HomeMy WebLinkAbout20120593 Ver 1_Approval Letter_20120721A k MWA NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild P E Governor Director June 21 2012 Nash County NCDWQ Project No 20120593 SR 1727 State Project No 4C 4129 APPROVAL of 401 WATER QUALITY CERTIFICATION and TAR PAMLICO BUFFER AUTHORIZATION, with ADDITIONAL CONDITIONS Mr John W Rouse P E NCDOT Division 4 PO Box 3165 Wilson NC 27895 3165 Dear Mr Rouse Division Engineer Dee Freeman Secretary You have our approval in accordance with the conditions listed below for the following impacts for the purpose of upgrades and improvements to SR 1727 in Nash County Stream Imp acts in the Tar Pamlico River Bann Site Permanent Fill in Riprap Stabilization Abandonment of Temporary Total Stream Stream minus Intermittent to Intermittent Intermittent Dewatering to Impact Impacts Mitigation Stream (linear ft) Stream (linear ft) Stream (linear ft) Intermittent Stream (linear ft) Requiring (sq ft) in Zone 1 wetlands) Required (linear ft) (sq ft) Mitigation (not Required (using (sq ft) (sq ft) (linear ft 1 28 37 115 23 203 0 2 155 14 0 32 201 155 Total 183 51 115 55 404 155 Total Stream Impact for Protect 404 linear feet Tar Pamlico Riparian Buffer Impacts Site Zone 1 minus = Zone I Zone 1 Buffer Zone 2 minus = Zone 2 Zone 2 Buffer Impact Wetlands Buffers (not Mitigation I Impact Wetlands Buffers Mitigation (sq ft) in Zone 1 wetlands) Required CAI. (sq ft) in Zone 2 (not Required (using (sq ft) (sq ft) (using 3 1 ratio) (sq ft) wetlands) 15 1 ratio) N s ft) 1 7000 0 7000 N/A 1900 0 1900 N/A 2 5400 0 5400 N/A 2300 0 2300 N/A Totals 12400 0 12400 0 4200 0 4200 0 * n/a = Total for Site is less than 1/3 acre and 150 linear feet of impact no mitigation required Total Buffer Impact for Protect 16,600 square feet Transportation and Permitting Unit 1650 Mail Service Center Raleigh North Carolina 27699 1617 Location 512 N Salisbury St Raleigh North Carolina 27604 Phone 919.807 63001 FAX 919. 807 6492 Internet www rimaterguality ora An Equal Opportunity 1 Affirmative Action Employer NorthCarohna Naturally The project shall be constructed in accordance with your application dated received June 18 2012 After reviewing your application we have decided that these impacts are covered by General Water Quality Certification Numbers 3885 and 3886 This certification corresponds to the Nationwide Permits 13 and 14 issued by the Corps of Engineers This approval is also valid for the Tar Pamlico Riparian Buffer Rules (15A NCAC 2B 0259) In addition you should acquire any other federal state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control Non Discharge and Water Supply Watershed regulations This approval will expire with the accompanying 404 permit This approval is valid solely for the purpose and design described in your application (unless modified below) Should your project change you must notify the NCDWQ and submit a new application If the property is sold the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all the conditions If total wetland fills for this project (now or in the future) exceed one acre or of total impacts to streams (now or in the future) exceed 150 linear feet compensatory mitigation may be required as described in 15A NCAC 2H 0506 (h) (6) and (7) Additional buffer impacts may require compensatory mitigation as described in 15A NCAC 2B 0260(9) For this approval to remain valid you must adhere to the conditions listed in the attached certification(s) and any additional conditions listed below Conditions of Certification 1 Compensatory mitigation for 155 linear feet of impact to streams is required We understand that you have chosen to perform compensatory mitigation for impacts to streams through the North Carolina Ecosystem Enhancement Program (EEP) and that the EEP has agreed to implement the mitigation for the project EEP has indicated in a letter dated June 7 2012 that they will assume responsibility for satisfying the federal Clean Water Act compensatory mitigation requirements for the above referenced project in accordance with the EEP Mitigation Banking Instrument signed July 28 2010 2 Unless otherwise approved in this certification placement of culverts and other structures in open waters and streams shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches to allow low flow passage of water and aquatic life Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis equilibrium of wetlands or streambeds or banks adjacent to or upstream and down stream of the above structures The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by NCDWQ If this condition is unable to be met due to bedrock or other limiting features encountered during construction please contact NCDWQ for guidance on how to proceed and to determine whether or not a permit modification will be required 3 Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that precludes aquatic life passage Bioengineering boulders or structures should be properly designed sized and installed 4 For all streams being impacted due to site dewatering activities the site shall be graded to its preconstruction contours and revegetated with appropriate native species 5 Stream channels shall be excavated no deeper than the natural bed material of the stream to the maximum extent practicable Efforts must be made to minimize impacts to the stream banks as well as to vegetation responsible for maintaining the stream bank stability Any applicable riparian buffer impact for access to stream channel shall be temporary and be revegetated with native riparian species 6 In accordance with commitments made in your application DOT shall implement reforestation measures inside impacted buffer zones 7 Pursuant to 15A NCAC 2B 0259(6) sediment and erosion control devices shall not be placed in Zone 1 of any Tar Pamlico Buffer without prior approval by NCDWQ At this time NCDWQ has approved no sediment and erosion control devices in Zone 1 outside of the approved project impacts anywhere on this project Moreover sediment and erosion control devices shall be allowed in Zone 2 of the buffers provided that Zone 1 is not compromised and that discharge is released as diffuse flow 8 All stormwater runoff at the preformed scour hole at Site 2 shall be directed as sheetflow through