HomeMy WebLinkAbout20120606 Ver 1_401 Application_20120612�pF WA %c9O
o
`2 XG r
2 ®120606
Office Use Only
Corps action ID no
DWQ project no
Form Version 14 January 2009
►r' M
Page 1 of 10
PCN Form - Version 1 4 January 2009
Pre-Construction Notification (PCN) Form
A
Applicant Information
1
Processing
la
Type(s) of approval sought from the Corps
Section 404 Permit ❑ Section 10 Permit
lb Specify Nationwide Permit (NWP) number 3 or General Permit (GP) number
1c
Has the NWP or GP number been verified by the Corps?
P,Yes
❑ No
1 d
Type(s) of approval sought from the DWQ (check all that apply)
401 Water Quality Certification - Regular ❑ Non 404 Jurisdictional General Permit
❑ 401 Water Quality Certification - Express [J Riparian Buffer Authorization
1 e
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ
401 Certification
❑ Yes 0 No
For the record only for Corps Permit
❑ Yes EJ No
1f
Is payment into a mitigation bank or in lieu fee program proposed for
mitigation of impacts? If so attach the acceptance letter from mitigation bank
or in lieu fee program
❑ Yes
No
1 g
Is the project located in any of NC s twenty coastal counties If yes answer 1 h
below
❑ Yes
No
1h Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes
KNo
2
Project Information
2a
Name of project
1
e_ rard
2b
County
r_smi
2c
Nearest municipality / town
PDk W r o
2d
Subdivision name
2e
NCDOT only T I P or state project no
3
Owner Information
- z
3a
Name(s) on Recorded Deed
.�j Q� _ j
U i
3b
Deed Book and Page No
- 65 gs
3c
Responsible Party (for LLC if
applicable)
pi Ic
ar, c 4
3d
Street address
G1 06 Ch.
t L4
r� ts�E
3e
City state zip
I & f,MY
3f
Telephone no
3g
Fax no
3h
Email address
D31-04154 0�
►r' M
Page 1 of 10
PCN Form - Version 1 4 January 2009
4 Applicant Information (if different from owner)
4a Applicant is
❑ Agent ❑ Other specify
4b Name
4c Business name
(if applicable)
4d Street address
4e City state zip
4f Telephone no
4g-Fax no
4h Email address
5 Agent/Consultant Information (if applicable)
5a Name
5b Business name
(if applicable)
5c Street address
5d City state zip
5e Telephone no
5f Fax no
5g Email address
Page 2 of 10
B
Project Information and Prior Project History
1
Property Identification
1a
Property identification no (tax PIN or parcel ID)
I Cfq75 - 66-'025- 6.�? n OGC>
1b
Site coordinates (in decimal degrees) I
Latitude Longitude
1c
Property size
133 acres
2
Surface Waters
2a
Name of nearest body of water to proposed protect
2b
Water Quality Classification of nearest receiving water
2c
River basin
,� n
3
Project Description
3a
Describe the existing co itions n the s e and th eneral lad use in the vicinity of the project at the time of this
application o - 1'W �CI'1 d ry �ILY�(� Gti1OY�1' cot VA� (�'1
a�ca.
3b
List the total estimated acreage of all existing wetlands on the property
3c
List the total estimated linear feet of all existing streams (intermittent and perennial) on the property
3d
Explain the purpose of the proposed project
F—OXM I rrc , LTYI M4
3e
Describe the o rail projectt in detail including the type of equipment to be used
1 tL �ar TInR +r f��� �t"�rrn 7racio,� �kua�oT,u' COh� a�Tar
4
Limisdictional DeteAninations
4a
Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
�j Yes ❑ No ❑ Unknown
Comments
4b
If the Corps made the jurisdictional determination what type
of determination was made
® Preliminary-
❑ Final
4c
If yes who delineated the jurisdictional areas?
Name (if known) Cr t, GIs m e etf
Agency /Consultant Company
Other Or C0115
4d
If yes list the dates of the Corps jurisdictional determinations or State determinate s and Attach documentation
/o' 01 end
5
Project History
5a
Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past?
Yes No ❑Unknown
5b
If yes explain in detail according to help file instructions
6
Future Project Plans
6a
Is this a phased project?
