HomeMy WebLinkAbout20091115 Ver 1_Certification of Completion_20120612Dennison, Laurie
From: Johnson, Alan
Sent: Tuesday, June 12, 2012 4:34 PM
To: Dennison, Laurie
Subject: FW: Hollybrook Subdivision, Teeter Road, Iredell County
Attachments: dwq 09 -1015 certificate of completion 12- 28- 12_0001.pdf
Thanks
Alan
From: Brewer, Dan [ mailto: Dan. Brewergwspsells.com]
Sent: Monday, June 11, 2012 5:59 PM
To: Johnson, Alan
Subject: Hollybrook Subdivision, Teeter Road, Iredell County
�o q
Alan,
We are trying to record the final plat for Hollybrook Subdivision but William Allison is saying that NCDENR never
acknowledged that they received a Certificate of Completion. I found this in the file that was sent back in late 2010. Can
you check to see if it is on file? If it is not on file, let me know who I need to get this to (unless I just need to send
another copy in to the Mail Service Center).
Also, we had a good food distribution on Friday. J.J. did a great job delegating. You have trained him well. Only one lady
fussed to Ann Hancock about her meet going bad. Ann about took her out!
Thanks,
Dan E. Brewer, P.E.
Vice President
TTY.
128 Overhill Drive, Suite 105
Mooresville, NC 28117
T:704- 662 -0100
F: 704 - 662 -0101
dan.brewer anwsosells.com
www.wspsells.com
1
10/14/2009 15:01 7046648437 PAGE 03
Certificate of Completion
DWQ Project No. a �d� County;
Applicant,
Project Name:
Date of Issuance of 401 Water Quality Certiffeation:�
Upab. completion of all work approved within the 40I Water Quality Certification and Buffer Rules,
and any subsequent modifications, the applicant is required to return. this certificate to the
401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh,
NC, 27699 -1650. This form may be retumed to DWQ by the applicant, the applicant's authorized
agent, or the project engineer. It is not necessary to send certificates from all of these.
,applicant's certifccation
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approved plans and specifications, and other supporting materials.
Signature:
Agent's Certification
Date:
1, , hereby state that, to the best of my abilities, due care and
diligence was used in the observationi of the construction such that the construction was observed to
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approved plans and specifications, artd other supporting materials.
Signature: Date:
If this project was designed by a Certified Professional
as a duly registered Professional (2Liv?ee�r'
RnSineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been
authorized to observe (periodically, weekly, full time) the construction of the project, for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the
observation of the construction such that the construction was observed to built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans
and specifications, and other supporting materials.
Signature: �. Registration No.: 75-g2 Ddte: l2 2LIO