June 20 2012
Johnston County
DWQ Project No 20110639 ver 2
Bridge 102 on SR 1331
TIP No B 4560
MODIFICATION of APPROVAL of 401 WATER QUALITY CERTIFICATION and NEUSE BUFFER
AUTHORIZATION with ADDITIONAL CONDITIONS
Dr Gregory J Thorpe Branch Manager
NCDOT Project Development & Environmental Analysis
1598 Mail Service Center
Raleigh NC 27699 1598
Dear Dr Thorpe
You have our approval in accordance with the conditions listed below for the following additional impacts for the
purpose of replacing Bridge 102 in Johnston County
Additional Wetland Impacts in the Neuse River Basin
Site
Mechanized Clearing (ac)
Total Wetland Impact ac
1
006
006
Total
006
006
Total Additional Wetland Impact for Protect 0 06 acres
Additional Neuse Rip arian Buffer Impacts
Site
Zone 1 Impact (sq
ft )
Zone 1 Buffer Mitigation
Required (using 3 1 ratio
Zone 2 Impact (sq ft)
Zone 2 Buffer Mitigation
Required (using 15 1 ratio
1
3981
N/A
783
N/A
Totals
3981
0
783
0
* n/a = Total for Site is less than 1/3 acre and 150 linear feet of impact no mitigation required
Total Additional Buffer Impact for Project 4 764 square feet
The project shall be constructed in accordance with your application dated received July 7 2011 and modification
request received June 13 2012 After reviewing your application we have decided that these impacts are covered
by General Water Quality Certification Number 3820 This certification corresponds to the General Permit 31
issued by the Corps of Engineers This approval is also valid for the Neuse Riparian Buffer Rules (I 5A NCAC
2B 0233) In addition you should acquire any other federal state or local permits before you proceed with your
project including (but not limited to) Sediment and Erosion Control Non Discharge and Water Supply Watershed
regulations This approval will expire with the accompanying 404 permit
Transportation Permitting Unit
Wetlands & Stormwater Branch
1650 Mad Service Center Raleigh North Carolina 27699 1650
Phone 919 - 807 -63991 FAX 919 -807 6494
Intemet http //h2o en state nc us /nmetlands/
An Equal Opportunity 1 Affirmative Action Employer
One
NorthCarolina
Naturally
This approval is valid solely for the purpose and design described in your application (unless modified below)
Should your project change you must notify the NCDWQ and submit a new application If the property is sold the
new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying
with all the conditions If total wetland fills for this project (now or in the future) exceed one acre or of total
impacts to streams (now or in the future) exceed 150 linear feet compensatory mitigation may be required as
described in 15A NCAC 2H 0506 (h) (6) and (7) Additional buffer impacts may require compensatory mitigation
as described in 15A NCAC 2B 0242(9) For this approval to remain valid you must adhere to the conditions listed
in the attached certification and any additional conditions listed below
Condition of Certification
1 All conditions in the original Water Quality Certification dated July 20 2011 for this project still apply
If you wish to contest any statement in the attached Certification you must file a petition for an administrative
hearing You may obtain the petition form from the office of Administrative hearings You must file the petition
with the office of Administrative Hearings within sixty (60) days of receipt of this notice A petition is considered
filed when it is received in the office of Administrative Hearings during normal office hours The Office of
Administrative Hearings accepts filings Monday through Friday between the hours of 8 OOam and 5 OOpm except
for official state holidays The original and one (1) copy of the petition must be filed with the Office of
Administrative Hearings
The petition may be faxed provided the original and one copy of the document is received by the Office of
Administrative Hearings within five (5) business days following the faxed transmission
The mailing address for the Office of Administrative Hearings is
Office of Administrative Hearings
6714 Mail Service Center
Raleigh NC 27699 6714
Telephone (919) 733 2698 Facsimile (919) 733 3478
A copy of the petition must also be served on DENR as follows
Ms Mary Penny Thompson General Counsel
Department of Environment and Natural Resources
1601 Mail Service Center
Raleigh NC 27699 1601
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act If you
have any questions please contact Rob Ridings at 919 807 6403
Sincerely
Charles Wakild PE
Director
Cc Chad Coggms Division 4 Environmental Officer
Tom Steffens US Army Corps of Engineers Washington Field Office
John Merritt NCDOT Natural Environment Unit
File Copy
NCDWQ Protect No
Applicant
Protect Name
Date of Issuance of 401 Water Quality Certification
County
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules and
any subsequent modifications the applicant is required to return this certificate to the 401 Transportation Permitting
Unit North Carolina Division of Water Quality 1650 Mail Service Center Raleigh NC 27699 1650 This form
may be returned to NCDWQ by the applicant the applicant s authorized agent or the project engineer It is not
necessary to send certificates from all of these
Applicant s Certâ–şftcatcon
I hereby state that to the best of my abilities due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plans and
specifications and other supporting materials
Signature
Agent s Certrf[catcon
Date
I hereby state that to the best of my abilities due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plans and
specifications and other supporting materials
Signature
Engineer s Certification
Date
Partial Final
I as a duly registered Professional Engineer in the State of North
Carolina having been authorized to observe (periodically weekly full time) the construction of the project for the
Permttee hereby state that to the best of my abilities due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules the approved plans and specifications and other supporting materials
Signature
Date
Registration No