❑ Yes %No
6b
If yes explain
Page 3 of 10
PCN Form - Version 14 January 2009
C Proposed Impacts Inventory
1 Impacts Summary
la Which sections were completed below for your project (check all that apply)
❑ Wetlands Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction
2 Wetland Impacts
If there are wetland impacts proposed on the site then complete this question for each wetland area impacted
2a
Wetland impact
number
Permanent (P) or
Temporary
2b
Type of impact
2c
Type of wetland
2d
Forested
2e
Type of jurisdiction
Corps (404 10) or
DWQ (401 other)
2f
Area of
impact
(acres)
W1
Choose one
Choose one
Yes /No
W2
Choose one
Choose one A
Yes/No
W3
Choose one
Choose one
Yes /No
W4
Choose one
Choose one
Yes /No
W5
Choose one
Choose one
Yes/No
W6
Choose one
Choose one
Yes /No
2g Total Wetland Impacts
2h Comments
3 Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this
question for all stream sites impacted
3a
Stream impact
number
Permanent (P) or
Temporary (T)
3b
Type of impact
3c
Stream name
3d
Perennial (PER) or
intermittent (INT)?
3e
Type of
jurisdiction
3f
Average
stream
width
(feet)
3g
Impact
length
(linear
feet)
S1
Choose one-f/OL'djfi
c-ewfoll
2.
S2
Choose one oQd
2_
N T
C 4
I Z
S3
Choose one LL-
'�
C612K46f
a
S4
Choose one
S5
Choose one
S6
Choose one
3h Total stream and tributary impacts
31 Comments
Page 4 of 10
PCN Form — Version 14 January 2009
4 Open Water Impacts
If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of
the U S then indiv ually list all open water impacts below
4a
Open water
impact number
Permanent (P) or
Temporary
4b
Name of waterbody
(if applicable)
4c
Type of impact
4d
Waterbody
type
4e
Area of impact (acres)
01
Choose one
Choose
02
Choose one
Choose
03
Choose one
Choose
04
Choose one
Choose
4f Total open water impacts
4g Comments
5 Pond or Lake Construction
If Pond or lake construction proposed, the complete the chart below
5a
Pond ID number
5b
Proposed use or
purpose of pond
5c
Wetland Impacts (acres)
5d
Stream Impacts (feet)
5e
Upland
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
P1 0 1
Choose one Kiel
P2
Choose one
5f Total
5g Comments
5h Is a dam high hazard permit required?
❑ Yes No If yes permit ID no
51 Expected pond surface area (acres)
n,
5) Size of pond watershed (acres)
16 aau
5k Method of construction
II dA X Ca
6 Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts
below If any impacts require mitigation, then you MUST fill out Section D of this form
6a Project is in which protected basin?
❑ Neuse ❑ Tar Pamlico ❑ Catawba ❑ Randleman R Other
YX
6b
Buffer Impact
number—
Permanent (P) or
Temporary
6c
Reason for impact
6d
Stream name
6e
Buffer
mitigation
required?
6f
Zone 1
impact
(square
feet )
6g
Zone 2
impact
(square
feet
B1
Yes/No
132
Yes/No
B3
Yes /No
B4
Lm
Yes/No
B5
Yes /No
B6
Yes /No
6h Total Buffer Impacts
61 Comments
Page 5 of 10
D Impact Justification and Mitigation
1 Avoidance and Minimization
1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project
P6(14 e'Je a bole
py,�n (d 5hum IOCAMS
lb Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques
ffvk parry #11111MC.I 5(z x, �'f- 11,0 ,01
2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State
2a Does the project require Compensatory Mitigation for
impacts to Waters of the U S or Waters of the State?
❑ Yes N0
2b If yes mitigation is required by (check all that apply)
❑ DWQ ❑ Corps
2c If yes which mitigation option will be used for this
project
❑ Mitigation bank
❑ Payment to in lieu fee program
❑ Permittee Responsible Mitigation
3 Complete if Using a Mitigation Bank
3a Name of Mitigation Bank Al
3b Credits Purchased (attach receipt and letter)
Type C nose one
Type Choose one
Type Choose one
Quantity
Quantity
Quantity
3c Comments
4 Complete if Making a Payment to In lieu Fee Program
4a Approval letter from in lieu fee program is attached
❑ Yes
4b Stream mitigation requested
linear feet
4c If using stream mitigation stream temperature
Choose one
4d Buffer mitigation requested (DWQ only)
square feet
4e Riparian wetland mitigation requested
acres
4f Non riparian wetland mitigation requested
acres
4g Coastal (tidal) wetland mitigation requested
acres
4h Comments
5 Complete if Using a Permittee Responsible Mitigation Plan
5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan
Page 6 of 10
PCN Form — Version 14 January 2009
6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation?
Yes No
6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the
amount of mitigation required
Zone
6c
Reason for impact
6d
Total impact
(square feet)
Multiplier
6e
Required mitigation
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
15
6f Total buffer mitigation required
6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank
permittee responsible riparian buffer restoration payment into an approved in lieu fee fund)
6h Comments
Page 7 of 10
E
Stormwater Management and Diffuse Flow Plan (required by DWQ)
1
Diffuse Flow Plan
la
Does the project include or is it adjacent to protected riparian buffers identified
within one of the NC Riparian Buffer Protection Rules?
