HomeMy WebLinkAbout20210392 Ver 1_Pre-Filing Acknowledgement Email_20210219Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Friday, February 19, 2021 9:44 AM
To: Hining, Kevin J
Cc: Wanucha, Dave
Subject: Pre -Filing Meeting Request Acknowledgement - Justus Road Improvement Project -
SR1137 - 20210392 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form
for Justus Road Improvement Project - SR1137 that you submitted on (date). The ID number for that
project is 20210392, Version 1.
Reviewer Contact Information:
Reviewer: David Wanucha
Reviewer Email: dave.wanucha@ncdenr.gov
Reviewing Office: Winston-Salem Regional Office - (336) 776-9800
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email
address, as responses are not monitored.
1
ID#* 20210392
Version* 1
Regional Office* Winston-Salem Regional Office - (336) 776-9800
Reviewer List* Dave Wanucha
Pre -Filing Meeting Request submitted 2/18/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
NCDOT Division 11 - Kevin Hining
kjhining@ncdot.gov
Justus Road Improvement Project - SR1137
NCDOT
Watauga
Street Address
801 Statesville Rd
Address Line 2
aty
North Wilkesboro
Rbstal / Zip Code
28659
Is this a transportation project?* r Yes r No
State / Frovince / Region
NC
Country
United States
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Dave Wanucha
Please give a brief project description below.
Road widening and paving project, 1.3 miles in length. Will involve the
replacement and extension of pipes on jurisdictional streams.
Dave - no meeting needed on my end at this time, but more than
happy to meet with you if needed. Might be a couple months before I
have all the necessary information and the PCN completed.
Please give a couple of dates you are available for a meeting.
3/3/2021
3/4/2021
Please attach the documentation you would like to have the meeting about.
SR1137_ErosionPlans_021721.pdf 4.62MB
SR1137_JustusRd_EC Submittal to DEO.pdf 31.96KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 2/18/2021