HomeMy WebLinkAboutNCC201624_Modification Review LOT 86_20210223Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 2/23/2021 7:19:38 AM (ADD TO FILE Submittal)
Approve by Georgoulias, Bethany 2/23/2021 10:08:30 AM (Construction COC ADD TO FILE Review- NCC201624)
• The task was assigned to Georgoulias, Bethany. The due date is: February 26, 2021 5:00 PM
2/23/2021 7:19 AM
Y . Ta4M1
NORTH CAPOLINA
EnYlrenmemf& Qnalay
Certificate of
NCC201624
Coverage (COC)
Enter the Certificate of Coverage Ninber (Use capital letters)
No.*
Information associated
with this permit:
Project Name
Willoughby lot 41
Address
524 Adkins Ridge Road, Rolesville, NC
County
Wake
Latitude
35.9290
Longitude
-78.4720
Permittee Listed
The Drees Company
Legally Responsible
Jerry Dean
Individual
NC Reference No.
NCG01-2020-1624
E&SC Plan ID
SEC-035645-2020
Original NOI
24654
Tracking No.*
Date COC Issued*
04/23/2020
Prior Rescission
This field will populate only if CCChas already been rescinded.
Date
Modification Information:
Reason for r Closed -Out Lots/Outparcels in E&SC Plan
Modification * F Additional Lots/Outparcels Approved - E&SC Revised
r Other Revision(s) to E&SC Plan
r Legally Responsible Individual and/or Site Contact Has Changed
f Multiple Reasons (List)
Addional IVbre information (e.g., new Site Contact details). If lots are being added, please include specific lot nurTbers.
Explanation
You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan
sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable
sheets).
For changes to the legally responsible individual, you must upload this form.
Supporting Upload Supporting Documentation (%vised E&SCApproval, (lose -Out Doc, etc.)
Documentation WBY86 SEC-052883-2021_Approval-
S&EConstruction Plan ReviewChecklist-V.2 WM 2- 276.43KB
16-2021.pdf
Mast be FDFformat
North Carolina General Statute 143-215.66 (1) provides that:
Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other
documentfiled or required to be maintained under this Artide or a rule implementing this Article; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Artide or rules of the
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to e)ceed ten thousand
dollars ($10,000).
rJ I hereby request modification to coverage under the NPDES Stormwater Permit
for the subject project site. I am familiar with the information contained in this
request and to the best of my knowledge and belief such information is true,
complete and accurate.
Specify if you are:* r The Legally Responsible Individual
f Authorized Responsible Person*
*This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B,
Item (6) of that permit.
Signature
-,9
Type Name* Jerry Dean
Title * Division President
Organization* The Drees Homes Company
Date * 02/23/2021
Email Address* Imartin@dreeshomes.com
Errail for confirmation
Telephone Number* 919.844.9288
Contact number if we need to reach you
Note: Original permittee and site contact are copied on modification correspondence.
Additional Email Additional email for confirmation
(Optional)
Original Permittee Imartin@dreeshomes.com
Email
Original Site Contact dscott@dreeshomes.com
Email
Review Date 02/23/2021
Rescinded Since
Submitted?
Request Date 20210223
Formatted
Review Date 20210223
Formatted