HomeMy WebLinkAbout520065_30-Day POA_20210216PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 52 - 65 County: Jones Facility Name: Sherall Houston Farm Certified Operator Name: Sherall B. Houston Operator Number: 20094 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): primary Spillway (Yes or No): Level (inches): 2. Check all applicable items no 13 Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30-day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 2/22/2021 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Sherall B. Houston cility Owner/Manager (print) P It cility Owner/101anager (signature) Phone: 252-298-2132 Date: 2/16/2021 PoA Cover Page 2/21/00 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: primary n. lines 1 + 2 + 3 + 4 + 5 + 6 = line m = 426.0 Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN 426.0 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR-t. 2 PAN balance (Ib/acre) TOTAL PAN BALANCE FOR FIELD (Ibs.) u. application window' T58 1 WINTER OVERSEED 6.37 42.00 267.5 Oct. 1 Mar. 31 T58 2 WINTER OVERSEED 5.90 28.40 167.6 Oct. 1 Mar. 31 T58 3 WINTER OVERSEED 3.73 34.00 126.8 Oct. 1 Mar. 31 T58 1 COASTAL BERMUDA 6.37 Mar. 1 - Sept. 30 T58 2 COASTAL BERMUDA 5.90 Mar. 1 - Sept. 30 T58 3 COASTAL BERMUDA 3.73 Mar. 1 - Sept. 30 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. PoA (30 Day) 2/21/00 v. Total PAN available for all fields (sum of column t) = 561.9 Ib. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = x. Crop's remaining PAN balance (line v from section III) = y. Overall PAN balance (w - x) = 426.0 Ib. PAN 561.9 Ib. PAN -136 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: This 30 day Plan of Action is based on the lagoon level, current waste analysis, and irrigation information provided by Ann Houston. Continued rainfall has caused lagoon level to rise above the start pump mark. If weather condition permit the operation is planning to irrigate by 2/22/2021 to lower lagoon level. The waste analysis used to prepare this POA is dated 1/13/2020. Operation will continue Irrigation as weather and field conditions permit. Amanda Hatcher with Duplin SWCD created an amendment to allow winter overseed to be converted from 50 Ibs/ac PAN rate to 100 Ibs/ac rate. PAN applied during December and January is limited to 25 Ibs of N/ac. The operation has an adequate PAN deficit at this time to lower the lagoon to the temporary storage elevations. This 30 day Plan of Action prepared by Kyle Smith, with the Jones Co. SWCD, on 2/16/2021. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): primary 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 2400 certified herd # 13.0 19.5 inches inches 6.5 inches 71442 ft2 289459 gallons 180 81760.4 2448 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 1/13/2021 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 80157 ft3 0 43575 ft3 ft3 154253 gallons 0.96 Ibs/1000 gal. 426.0 Ibs. PAN PoA (30 Day) 2/21/00