vegetated stream buffers at nonerosive velocities 9 All riparian buffers impacted by the placement of temporary fill or clearing activities shall be restored to the preconstruction contours and revegetated Maintained buffers shall be permanently revegetated with non woody species by the end of the growing season following completion of construction For the purpose of this condition maintained buffer areas are defined as areas within the transportation corridor that will be subject to regular NCDOT maintenance activities including mowing The area with non maintained buffers shall be permanently revegetated with native woody species before the next growing season following completion of construction 10 If concrete is used during construction a dry work area shall be maintained to prevent direct contact between curing concrete and stream water Water that madvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills 11 During the construction of the project no staging of equipment of any kind is permitted in waters of the U S or protected riparian buffers 12 The dimension pattern and profile of the stream above and below the crossing shall not be modified Disturbed floodplains and streams shall be restored to natural geomorphic conditions 13 The use of rip rap above the Normal High Water Mark shall be minimized Any rip rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage 14 The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval 15 All work in or adjacent to stream waters shall be conducted in a dry work area Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags rock berms cofferdams and other diversion structures shall be used to prevent excavation in flowing water 16 Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream 17 All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels lubricants hydraulic fluids or other toxic materials 18 No rock sand or other materials shall be dredged from the stream channel except where authorized by this certification 19 Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited 20 The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law If NCDWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated or that further conditions are necessary to assure compliance NCDWQ may reevaluate and modify this certification 21 A copy of this Water Quality Certification shall be maintained on the construction site at all times In addition the Water Quality Certification and all subsequent modifications if any shall be maintained with the Division Engineer and the on site project manager 22 The outside buffer wetland or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification 23 The issuance of this certification does not exempt the Permittee from complying with any and all statutes rules regulations or ordinances that may be imposed by other government agencies (i a local state and federal) having jurisdiction including but not limited to applicable buffer rules stormwater management rules soil erosion and sedimentation control requirements etc 24 The Permittee shall report any violations of this certification to the Division of Water Quality within 24 hours of discovery 25 Upon completion of the project (including any impacts at associated borrow or waste sites) the NCDOT Division Engineer shall complete and return the enclosed Certification of Completion Form to notify NCDWQ when all work included in the 401 Certification has been completed 26 Native riparian vegetation (i a trees and shrubs native to your geographic region) must be reestablished in the riparian areas within the construction limits of the project by the end of the growing season following completion of construction 27 There shall be no excavation from or waste disposal into ,jurisdictional wetlands or waters associated with this permit without appropriate modification Should waste or borrow sites or access roads to waste or borrow sites be located in wetlands or streams compensatory mitigation will be required since that is a direct impact from road construction activities 28 Erosion and sediment control practices must be in full compliance with all specifications governing the proper design installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards a The erosion and sediment control measures for the project must be designed installed operated and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual b The design installation operation and maintenance of the sediment and erosion control measures must be such that they equal or exceed the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual The devices shall be maintained on all construction sites borrow sites and waste pile (spoil) projects including contractor owned or leased borrow pits associated with the project c For borrow pit sites the erosion and sediment control measures must be designed installed operated and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual d The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act 29 Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this Certification If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing You may obtain the petition form from the office of Administrative hearings You must file the petition with the office of Administrative Hearings within sixty (60) days of receipt of this notice A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8 OOam and 5 OOpm except for official state holidays The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings The petition may be faxed provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission The mailing address for the Office of Administrative Hearings is Office of Administrative Hearings 6714 Mail Service Center Raleigh NC 27699 6714 Telephone (919) 431 3000 Facsimile (919) 431 3100 A copy of the petition must also be served on DENR as follows Mr William Cary General Counsel Department of Environment and Natural Resources 1601 Mail Service Center This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act If you have any questions please contact Rob Ridmgs at 919 807 6403 Sincerely A 44-� Charles Wakild u Director Cc Chad Coggms Division 4 Environmental Officer Tom Steffens US Army Corps of Engineers Washington Field Office Beth Harmon Ecosystem Enhancement Program File Copy