❑ Yes No
1 b
If yes then is a diffuse flow plan included? If no explain why
❑ Yes ❑ No
2
Stormwater Management Plan
2a
What is the overall percent imperviousness of this project?
2b
Does this project require a Stormwater Management Plan?
❑ Yes No
2c
If this project DOES NOT require a Stormwater Management Plan explain why
\#49 arf, bUIld1,119 a- pond
2d
If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan
2e
Who will be responsible for the review of the Stormwater Management Plan?
3
Certified Local Government Stormwater Review
3a
In which local governments iurisdiction is this project?
3b
Which of the following locally implemented stormwater management programs
apply (check all that apply)
❑ Phase II
❑ NSW
USMP
[] Su I Watershed
❑ Water Supply
❑ Other
3c
Has the approved Stormwater Management Plan with proof of approval been
attached?
❑Yes ❑ No
4
DWQ Stormwater Program Review
4a
Which of the following state implemented stormwater management programs apply
(check all that apply)
❑Coastal counties
❑HQW
❑ORW
❑Session Law 2006 246
[]Other
4b
Has the approved Stormwater Management Plan with proof of approval been
attached?
❑ Yes ❑ No
5
DWQ 401 Unit Stormwater Review
5a
Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b
Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 8 of 10
PCN Form —Version 14 January 2009
,fir
F
Supplementary Information
1
Environmental Documentation (DWQ Requirement)
la
Does the protect involve an expenditure of public (federal /state /local) funds or the
0 Yes
No
use of public (federal/state) land?
1 b
If you answered yes to the above does the protect require preparation of an
environmental document pursuant to the requirements of the National or State
❑Yes
❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c
If you answered yes to the above has the document review been finalized by the
State Clearing House? (If so attach a copy of the NEPA or SEPA final approval
letter)
❑ Yes
❑ No
Comments
2
Violations (DWQ Requirement)
2a
Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated
Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards
❑ Yes
o
or Riparian Buffer Rules (15A NCAC 2B 0200)?
2b
Is this an after the fact permit application?
❑Yes
o
2c
If you answered yes to one or both of the above questions provide an explanation of the violation(s)
3
Cumulative Impacts (DWQ Requirement)
3a
Will this protect (based on past and reasonably anticipated future impacts) result in
Yes
additional development which could impact nearby downstream water quality?
,No
315
If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy If you answered no provide a short narrative description
4
Sewage Disposal (DWQ Requirement)
4a
Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from
the proposed protect or available capacity of the subject facility
Page 9 of 10
PCN Form — Version 14 January 2009
5 Endangered Species and Designated Critical Habitat (Corps Requirement)
5a Will this project occur in or near an area with federally protected species or
habitat?
❑ Yes ❑ No
5b Have you checked with the USFWS concerning Endangered Species Act
impacts?
❑ Yes ❑ No
5c If yes indicate the USFWS Field Office you have contacted
5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
6 Essential Fish Habitat (Corps Requirement)
6a Will this project occur in or near an area designated as essential fish habitat?
❑ Yes PZNo
6b What data sources did you use to determine whether your site would impact Essential Fish Habitat?
7 Historic or Prehistoric Cultural Resources (Corps Requirement)
7a Will this project occur in or near an area that the state federal or tribal
governments have designated as having historic or cultural preservation
status (e g National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
❑ Yes ❑ No
7b What data sources did you use to determine whether your site would impact historic or archeological resources?
8 Flood Zone Designation (Corps Requirement)
8a Will this project occur in a FEMA designated 100 year floodplain?
❑ Yes %No
8b If yes explain how project meets FEMA requirements
8c What source(s) did you use to make the floodplain determination?
J
Applicant/Agents s Printed Name
AID can Agent s Slgna ur
ature is valid only if an a onzallon
e from the applicant is provided
Date
MA
Page 10 of 10
6/3/12 get attachmentaspx (914x752)
14D cA6) -1 mad'
r
mad aoi com/36210 111 /aoi -6 /en us /mad /get attachment aspx ?uid = 32259142 &folder- NewMad &partld =1 1/1
6/3/12 Google Maps
Gvjgle Get Google Maps on your phone
Texttt*word GMAPS to466453
1 pn m
ry
a a.
i ~
Q,
j n
J Y
r° 7
C3� C2 9U
I t
9
i r r_ c 7
E
x,
T
n
�v
a
5
I �
1 _
I
I ` 4
7 �
E p
roll 3 sR
_ f }
' Im'
012 Google {
Map data 02012 Google
maps google com / ?ie= UTF8 &11 =36 372636 79 095286 &spn =0 002635 0 003449 &t= h&z= 18 &vpsrc =6 &e 1 /1