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Aspens - Holly
Springs Site that you submitted on 1/22/2021. The ID number for that project is 20210160, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
ID#* 20210160 Version* 1
Regional Office* Raleigh Regional Office - (919) 791-4200
Reviewer List* Stephanie Goss
Pre -Filing Meeting Request submitted 1/22/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
William Sullivan
William.Sullivan@kimley-horn.com
Aspens - Holly Springs Site
Aspens Senior Living, LLC
Wake
Street Address
505 Pecan Street
Address Line 2
Suite 202
aty
Fort Worth
Fbstal / Zip Code
76102
Is this a transportation project? * r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F- 401 Water Quality Certification -
Regular Express
r- Individual Permit F- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
State / Province / Region
TX
Country
USA
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below. *
The project proposes to construct a senior living facility within the
approximately 8-acre site. The site is composed of 3 individual
parcels situated west of S Main Street, south of NC-55, and north of
Ralph Stephens Road in the Town of Holly Springs, Wake County,
NC.
The site has an existing No Permit Required Concurrence Letter from
the US Army Corps of Engineers to fill the man-made, non -
jurisdictional pond in the center of the site. In addition to filling this
non -jurisdictional feature, the project proposes to impact a small
portion of a headwater wetland located along the northern boundary
of the site. It is assumed that the project will qualify for authorization
under Nationwide Permit #29. Previous buffer documentation from the
development downstream of the site indicates that there are no
Neuse River Basin buffers present within the property parcels;
however, a buffer determination will be requested prior to the permit
application submittal.
Please give a couple of dates you are available for a meeting.
2/17/2021
2/22/2021
Please attach the documentation you would like to have the meeting about.
Figure1_Vicinity_Aspens.pdf 643.88KB
Fig ure2_USGS_Aspens.pdf 677.2KB
Figure3_JDFeatures_Aspens.pdf 5.64MB
Fig u re4_NRCS_Aspens. pdf 968.88KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 1/22/2021